Dashadong Station (Chinese: 大沙东站), formerly Dashadi Station (大沙地站) during planning,[1][2] is an interchange station between Line 5[3] and Line 7 of the Guangzhou Metro. It is located underground the junction of East Dashadi Road (大沙地东路) and Zhendong Road (镇东路), in the Huangpu District.[4][5] Line 5 opened on 28 December 2009,[6] whilst Line 7 opened on 28 December 2023.[7]

Dashadong

大沙东
Guangzhou Metro
Line 7 platform
Chinese name
Simplified Chinese大沙东站
Traditional Chinese大沙東站
Literal meaningDasha East Station
Transcriptions
Standard Mandarin
Hanyu PinyinDàshādōng Zhàn
Yue: Cantonese
Jyutpingdaai6saa1dung1 zaam6
General information
LocationDashadi East Road (大沙地东路) and Zhendong Road (镇东路)
Huangpu District, Guangzhou, Guangdong
China
Coordinates23°06′21″N 113°27′29″E / 23.10585°N 113.45793°E / 23.10585; 113.45793
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 5
     Line 7
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code523 714
History
Opened28 December 2009; 14 years ago (2009-12-28) (Line 5)
28 December 2023; 10 months ago (2023-12-28) (Line 7)
Services
Preceding station Guangzhou Metro Following station
Dashadi
towards Jiaokou
Line 5 Wenchong
Yufengwei
towards Meidi Dadao
Line 7 Jitang
towards Yanshan

It is the deepest station on the Phase 2 extension of Line 7.[8]

Station layout

edit

Line 5

edit
G - Exits A, C
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities
Transfer passageway to Line  7 
L2
Equipment Area
- Station equipment
L3
Platforms
Platform 2    5  towards Jiaokou (Dashadi)
Island platform, doors will open on the left
Platform 1  5  towards Huangpu New Port (Wenchong)  

Line 7

edit
G - Exits D, E
Mezzanine Exit F buffer level Security check, Towards exit F and transfer passageway
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities
Transfer passageway Transfer passageway to Line  5 
Toilets, infant rooms (non-paid area)
L2
Equipment Area
- Station equipment
L3
Buffer Level
- Station equipment, towards concourse and platforms
L4
Platforms
Platform 4    7  towards Meidi Dadao (Yufengwei)
Island platform, doors will open on the left
Platform 3  7  towards Yanshan (Jitang)  

[8]

Exits

edit
Exit number Exit location
Exit A Dashadi Donglu
Exit C Dashadi Donglu
Exit D Zhendong Lu
Exit E Dashadi Donglu
Exit F Dashadi Donglu
edit

References

edit
  1. ^ 广州地铁五号线概况 (in Simplified Chinese). Archived from the original on 2009-09-30. Retrieved 2009-03-23.
  2. ^ 广州地铁站以企业命名引来居民不满导致改名 (in Simplified Chinese). Archived from the original on 2011-09-27. Retrieved 2009-03-23.
  3. ^ Metro Line 5 Opens This December Archived 2012-08-03 at archive.today
  4. ^ 廣州地鐵五號線投標申請人報名提交資料一覽表 (in Simplified Chinese). Archived from the original on 2011-07-08. Retrieved 2009-03-23.
  5. ^ 黄埔公园-大沙地区域:能否借地铁站起来? (in Simplified Chinese).
  6. ^ Guangzhou Metro line Five to Open in December 2009
  7. ^ "广州地铁七号线二期和五号线东延段开通运营,长洲岛派出舞狮喜迎开通". 新快报 (in Simplified Chinese). 2023-12-28. Archived from the original on 2023-12-28. Retrieved 2024-01-05.
  8. ^ a b 郑慧梓 (2023-11-03). "冲刺年底开通,地铁七号线二期全线进入运营调试". 南方日报 (in Simplified Chinese). Archived from the original on 2023-11-03. Retrieved 2024-01-05.
edit