The 100 Series are a series of underground railway cars manufactured by Alstom in Brazil and Argentina for use on the Buenos Aires Underground. They are used on Line D of the network, where they make up the vast majority of the fleet, serving alongside some 300 Series and Fiat-Materfer cars. Since 2019, some units have also been used on the Line E.[1]
100 Series | |
---|---|
Manufacturer | Alstom |
Family name | Alstom Metropolis |
Constructed | 2001-2009 |
Entered service | 2004 |
Number built | 96 |
Number in service | 96 |
Formation | 6 cars per trainset |
Operators | Buenos Aires Underground |
Lines served | |
Specifications | |
Car body construction | Stainless steel |
Doors | 4 per side |
Traction system | Alstom ONIX 1500 IGBT-VVVF |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
History
editThe 100 Series was initially purchased for use on Line A to replace the ageing La Brugeoise cars. However, they ended up replacing the slightly newer Siemens-Schuckert Orenstein & Koppel cars, which were allocated to Line D instead.
Originally, the purchase consisted of 80 cars for a total of 16 trains made up of 5 cars each, due to the shorter platform length on Line A. However, 16 more 100 Series cars were purchased up until 2009, making a total of 96 cars and allowing each train to have 6 cars, making full use of the line's platforms.[2]
In 2015, the cars began to receive a mid-life refurbishment, primarily to add air conditioning, but also incorporating enhancements to the interior. This included improved lighting and new upholstery.[3] Despite enjoying a successful service life, they are also the noisiest cars on the network.[4]
Between 2017 and 2019, New Alstom 300 Series cars replaced the Fiat-Materfer cars and served alongside the existing 100 Series cars.[5] By 2022, Almston has signed three new maintenance contracts in Argentina to ensure the safety and accessibility of the transit's track, signal systems, tunnels, bridges, vehicles, and stations.[6] The project is expected to take 19 months, with its operation set on Line E once completed.[7]
See also
editReferences
edit- ^ "Ya funciona el primer tren Alstom en la línea E". enelSubte (in Spanish). 5 November 2019. Retrieved 16 March 2022.
- ^ Finalizó la entrega de los Alstom Metrópolis - EnElSubte, 9 March 2009.
- ^ "Los pasajeros del subte D ya viajan con aire acondicionado". La Razon. 4 March 2015. Archived from the original on 2015-12-08. Retrieved 28 November 2015.
- ^ "Subte ruidoso". EnElSubte. 23 June 2015. Retrieved 28 November 2015.
- ^ "INFORMACIÓN GENERAL No habrá coches nuevos para la línea D". Noticias de la Aldea. Archived from the original on 8 December 2015. Retrieved 28 November 2015.
- ^ Allan, Keri (2022-01-31). "Argentina: Alstom Awarded EMOVA and Trenes Argentinos Maintenance Contracts". Railway-News. Retrieved 2024-04-20.
- ^ Allan, Keri (2022-08-31). "Alstom Awarded New Buenos Aires Trainset Maintenance Contract". Railway-News. Retrieved 2024-04-20.