Dalang Town railway station (simplified Chinese: 大朗镇站; traditional Chinese: 大朗鎮站; pinyin: Dàlǎng Zhèn Zhàn; Jyutping: Daai6long5 Zan3 Zaam6) is a railway station in Dalang, Dongguan, Guangdong, China. It opened on December 28, 2017.[1]
Chinese name | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 大朗镇站 | ||||||||||
Traditional Chinese | 大朗鎮站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Changlang Road (常朗路), Dalang, Dongguan, Guangdong China | ||||||||||
Coordinates | 22°57′25″N 113°56′37″E / 22.957042°N 113.943747°E | ||||||||||
Owned by | Pearl River Delta Metropolitan Region intercity railway | ||||||||||
Operated by | Guangdong Intercity Railway Operation Co., Ltd. | ||||||||||
Line(s) | Guangzhou–Huizhou intercity railway | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 4 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | KOQ (Pinyin: DLZ) | ||||||||||
History | |||||||||||
Opened | 28 December 2017 | ||||||||||
Services | |||||||||||
|
The station has 4 exits planned, lettered A-D. Exits A and D opened when the station opened, Exit B has been built but not opened, and Exit C is reserved.[2]
History
editThe station was named Dalang during planning and construction and was originally an elevated station. In 2010, after the Ministry of Railways intervened in the construction of the Pearl River Delta Metropolitan Region intercity railway, the line scheme was redesigned. Finally, at the suggestion of Dongguan City and the towns and streets along the line, in order to avoid cutting the urban planning, the urban area of Dongguan and the Liaobu and Changping sections were changed from elevated to underground, so the station was adjusted to an underground station, and moved about 1km eastward to the current site.[3]: 87, 92–97 [4]
In order to avoid the same name as the national railway station, the station was named Dalang Town at the end of 2015.[5]
References
edit- ^ 刘光明宝 (2017-12-29). "惠州小金口至东莞道滘全程约60分钟" [The journey from Huizhou Xiaojinkou to Dongguan Daojiao takes about 60 minutes]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-06-04. Retrieved 2024-08-09 – via Sina Corporation.
- ^ "莞惠城轨"大朗镇站"即将开启!" [The "Dalang Town Station" of the Dongguan-Huizhou Intercity Rail is about to open!]. Dalang Town People's Government (in Simplified Chinese). 2017-12-13. Archived from the original on 2024-06-23. Retrieved 2024-08-09 – via Sohu.
- ^ "东莞至惠州城际轨道交通项目(变更)环境影响报告书(全本公示)" [Dongguan to Huizhou Intercity Rail Transit Project (Change) Environmental Impact Report (Full Publication)]. China Railway Engineering Design Consulting Group Co., Ltd. (in Simplified Chinese). 2015-11-20. Archived from the original on 2019-05-10. Retrieved 2024-08-09.
- ^ 曾德军 (2009-12-16). "莞惠城轨常平两站点敲定" [Two Changping stations of Dongguan-Huizhou intercity rail are finalized]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-06-23. Retrieved 2024-08-09 – via Sina Corporation.
- ^ 龚萍 (2015-11-12). "莞惠城轨10个站点要更名" [10 stations on Dongguan-Huizhou intercity rail to be renamed]. Southern Metropolis Daily (in Simplified Chinese). Archived from the original on 2018-02-27. Retrieved 2024-08-09.