Blue Line (Namma Metro)

The Blue Line or ORR-Airport Metro Line is part of the Namma Metro rail network for the city of Bangalore, Karnataka, India. It consists of two sections - Phase-2A (Central Silk Board to Krishnarajapura) and Phase-2B (Krishnarajapura to Airport). Construction of Phase-2A began in August 2021. Construction of Phase-2B began in February 2022. The 58.19 km line connects Central Silk Board with the Kempegowda International Airport. The Line is mostly elevated but also has an at-grade (surface) section close to the Airport and 2 short underground sections where it passes the Jakkur Aerodrome and Yelahanka AFB. There are 30 stations on the line of which the two station/s at the Airport may be at surface level or underground. Blue Line will have interchanges with the Yellow Line at Central Silk Board, Purple Line at KR Pura, Pink Line at Nagawara and with the future /proposed Orange Line at Hebbal.

Blue Line
Overview
Other name(s)ORR East-Airport Metro Line
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
LocaleBangalore, Karnataka, India
Termini
Stations13 (Phase-2A) + 16 (Phase-2B) = 29
03 (Phase-2B) - Future stations
Websitebmrc.co.in
Service
TypeMetro
SystemNamma Metro
Depot(s)Baiyappanahalli, Doddajala
History
Planned openingPhase 2A - June 2026; 1 year's time (2026-06)
Phase 2B - June 2026; 1 year's time (2026-06)
Technical
Line length58.19 km (36.16 mi)
Number of tracks2
CharacterElevated, At Grade, Underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Blue Line Map (TBC)

Central Silk Board
Yellow Line
Under construction
HSR Layout
Agara
Ibbaluru
Bellandur
Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Doddanekundi
DRDO Sports Complex
Sarasvathi Nagar
Krishnarajapura Krishnarajapuram railway station
Mainline rail interchange Baiyappanahalli Depot (U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under construction
Veerannapalya
Kempapura
Hebbala Hebbal railway station
Red Line
Planned
Kodigehalli
Jakkur Cross
Jakkur Plantation (no scope)
Yelahanka
Bagalur Cross
Bettahalasuru (no scope)
Chikkajala (future)
Doddajala
Mainline rail interchange Doddajala Depot (U/C)
(at-grade)
Airport City
KIAL Terminals

In June 2022, BMRCL launched the first ever U Girder span on ORR-Airport metro line.[1][2][3] The extension of the Purple Line and construction of the Pink and Yellow Lines is currently in progress. The Pink, Yellow and Blue lines will be CBTC-signaling enabled, unlike Namma Metro's first two lines (Purple and Green lines use distance-signaling). In June 2023, the Deputy Chief Minister of Karnataka D. K. Shivakumar informed that Metro line to Kempegowda International Airport will be completed by June 2026, plus or minus 3 months.[4][5][6]

History

edit

The routes under Phase-2A and Phase-2B (Blue Line) were actually part of Phase-3 but 'fast-tracked' and prioritized under Phase-2. As early as in February 2012, the Central government had also requested BMRC to start work on the airport link during Phase 2 itself.[7][8]

The route from Central Silkboard to K R Puram along the eastern part of Outer Ring Road (ORR) was included as Phase-2A since development on that part of ORR had leap-frogged much ahead of the rest of the city with huge number of new office buildings. As a result, traffic increased several fold with employees traveling from different parts of the city to this new CBD. Chief Minister of Karnataka, Siddaramaiah announced in September 2016 that a new 18 km (11 mi) line connecting Central Silk Board with K.R.Puram along ORR would be included in Phase 2 as Phase-2A of the project at an estimated cost of ₹4202 crores.[9][10]

Kempegowda International Airport (opened during May 2008) being very far from city center (about 35 km), commuting time by road in traffic congestion is time-consuming. Hence, attention for building a fast mass transit was in the minds of planners from the very beginning, especially since air traffic had kept increasing. The old airport in Bengaluru, the HAL Airport, located well within the city, had closed for commercial operations as part of the terms of the PPP for the new airport.

