The Dukovany Nuclear Power Station (Czech: Jaderná elektrárna Dukovany) is a nuclear power plant near Dukovany in the Czech Republic.
Dukovany Nuclear Power Station | |
---|---|
Country | Czech Republic |
Coordinates | 49°5′6″N 16°8′56″E / 49.08500°N 16.14889°E |
Status | Operational |
Construction began | 1974 |
Commission date |
|
Construction cost | Kčs 25 billion |
Operator | ČEZ Group |
Nuclear power station | |
Reactor type | VVER-440 |
Power generation | |
Units operational | 4 × 510 MW |
Nameplate capacity |
|
Capacity factor | 76.2% |
Annual net output | 12,543 GW·h |
External links | |
Website | Official website |
Commons | Related media on Commons |
It was the second nuclear power plant in Czechoslovakia (the Bohunice Nuclear Power Plant in what is now Slovakia was constructed in 1958), and the first one in what is now the Czech Republic. It is situated 30 kilometres (19 mi) from the town of Třebíč, near the Dalešice Reservoir, where the plant sources its water supply. In 1970 Czechoslovakia and the Soviet Union ratified a contract for construction of two nuclear power plants. Actual construction work began four years later. From 1985 to 1987, four power units with pressurized water reactors were commissioned. All four are still in operation.
Dukovany nuclear power plant supplies approximately 14 TWh of electric energy annually to the national power network.[1] The plant is owned and operated by ČEZ Group. The power plant modernisation will successively be carried out to the end of its planned service life.[1]
Plant characteristics
editThe plant has four reactors. As of 31 December 2011 ČEZ reported turbine generator output (gross capacity) as listed below.[2] Net capacity is a baseline estimate only.
Unit | Type | Net capacity | Gross capacity | Initial criticality | Grid date |
---|---|---|---|---|---|
1 | VVER-440/213 | 475 MWe | 510 MWe | Feb 1985 | Aug 1985 |
2 | VVER-440/213 | 475 MWe | 510 MWe | Jan 1986 | Sep 1986 |
3 | VVER-440/213 | 475 MWe | 510 MWe | Oct 1986 | May 1987 |
4 | VVER-440/213 | 475 MWe | 510 MWe | Jun 1987 | Dec 1987 |
In 2005, Unit 3 was upgraded to 456 MWe gross capacity, and the same upgrade was made to Unit 1 and Unit 4 in 2007. Unit 3 was further upgraded in 2009 to 500MWe. In total an extra 240 MWe of capacity has been or will be added before 2013 in a comprehensive program of improvements including steam plant replacement, addition of instrumentation and fuel changes.
The reactors are fuelled by uranium dioxide UO2. Fuel is placed in the reactor in 312 fuel assemblies. Each assembly consists of 126 fuel rods with a hermetically sealed fuel.
Dukovany Nuclear Power Station has 8 cooling towers, each 125 metres tall. In 1994, a visitor information centre was opened at the site.
West of the facility there is a 136 metre tall guyed tower for monitoring air radioactivity.
In 2023, ČEZ planned to invest more than CZK2.3 billion ($105 million) mainly to ensure "safe and reliable operation until at least 2047" with a lifetime of at least 60 years. The units are also switching to a 16-month fuel replacement cycle from the current 12-month cycle.[3]
Power distribution
editThe power lines leaving Dukovany Nuclear Power Station are mainly installed on delta type pylons. They run to Slavetice substation situated at 49°6'15" N and 16°7'10" E. At this substation the powerline to Dürnrohr in Austria starts.
Plant owner ČEZ plans to install a district heating circuit to supply heat to homes and businesses in Brno. A pipeline over 40 kilometres in length could be installed after regional officials have considered ČEZ's environmental impact statement for the project, submitted in July 2010.
Replacement
editIn 2019 the Czech government gave preliminary approval for at least one new nuclear power unit for about 2035 to replace the four units expected to shut down between 2035 and 2037. The financial model proposed is a state guarantee so finance can be obtained at government interest rates, but no subsidy on operating costs or above market-price electricity rates.[4] In January 2021 Chinese companies were excluded from bidding for political and security reasons, following advice from the security services of EU and NATO member states.[5] In April 2021, it was announced that Russia's Rosatom would be excluded as well,[6] after it has been alleged that two Russian agents were perpetrators of the 2014 Vrbětice ammunition warehouses explosions.[7]
In June 2021, the Czech Ministry of Industry and Trade invited EDF, along with Westinghouse and Korea Hydro & Nuclear Power (KHNP) to participate in a pre-qualification round for a new unit at the Dukovany Nuclear Power Station.[8] EDF is proposing a 1200 MWe version of the EPR for the project, named the EPR-1200.[9] On 31 October 2023, the three companies delivered bids for AP1000, APR1000 and EPR-1200 reactors respectively. The bids will be evaluated with the aim of construction starting in 2029 with first trial operation in 2036.[10] In July 2024 it was announced that KHNP had been selected to construct two APR1000 reactors rated at 1,055 MWe for a cost of US$8.6bn each.[11]
Popular culture
editThe Dukovany reactor complex appears in the video game Tom Clancy's EndWar as a potential battlefield.[12]
See also
edit- Nuclear power in the Czech Republic
- Energy in the Czech Republic
- Temelín Nuclear Power Station - another nuclear power plant in the Czech Republic
- Dalešice Reservoir - nearby reservoir that supplies cooling water and the Dalešice Hydro Power Plant
References
edit- ^ a b "The Dukovany Nuclear Power Station". cez.cz. Retrieved 2017-02-11.
- ^ www.fg.cz, 2023, FG Forrest, a s. "Jaderná elektrárna Dukovany". Skupina ČEZ - O Společnosti (in Czech). Retrieved 2023-05-14.
{{cite web}}
: CS1 maint: multiple names: authors list (link) CS1 maint: numeric names: authors list (link) - ^ "ČEZ increases investment in Dukovany, 16-month fuel cycles". World Nuclear News. 2 February 2023. Retrieved 3 February 2023.
- ^ "Czech state to back new nuclear units". World Nuclear News. 9 July 2019. Retrieved 10 July 2019.
- ^ "Czech Republic excludes China from Dukovany tender". Nuclear Engineering International. 1 February 2021. Retrieved 1 February 2021.
- ^ "Rusko je u Dukovan ze hry, rozhodla vláda - Novinky.cz". www.novinky.cz. Retrieved 2021-05-03.
- ^ Muller, Robert; Hovet, Jason (19 April 2021). "Czechs exclude Rosatom from nuclear tender after dispute with Russia". Reuters. Retrieved 1 November 2023.
- ^ "ČEZ begins 'security assessment' of Dukovany bidders". World Nuclear News. 22 June 2021. Retrieved 23 July 2021.
- ^ "CEZ applies for a zoning decision for a new Dukovany unit". Nuclear Engineering International. 3 June 2021. Retrieved 23 July 2021.
- ^ "Westinghouse, EDF and KHNP submit final Czech bids". World Nuclear News. 31 October 2023. Retrieved 1 November 2023.
- ^ "Czechia selects KHNP to build two units at Dukovany nuclear plant (2.1 GW)". EnerData. 19 July 2024. Retrieved 4 October 2024.
- ^ Ubisoft (2008). "Locations". Ubisoft. Retrieved 1 April 2011.