Review waiting, please be patient.
This may take 3 months or more, since drafts are reviewed in no specific order. There are 1,518 pending submissions waiting for review.
Where to get help
How to improve a draft
You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
Reviewer tools
|
West Bedford School is a school in Bedford, Nova Scotia.
West Bedford School | |
---|---|
Address | |
50 Broad Street , , B4B 1J6 Canada | |
Coordinates | 44°42′52″N 63°42′59″W / 44.71444°N 63.71639°W |
Information | |
School type | Elementary |
Established | September 2023 |
School district | Halifax Regional Centre for Education |
Principal | Susan Casey |
Grades | PP-6 |
Enrollment | 1 251 (2023) |
Language | English, French |
Construction of the school and the high school on the same site, were announced in 2019 to relieve overcrowding in the Bedford area.[1][2] The school opened in 2023, along with West Bedford High. As of summer 2024, the school has 1251 students enrolled.[3]
Programs
editWest Bedford School offers early french immersion for students, allowing students to enter into the program in grade primary. [4] The program goes on until students finish at the school or they opt out.
Design
editWest Bedford School and West Bedford High are both in one site. According to the designers of the school, Architecture49, the schools share central services such as electrical and mechanical systems. They also say the building has a central area, containing a cafeteria dedicated for events, libraries, art rooms, technology areas and labs.[5]
The school has a single playground and a field.
In total, the main part[a] of the site has capacity for about 2000 students.[6]
Enrollment
editThe following table shows the students enrolled at the West Bedford School, and the amount at its site, including projected values.
Year | Enrollment | |
---|---|---|
School | Site | |
2023 | 1 251 | 1 674 |
2024 | Not yet | 1 800+ |
History
editConstruction
editConstruction of West Bedford School was announced in June 2019 by the Halifax Regional Centre for Education to relieve overcrowding when land was being cleared for the building.[2] A few months later in November, the high school was announced to be built on the same site.[1]
In September 2023, construction finished, and the school opened as West Bedford School and so did West Bedford High.
Overcrowding
editIn April 2024, just a year after the schools opening, with rapid growth in Bedford, Nova Scotia leading to even more overcrowding, the HRCE announced that would be installing 2 modular extensions adding 12 classrooms in total. At the time the school had a single playground and was unable to use the field due to a lack of supervision. With that, some parents shared concerns over the lack of outdoor space, and the wellbeing of their child.[7]
CBC News predicted the site to go from 1 800 students enrolled at the time to 2 100 by September of that year, and 2 300 by 2025.[6]
See also
editExternal links
editNotes
edit- ^ The main part, as in the main building containing both schools. This does not count any extensions.
References
edit- ^ a b "Bedford getting new high school by 2023, province says". CBC News. 14 November 2019. Retrieved 10 August 2024.
- ^ a b "Crews to start clearing land for new Bedford school this summer". CBC News. 19 June 2019. Retrieved 10 August 2024.
- ^ "West Bedford School". Halifax Regional Center of Education. Retrieved 8 Aug 2024.
- ^ "Early French Immersion". Halifax Regional Center of Education. Retrieved 19 August 2024.
- ^ "West Bedford School - Architecture49". Architecture49. Retrieved 8 Aug 2024.
- ^ a b "Brand new Bedford schools 'busting at the seams'". CBC news. 18 April 2024. Retrieved 11 August 2024.
- ^ "Bursting at the seams: New school in Halifax region already facing overcrowding". Global News. 10 June 2024. Retrieved 18 August 2024.