To connect airport to city, there had initially been a proposal to build a 33 km (21 mi) high speed rail line from MG Road to Kempegowda International Airport (KIA). Cost was estimated at ₹5,767 crore (US$810 million). This was to be executed by an independent SPV - Bangalore Airport Rail Link Limited (BARLL).[11] However, the plan for an exclusive city-airport high speed rail was canceled during October 2013 due to high cost and viability concerns.[12]

It was decided that BMRC would manage the airport rail project and a regular metro line with fewer halts would be built instead of a high speed rail. Following this, suggestions were invited from public during September 2016 to choose any one of nine possible extension routes from existing and proposed metro lines to the airport.[13] The proposed extension routes had an average length of 30 km (19 mi), and cost estimates ranged between ₹4,500 crore and ₹7,000 crore. A 25.9 km (16.1 mi) extension from Nagawara via Kannur and Bagaluru was the shortest, while the 35.4 km (22.0 mi) extension from Yeshwanthpur via Yelahanka, Kannur and Bagaluru was the longest of the proposed routes. BMRC received 1,300 responses from the public.[14] The shortest (25.9 km, 16.1 mi) extension of the Kalena Agrahara (previously Gottigere) – Nagawara line via Kannur and Bagaluru to the airport emerged as the most popular choice.[15] In February 2017, the Centre requested BMRC to start work on the airport link before Phase 3. Thus, the Airport Line was included in Phase 2 as Phase 2B.[16]

Since the airport's managing company, Bengaluru International Airport Limited (BIAL) forbade underground construction from the southern side of the airport (due to security concerns as it would have to pass beneath the airport's second runway), the shortest route options (i.e. extending the Pink line from Nagawara directly north) were eliminated. An alternate route proceeding north till RK Hegde Nagar and then turning west to Jakkur and then along Airport Road was explored. Bangalore Development Minister K. J. George announced on 12 May 2017 that the government had finalized the Nagawara—Ramakrishna Hegde Nagar—Jakkur—Yelahanka route to the airport.[17] However, this route had an obstacle as a high-pressure petroleum pipeline was passing through the originally proposed route.[18]

This was changed and on 10 January 2019, the State Cabinet approved a change in alignment for the proposed metro line to the airport. The new line would begin at Krishnarajapura (K.R. Puram) and be aligned along the northern part of ORR (Outer Ring road), passing Kasturinagar, Nagawara, Hebbal, and Jakkur before heading towards the airport. The line would be 38 km long, about 9 km longer than the route previously proposed, estimated to cost ₹10,584 crore (US$1.5 billion).[19]

Tendering

edit
Blue Line
Tendering Section Length Successful Bid /Cost Contractor Award
Package 2A/P1/60(a) Central Silk Board - Kodibeesanahalli 9.859 km (6.126 mi) 785.25 crore (US$94 million) Afcons 25 May 2021
Package 2A/P2/60(b) Kodibeesanahalli - KR Puram 9.774 km (6.073 mi) 623.55 crore (US$75 million) Shankaranarayana 25 May 2021
Package 2B/P2/69(a) KR Puram - Kempapura 11.003 km (6.837 mi) 739.04 crore (US$89 million) NCC 17 Nov 2021
Package 2B/P2/69(b) Kempapura - Bagalur Cross 11.678 km (7.256 mi) 747.99 crore (US$90 million) NCC 17 Nov 2021
Package 2B/P2/69(c) Bagalur Cross - KIAL Terminals 15.011 km (9.327 mi) 680.21 crore (US$82 million) NCC 17 Nov 2021
Project Management Consultant 20.58 crore (US$2.5 million) RITES 17 Dec 2021
Baiyappanahalli Depot 249.19 crore (US$30 million) J Kumar – AICPL JV 18 Mar 2023
Airport Depot 182.39 crore (US$22 million) J Kumar – AICPL JV 18 Mar 2023
Ballastless Track Work 500.94 crore (US$60 million) Larsen & Toubro 02 Jun 2023
Rolling Stock (222 Coaches) 2,217.78 crore (US$270 million) BEML 08 Aug 2023
Track Turnout 29.98 crore (US$3.6 million) Vossloh 22 Mar 2024
Engineering, Supply, Erection, Testing and Commissioning of Power Supply 248.61 crore (US$30 million) KEC International 10 Jun 2024
750V DC Third Rail electrification 764.64 crore (US$92 million) SiemensRVNL JV 11 Jun 2024
Total 58.19 km (36.16 mi) 7,790.15 crore (US$930 million)

Phase-2A

edit

BMRCL prepared the detailed project report for the proposed Central Silk Board - KR Puram Line and submitted the DPR to the state government on 28 October 2016. Phase 2A was approved by the State Cabinet on 1 March 2017.

