This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|
Coeur d'Alene Subdivision[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Coeur d'Alene Subdivision is a railway line running about 12.3 miles (19.8 km) from Coeur d'Alene, ID to Hauser Junction near Hauser, ID. It is operated by BNSF Railway.
The territory is track warrant controlled.
BNSF has since removed the line from Coeur d'Alene to Hutter, ID. Currently the subdivision is currently only 8.4 miles (13.5 km) but the rail line is still timetabled to Coeur d'Alene
References
edit- ^ BNSF Northwest Division Timetable No. 5
External links
edit