Bulgana Green Power Hub is a wind farm north of Stawell in the Australian state of Victoria. The project is owned by Neoen. Construction of the 56 wind turbines, with a total generation capacity of 194MW, was completed in August 2019,[1][2] and connections to the national grid reached full capacity in 2021.[3]
Bulgana Green Power Hub | |
---|---|
Country |
|
Coordinates | 37°05′51″S 142°58′25″E / 37.097439°S 142.973608°E |
Status | Under construction |
Construction began |
|
Construction cost |
|
Wind farm | |
Type | |
Power generation | |
Units operational | 56 × 3.4 MW |
Make and model | Siemens Gamesa SG 3.4-132 (56) |
Nameplate capacity |
|
Storage capacity |
|
External links | |
Website | bulganagreenpowerhub |
90% of the energy is contracted for supply to the Government of Victoria.[4] The EPC contract and 25 years of maintenance is with Siemens Gamesa Renewable Energy.
References
edit- ^ Gartlan, JessieAnne (19 August 2019). "All 56 wind turbines have been installed at the Landsborough site". Ararat Advertiser. Retrieved 12 November 2019.
- ^ Williams, Lachlan (13 February 2019). "First wind turbine installed at Bulgana Green Power Hub". Stawell Times-News. Retrieved 12 November 2019.
- ^ Paul, Sonali (29 December 2021). "Neoen says Australian wind farm hits full tilt, two years behind plan". Reuters. Retrieved 29 January 2022 – via www.reuters.com.
- ^ "Bulgana signs MoU with Victorian Government". Neoen. 27 June 2017. Retrieved 12 November 2019.