Tenders for the ORR (East) Metro line were called in February 2018 and IL&FS emerged the lowest bidder for all packages. However, the tenders were quashed due to cash flow problems and bankruptcy proceedings by the selected firm, IL&FS. A second round of tendering was done in December 2019.[20] The project cost was revised to ₹5994 crores.[20] Fresh bids were received by multiple firms in March 2020.[21][22] There are two packages. The first package included 2.84 km of ramps for a flyover at Central Silk board junction in addition to 9.859 km of viaduct with six elevated stations. The second package was for 8.377 km viaduct with seven elevated stations, 1.097 km depot line and a 0.30 km pocket track.

Central government's approval was much delayed[23][24] and finally received in April-2021.[25] Tenders were awarded in May-2021 and construction on Phase-2A finally began in August-2021.[26] Opening of this phase as per August 2022 from MD of BMRCL is expected around December 2024.

Phase-2B

edit

DPR for the Airport Line had been prepared in September 2017[27][28] and cleared by Government of Karnataka in January 2019.[19]

Tenders for the Airport line were called in July 2020. There are three packages. The first package was for 11.003 km viaduct, including 281 mtrs viaduct beyond Phase-2A with eight elevated stations and 650 mtrs link line to Baiyyappanahalli depot. The second package was for 11.678 km viaduct with 250 mtrs pocket track and two elevated stations. The third package was for 15.011 km viaduct, including 718.18 mtrs cut and cover portion in front of Yelahanka Air Force Station. All three packages include road widening, utility diversion and allied works.

Bettadahalasuru station would be built by Embassy group at a cost of ₹140 crore. Kempegowda International Airport is likely to fund the construction of two airport stations off the highway.[29][30] An MoU was signed between BMRC and KIAL for construction of the 4.95 km line and stations entailing an investment of ₹800 crore.

Central government's approval was delayed[23][24] and finally received in April 2021.[25] Nagarjuna Construction Company (NCC) emerged as the lowest bidder to construct the line on September 16, 2021. Construction finally began in February 2022. Opening of this phase as per August 2022 from MD of BMRCL is expected around December 2025.

In January 2023, there was an accident when an reinforcement cage of the under-construction metro pier fell on a woman software engineer, Tejaswini Sulakhe and her son Vihan in HBR Layout,[31][32] which led to their eventual death.[33][34] BMRCL announced a financial assistance of 20 lakh.[35][36] Chief Minister Basavaraj Bommai also announced a separate compensation of Rs 10 lakh for each of the deaths from the Chief Ministers’ Relief Fund.[37][38]

Funding

edit

The Union and State governments will contribute ₹3,973 crore by way of equity and subordinate debt. Land acquisition costs, estimated at ₹2,762 crore, will be funded by the Government of Karnataka. BMRCL will raise the remaining amount of ₹5,960 crores through loans. In March-2021, it had entered into a loan agreement with JICA for US$318 million (₹2,317 crore). BMRC has raised US$500 million (₹3643 crore) from ADB to fund construction of the Blue Line (Phase-2A and 2B).[39][40]

Thus, financial arrangements have been completed for Phases 2A and 2B. The 58.19-km line is estimated to cost ₹14,788 crores.[41]

On June 10, 2024, Rail Vikas Nigam Ltd. (RVNL) disclosed in a BSE filing that its joint venture with Siemens has secured a contract worth approximately Rs. 762 crore from Bangalore Metro Rail Corporation. This contract encompasses the 750V DC third rail electrification work under package EPC5-CC for the 57 km Blue Line of the Namma Metro. [42]

Stations

edit

The Blue Line will have 30 stations.

