The Delhi Metroneo is a planned 19.09 km (11.86 mi) Metrolite system with 21 stations that will connect Kirti Nagar to Bamnoli Village via Mayapuri, Hari Nagar, Tihar Jail, Dwarka Sector 2, Sector 7, Sector 6, Sector 20, and Sector 23, and the Dwarka ECC.Earlier the corridor was planned as a Metrolite but in November 2020, the project was cancelled, replacing the corridor with Metro Neo by the DMRC officials.[1][2][3] It will be designed as per MoHUA's Metrolite specifications,[4] and will be much cheaper to construct because of its lower speeds and carrying capacities compared to regular metros. Detailed Project Report (DPR) for this line was approved by DMRC's board in October 2019, and is currently awaiting the Delhi Government's approval.[5]
Delhi Metroneo | |
---|---|
Overview | |
Status | Planned |
Owner | Delhi Metro |
Locale | Delhi |
Termini |
|
Stations | 21 |
Service | |
Type | Light rail transit |
System | Delhi Metro |
Operator(s) | Delhi Metro Rail Corporation |
Technical | |
Line length | 19.09 km (11.86 mi) |
Number of tracks | 2 |
Character | At-Grade |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Signalling | CBTC |
Stations
editThe stations proposed for the Metro Neo are:
Delhi Metroneo | ||||||||
---|---|---|---|---|---|---|---|---|
No. | Station Name | Phase | Opening | Interchange Connection | Station Layout | Platform Level Type | Depot Connection | |
English | Hindi | |||||||
1 | Kirti Nagar | कीर्ति नगर | 4 | Blue Line Green Line |
At Grade | Side | None | |
2 | Saraswati Garden | सरस्वती गार्डन | 4 | At Grade | Side | None | ||
3 | Mayapuri Bus Depot | मायापुरी बस डिपो | 4 | At Grade | Side | None | ||
4 | Mayapuri | मायापुरी | 4 | Pink Line | At Grade | Side | None | |
5 | Hari Nagar Block BE | हरि नगर ब्लॉक बीई | 4 | At Grade | Side | None | ||
6 | Mayapuri Industrial Area | मायापुरी औद्योगिक क्षेत्र | 4 | At Grade | Side | None | ||
7 | Mayapuri Industrial Area - II | मायापुरी औद्योगिक क्षेत्र - २ | 4 | At Grade | Side | None | ||
8 | Lajwanti Garden | लाजवंती गार्डन | 4 | At Grade | Side | None | ||
9 | Shivpuri | शिवपुरी | 4 | At Grade | Side | None | ||
10 | Dabri Village | डाबरी विलेज | 4 | At Grade | side | None | ||
11 | Sitapuri Extension | सीतापुरी एक्सटेंशन | 4 | At Grade | Side | None | ||
12 | Mahavir Enclave | महावीर एन्क्लेव | 4 | At Grade | Side | None | ||
13 | Dwarka Sector 2 | द्वारका सेक्टर २ | 4 | At Grade | Side | None | ||
14 | Dwarka Sector 7 | द्वारका सेक्टर ७ | 4 | At Grade | Side | None | ||
15 | Dwarka Sector 6 | द्वारका सेक्टर ६ | 4 | At Grade | Side | None | ||
16 | Dwarka Court | द्वारका कोर्ट | 4 | At Grade | Side | None | ||
17 | Dwarka Sector 20 | द्वारका सेक्टर २० | 4 | At Grade | Side | None | ||
18 | Dwarka Sector 23 | द्वारका सेक्टर २३ | 4 | At Grade | Side | None | ||
19 | Dhul Siras Village | धुल सिरस विलेज | 4 | At Grade | Side | None | ||
20 | Yashobhoomi
Dwarka Sector 25 |
यशोभूमि द्वारका सेक्टर २५ | 4 | At Grade | Side | None | ||
21 | Dwarka Sector 28 | द्वारका सेक्टर २८ | 4 | At Grade | Side | None |
See also
editReferences
edit- ^ "Delhi Metrolite - Info, Route Map, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 27 March 2020.
- ^ Roy, Sidharatha (4 November 2021). "Delhi: Metrolite runs into rough weather before ride starts". Times of India. New Delhi. Retrieved 14 December 2023.
- ^ "DMRC - Network map". www.delhimetrorail.com. Retrieved 23 February 2022.
- ^ "Standard Specifications - Light Urban Rail Transit System: 'Metrolite'" (PDF). mohua.gov.in. Ministry of Housing & Urban Affairs. Retrieved 14 December 2023.
- ^ "Chapter 12, Transport - Economic Survey of Delhi, 2021-22" (PDF). delhiplanning.delhi.gov.in. Delhi Government. 20 March 2023. p. 8. Retrieved 14 December 2023.
DMRC has submitted DPR for next 3-corridors of Delhi Metro Phase-IV with the corridor between Rithala and Narela (METRO LITE) and Lajpat Nagar to Saket G-Block and Inderlok to Indraprastha being metro corridors.