Daqing station (Chinese: 大慶車站; Hanyu Pinyin: Dàqìng Chēzhàn; Tongyong Pinyin: Dàcìng Chejhàn) is a railway and metro station located in South District, Taichung, Taiwan. It is served by the Taiwan Railways Administration and Taichung Metro. The metro station opened on December 19, 2020.
TRA railway station | |||||||||||
General information | |||||||||||
Location | South, Taichung, Taiwan | ||||||||||
Coordinates | 24°07′07.8″N 120°38′52.2″E / 24.118833°N 120.647833°E | ||||||||||
Owned by | Taiwan Railways Administration | ||||||||||
Operated by | Taiwan Railways Administration | ||||||||||
Line(s) | Taichung | ||||||||||
Train operators | Taiwan Railways Administration | ||||||||||
History | |||||||||||
Opened | 7 July 1998 16 October 2016 (elevated) | ||||||||||
Passengers | |||||||||||
5,818 daily (2023) [1] | |||||||||||
Services | |||||||||||
|
Daqing 115 大慶 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Operated by | |||||||||||
Line(s) | |||||||||||
Platforms | 2 side platforms | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Other information | |||||||||||
Station code | 115 | ||||||||||
History | |||||||||||
Opened | 25 April 2021 | ||||||||||
Services | |||||||||||
|
Overview
editThe station began as a TRA at-grade local station. The TRA station was elevated on October 28, 2018, as part of the modernization process on the Taichung Line.[2] The metro portion of the station is also elevated, and the two are connected by a bridge.[3][4]
The station is primarily serviced by Local Trains (區間車). A few times per day a Chu-Kuang Express (莒光號) or a Tzu-Chiang Limited Express (自強號) stops at the station.
Station layout
editSide platform | ||
← Taichung Line: towards Changhua, Kaohsiung (Wuri) | ||
Taichung Line: towards Zhunan, Taipei (Wuquan) → | ||
Side platform | ||
1F | Lobby | Station entrance, ticketing machine, information counter |
Around the station
editSee also
editReferences
edit- ^ Taiwan Railway Corporation (June 2024). "表6 各站客貨運起訖量 Table 6 Volume of Passenger & Freight Traffic". 中華民國112年臺灣鐵路統計年報 Statistical report of Taiwan Railways -2023- (Report) (in Chinese (Taiwan) and English). Taiwan Railway Corporation. pp. 20–31. Archived from the original on 2024-05-22. Retrieved 2024-08-16.
- ^ 張菁雅 (October 28, 2018). "台中鐵路高架化全線通車 蔡總統:台中交通發展邁入新紀元" (in Chinese (Taiwan)). Liberty Times. Retrieved October 18, 2019.
- ^ "臺中捷運未來營運計畫" (PDF). Transportation Bureau of Taichung City (in Chinese (Taiwan)). Taichung Metro. May 8, 2017. Retrieved October 15, 2019.
- ^ 郝雪卿、蘇木春 (2020-11-15). "台中捷運綠線試營運16日起1個月免費搭 市民興奮終於等到了[影]". 中央通訊社.
Wikimedia Commons has media related to TRA Daqing Station.