 
Blue Line
Phase-2A (Expected January 2026)
# Station Name Connections Station Layout Platform Level Type
English Kannada
1 Central Silk Board ಕೇಂದ್ರ ರೇಷ್ಮೆ ಮಂಡಳಿ   Yellow Line (Under Construction) Elevated Side
2 HSR Layout ಎಚ್‌ ಎಸ್‌ ಆರ್ ಬಡಾವಣೆ Elevated Side
3 Agara ಅಗರ   Red Line (Proposed) Elevated Side
4 Ibbaluru ಇಬ್ಬಲೂರು   Red Line (Proposed) Elevated Side
5 Bellandur ಬೆಳ್ಳಂದೂರು Elevated Side
6 Kadubeesanahalli ಕಾಡುಬೀಸನಹಳ್ಳಿ Elevated Side
7 Kodibeesanahalli ಕೋಡಿಬೀಸನಹಳ್ಳಿ Elevated Side
8 Marathahalli ಮಾರತಹಳ್ಳಿ Elevated Side
9 ISRO ಇಸ್ರೋ Elevated Side
10 Doddanekundi ದೊಡ್ದನೆಕ್ಕುಂದಿ Elevated Side
11 DRDO Sports Complex ರ.ಸಂ.ಅ.ಸಂ. ಕ್ರೀಡಾ ಸಂಕೀರ್ಣ Elevated Side
12 Sarasvathi Nagar ಸರಸ್ವತಿ ನಗರ Elevated Side
13 Krishnarajapura ಕೃಷ್ಣರಾಜಪುರ   Purple Line
  Krishnarajapuram
Elevated Side
Phase-2B (Expected around June 2026)
14 Kasturi Nagar ಕಸ್ತೂರಿನಗರ Elevated Side
15 Horamavu ಹೊರಮಾವು Elevated Side
16 HRBR Layout ಎಚ್‌ ಆರ್‌ ಬಿ ಆರ್ ಬಡಾವಣೆ Elevated Side
17 Kalyan Nagar ಕಲ್ಯಾಣ ನಗರ Elevated Side
18 HBR Layout ಎಚ್‌ ಬಿ ಆರ್ ಬಡಾವಣೆ Elevated Side
19 Nagawara ನಾಗವಾರ   Pink Line (Under Construction) Elevated Side & Island
20 Veerannapalya ವೀರಣ್ಣಪಾಳ್ಯ Elevated Side
21 Kempapura ಕೆಂಪಾಪುರ   Orange Line (Planned) Elevated Side
22 Hebbala ಹೆಬ್ಬಾಳ   Hebbal;   Hebbal TTMC;

  Orange Line (Planned);   Red Line (Proposed)

Elevated Side
23 Kodigehalli ಕೊಡಿಗೇಹಳ್ಳಿ Elevated Island
24 Jakkur Cross ಜಕ್ಕೂರು ಅಡ್ಡ Elevated Island
25 Jakkuru Plantation ಜಕ್ಕೂರು ತೋಟ No Scope
26 Yelahanka ಯಲಹಂಕ Elevated Island
27 Bagalur Cross ಬಾಗಲೂರು ಅಡ್ಡ Elevated Island




28 Doddajala ದೊಡ್ಡಜಾಲ Elevated Side
29 Airport City ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ Airport City (Proposed) At-Grade Side
30 KIAL Terminals ಕ ಅಂ ವಿ ನಿ ಕೊನೆಯ ನಿಲ್ದಾಣ   Kempegowda International Airport Underground Island

