Dunhou station (Chinese: 敦厚站; pinyin: Dūnhòu Zhàn; Jyutping: Deon1hau5 Zaam6) is a future station on Line 3 of Foshan Metro, located in Foshan's Chancheng District.[1]
Chinese name | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese | 敦厚站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Intersection of Zhanqian Road (站前路) and Wenchang Road (文昌路) Chancheng District, Foshan, Guangdong China | ||||||||||
Coordinates | 23°03′05″N 113°05′54″E / 23.051319°N 113.098219°E | ||||||||||
Operated by | Foshan Metro Operation Co., Ltd. | ||||||||||
Line(s) | Line 3 South section | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | F328 | ||||||||||
History | |||||||||||
Opening | To be determined |
History
editThis station was originally used as a supporting station of Foshan railway station, and was called Foshan Railway Station in the planning and construction stage. In 2022, the Guangzhou–Zhanjiang high-speed railway will not use the existing Foshan station, and instead will build a new station building west of the original Foshan station, and the original Foshan station will be discontinued, so Line 3 will determine to add a station at the new high-speed rail station at the same time, and the station will also be renamed Dunhou. On September 8, 2017, the station area began to be fenced.[2] On January 22, 2021, the main structure of the site was capped.[3] On March 11, 2022, the left line between this station and Zhongshan Park Station was completed.[4] On July 15, 2022, the right line between this station and Guidan Road station (now Lianhe) was completed.[5]
Since the Foshan high-speed railway station was only added after the construction of Line 3 started for a period of time, the tunnel segments that have been built between Line 3 and this station will be removed during the construction of the station.[6] However, there are no train turnback conditions at this station, so it will not be able to provide services at the beginning of the opening of the rear section of Line 3.[7][8]
Station layout
editThe station has an island platform under Zhanqian Road.[1] It also has reservations for a future interchange with Line 5.
G | - | Exits A-C |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
L2 Platforms |
Platform 1 | 3 towards Foshan University (Foshan Railway Station) |
Island platform, doors will open on the left | ||
Platform 2 | 3 towards Shunde College Railway Station (Zhongshan Park) | |
L3 Reserved Platforms |
5 Reserved track area | |
Reserved Island platform | ||
5 Reserved track area |
Exits
editIn its initial opening, the station will have Exits A, B and C, which are located on the north and south sides of Zhanqian Road.[1]
References
edit- ^ a b c 梁焯贤 (2019-12-28). "佛山地铁3号线、2号线一期站点详细位置公布!最新进展" [The detailed locations of Foshan Metro Line 3 and Line 2 Phase 1 stations have been announced! Latest progress]. Foshan News Network (in Simplified Chinese). Archived from the original on 2022-06-26. Retrieved 2024-08-21 – via Foshan Municipal People's Government.
- ^ 周文琪 (2017-09-02). "3号线火车站站8日起围蔽施工" [Line 3 Railway Station will be fenced off for construction starting on the 8th]. Foshan Daily (in Simplified Chinese). Archived from the original on 2022-07-29. Retrieved 2024-08-21.
- ^ "三号线|禅城段五座地下车站主体结构全部封顶" [Line 3 - The main structures of the five underground stations in Chancheng section have all been capped]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 2021-01-27. Archived from the original on 2022-07-29 – via Foshan Metro's Official WeChat Account.
- ^ "3号线|中山公园站~火车站站区间左线贯通" [Line 3 - The left line between Zhongshan Park Station and Railway Station is connected]. Foshan Metro (in Simplified Chinese). 2022-03-11. Archived from the original on 2022-07-29. Retrieved 2024-08-21 – via Official WeChat Account.
- ^ 荣延昌 (2022-07-16). "佛山地铁3号线 火桂区间右线盾构隧道贯通" [Foshan Metro Line 3 Huogui Section Right Line Shield Tunnel Completed]. Foshan Daily (in Simplified Chinese). Archived from the original on 2022-07-27. Retrieved 2024-08-21.
- ^ "新建广州至湛江高速铁路佛山站站房及相关工程监理招标公告" [Announcement of bidding for the construction of the new Guangzhou-Zhanjiang high-speed railway Foshan station building and related engineering supervision] (PDF). Guangzhou Public Resources Trading Center (in Simplified Chinese). 2024-06-12. Archived from the original on 2024-06-13. Retrieved 2024-08-21.
- ^ 李传智 (2024-08-20). "官宣!佛山地铁3号线在建段将于本周五开通" [Official announcement! The under-construction section of Foshan Metro Line 3 will open this Friday]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-08-20. Retrieved 2024-08-21.
- ^ 唐宇松 (2024-07-21). "实探佛山地铁3号线后通段:一站点无踪影 短期全线开通无望" [A real look at the later section of Foshan Metro Line 3: one station is missing and there is no hope for the full line to be opened in the short term]. Southern Metropolis Daily (in Simplified Chinese). Archived from the original on 2024-07-21. Retrieved 2024-08-24.