Chandranigahpur Solar Project

Chandranigahpur Solar Project is a 4 MW solar station located at Rautahat District, Province No. 2; Nepal. The plant is owned and run by Api Power Company Pvt. Ltd., an IPP. The plant came in operation in February 2021. [2]

Chandranigahpur Solar Project
Map
CountryNepal
LocationChandranigahapur , Rautahat District
Coordinates27°07′12″N 85°22′17″E / 27.12000°N 85.37139°E / 27.12000; 85.37139
StatusOperational
Construction began2020
Commission date2021
OwnerApi Power Company Pvt. Ltd
Solar farm
Type
Feed-in tariffNPR 7.5[1]

Power Generation

edit
Fiscal Year 2078/079[3] 2079/080[4]
०४ श्रावण - 502890
०५ भाद्र 514630 525550
०६ असोज 533820 546470
०७ कार्तिक 532780 523610
०८ मंसिर 467790 412470
०९ पुस 366110 281590
१० माघ 375030 351290
११ फागुन 624160 446100
१२ चैत 566160 605580
०१ बैशाख 624160 531710
०२ जेठ 591720 655400
०३ असार 570100 462370
Total 5,766,460 5342140

See also

edit

References

edit
  1. ^ "NEA, API Power sign PPA". My Republica. Retrieved 2022-11-29.
  2. ^ "Power Plants :: Solar". Retrieved 2022-11-29.}
  3. ^ अपि पावर कम्पनी लिमिटेड. "१९औँ वार्षिक प्रतिवेदन (आव २०७८/०७९)". अपि पावर कम्पनी लिमिटेड. {{cite web}}: Missing or empty |url= (help)
  4. ^ अपि पावर कम्पनी लिमिटेड. "२०औँ वार्षिक प्रतिवेदन (आव २०७९/०८०)". अपि पावर कम्पनी लिमिटेड. {{cite web}}: Missing or empty |url= (help)