See also

edit

References

edit
  1. ^ "Bengaluru: Namma Metro's first U-girder launched on ORR". The Times of India. 19 June 2022.
  2. ^ "BMRCL launches U Girder for the first time on ORR-Airport metro line". The Hindu. 19 June 2022.
  3. ^ "BMRCL to switch to U-girders for ORR, KIA Metro lines". The Times of India. 16 September 2019.
  4. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar".
  5. ^ "Karnataka deputy CM DK Shivakumar clarifies on upcoming new metro lines in Bengaluru. Details".
  6. ^ Bureau, The Hindu (12 February 2024). "Namma Metro link to Bengaluru airport will be completed by June 2026: Governor". The Hindu. ISSN 0971-751X. Retrieved 12 February 2024. {{cite news}}: |last= has generic name (help)
  7. ^ "DPR for Metro link to BIA in five months". Deccan Herald. 3 November 2012. Retrieved 8 October 2020.
  8. ^ "Bangalore Metro Rail yet to decide on route for Airport Line". Archived from the original on 12 August 2019.
  9. ^ "Metro line from Silk Board to KR Puram to be fast-tracked". The Times of India. 15 September 2016. Retrieved 10 September 2020.
  10. ^ "KR Puram-Silk Board Metro line gets Cabinet approval". Deccan Herald. 2 March 2017. Retrieved 10 September 2020.
  11. ^ "Bangalore High-Speed Rail Link". Railway Technology. Retrieved 10 September 2020.
  12. ^ "Cost, viability nix high-speed rail link to Bengaluru International Airport". The Times of India. 19 October 2013. Retrieved 10 September 2020.
  13. ^ "Now, suggest a Namma Metro route to the airport". Deccan Herald. 15 September 2016. Retrieved 10 September 2020.
  14. ^ "Central funding brightens prospects of metro line to Bengaluru airport". The Hindu. 14 January 2017. ISSN 0971-751X. Retrieved 10 September 2020.
  15. ^ Kidiyoor, Suchith (7 December 2016). "Bengaluru wants KIA Metro line via Nagawara". Bangalore Mirror. Retrieved 10 September 2020.
  16. ^ "Bangalore Metro Rail yet to decide on route for Airport Line – RailNews Media India Ltd". Retrieved 10 September 2020.
  17. ^ "Govt finalises KIA metro link route". Deccan Herald. 13 May 2017. Retrieved 10 September 2020.
  18. ^ "Bengaluru Metro airport line to now run through Hebbal". The New Indian Express. Retrieved 10 September 2020.
  19. ^ a b "Karnataka government clears suburban rail project, Metro to airport". The Times of India. 11 January 2019. Retrieved 10 September 2020.
  20. ^ a b "Bengaluru: Dead lines of Namma Metro". Deccan Herald. 25 January 2020. Retrieved 10 September 2020.
  21. ^ "9 Companies Bid for Namma Metro's ORR Project". Urban Railways. 16 March 2020. Retrieved 10 September 2020.
  22. ^ "Namma Metro ORR line tender receives 14 bids". The New Indian Express. Archived from the original on 4 April 2023. Retrieved 10 September 2020.
  23. ^ a b Singh, Neha (4 June 2020). "BMRCL expecting central nod on ORR Metro Corridor in Next 3 months". Metro Rail News. Retrieved 10 September 2020.
  24. ^ a b Menezes, Naveen. "Bengaluru Metro Corp to Blame for ORR, Airport Lines Delay?". The Economic Times. Retrieved 10 September 2020.
  25. ^ a b "Bengaluru Metro: Govt approves 58-km phase 2 project, to cost 14,788 crore". mint. 20 April 2021. Retrieved 21 August 2021.
  26. ^ "Soil testing marks start of work on Namma Metro ORR line". The New Indian Express. Retrieved 21 August 2021.
  27. ^ "Kempe Gowda International Airport Metro link DPR ready, but for Phase 2 or 3?". Bangalore Mirror. 5 October 2017. Retrieved 10 September 2020.
  28. ^ "Bengaluru Metro | BMRC plans two metro stations at Bengaluru Airport". Metro Rail News. 27 September 2017. Retrieved 10 September 2020.
  29. ^ "Public-Private Partnership between Bangalore Metro Rail Corporation Limited (BMRCL) and Bangalore International Airport Limited (BIAL) for Airport section of the ORR-Airport Metro: Signing of MoU". Public-Private Partnership between Bangalore Metro Rail Corporation Limited (BMRCL) and Bangalore International Airport Limited (BIAL) for Airport section of the ORR-Airport Metro: Signing of MoU. Retrieved 10 September 2020.
  30. ^ "Embassy Group signs MoU with BMRCL for Bettahalasur Metro Station". Moneycontrol. 8 September 2020. Retrieved 10 September 2020.
  31. ^ "Metro pillar crash: Sudden loss leaves Bengaluru family shattered". The Times of India. 12 January 2023.
  32. ^ "'I wish I had died too': Husband recalls Bengaluru metro accident horror". 11 January 2023.
  33. ^ "Bengaluru metro structure falls; techie, kid killed". The Times of India. 11 January 2023.
  34. ^ "What caused the under-construction metro pier in Bengaluru to fall?". 11 January 2023.
  35. ^ "Metro structure falls on family of 4, kills mother & toddler-son in Bengaluru". The Times of India. 11 January 2023.
  36. ^ "I regret not insisting on her to work from home, says mother-in-law of Bengaluru Metro pillar collapse victim". 10 January 2023.
  37. ^ "'I will pay you Rs 1 crore. Can you bring back my daughter and grandson?': Bengaluru Metro pillar collapse victim's father". 11 January 2023.
  38. ^ "Bengaluru News Highlights: Woman, her son die after under-construction metro pillar collapses in Hennur CM Bommai announces Rs 10 lakh compensation each". 9 January 2023.
  39. ^ "Metro Seeks ₹3.5k cr from ADB - The Economic Times - Bangalore, 2/26/2019". epaper.timesgroup.com. Retrieved 10 September 2020.
  40. ^ "ADB approves $500 million loan for Silk Board-airport metro". Deccan Herald. 9 December 2020. Retrieved 21 August 2021.
  41. ^ "BMRCL signs loan agreement with ADB". The Hindu. 20 August 2021. ISSN 0971-751X. Retrieved 21 August 2021.
  42. ^ Reporter, Staff (12 June 2024). "Bangalore Metro: Siemens - RVNL JV Bags Rs. 762 Crore Electrification Contract Of Blue Line - Metro Rail News". Retrieved 12 June 2024.