Embankment Exchange is a residential development under construction in the Greengate area of Salford, Greater Manchester, England. It will comprise 300 apartments across two buildings connected by a central podium: the 107 m (349 ft) tall North Tower and 50 m (163 ft) tall South Tower.[2] The buildings were designed by Jeffrey Bell Architects.[3]
Embankment Exchange | |
---|---|
Former names | The Residence Irwell Tower The Residence Greengate Tower |
General information | |
Status | Under construction |
Type | Residential skyscraper |
Location | Greengate, Salford, Greater Manchester, England, United Kingdom |
Coordinates | 53°29′14″N 2°14′49″W / 53.48710°N 2.24700°W |
Construction started | 2017 |
Completed | 2024 |
Cost | £85 million[1] |
Owner | Legacie Developments |
Height | North Tower: 107 m (349 ft) South Tower: 50 m (163 ft) |
Technical details | |
Floor count | North Tower: 35 South Tower: 16 |
Design and construction | |
Architect(s) | Jeffrey Bell Architects / Falconer Chester Hall[2] |
Website | |
www |
Once completed, the North Tower will become the fifth-tallest building in Salford and the joint 21st-tallest building in Greater Manchester with City Tower.
History
editPlanning
editThe planning application was submitted to Salford City Council in August 2015,[4] with planning approval obtained in March 2016.[5]
Construction
editIn 2017, Elliot Group commenced construction of the complex, then called 'The Residence',[2] but progress was delayed the following year when main contractor Forrest went into administration.[6] Work stalled again in 2020 pending the results of a wider fraud investigation,[6] before restarting in February 2022 following the acquisition of the site by Legacie Developments who renamed the development 'Embankment Exchange'.[7] Construction was expected to complete in 2023,[2] but is ongoing as of May 2024.
Facilities
editThe development will include a spa, gym, residents lounge and bar, work-from-home booths and a 24-hour concierge.[8]
Gallery
edit-
'The Residence', under construction in October 2019
See also
editReferences
edit- ^ Jackson, Nick (27 October 2022). "Flagship £40m, 300-home tower block boasting spa and gym to soon dominate Salford's skyline". Manchester Evening News. Retrieved 31 July 2023.
- ^ a b c d "The Residence". Skyscraper Center. Retrieved 31 July 2023.
- ^ Whelan, Dan (27 October 2022). "Legacie secures £40m for long-stalled Salford project". placenorthwest.co.uk. Place North West. Retrieved 31 July 2023.
- ^ "Planning – Application Summary". salford.gov.uk. Salford City Council. Retrieved 31 July 2023.
- ^ "Application No: 17/69573/FUL" (PDF). salford.gov.uk. Salford City Council. Retrieved 31 July 2023.
- ^ a b Middleton-Pugh, Jessica (20 February 2020). "Work stops on Elliot's £70m Salford tower". placenorthwest.co.uk. Place North West. Retrieved 31 July 2023.
- ^ Whelan, Dan (4 February 2022). "Funding deal paves the way for Legacie to restart Salford tower". placenorthwest.co.uk. Place North West. Retrieved 31 July 2023.
- ^ Butler, Ben (28 October 2022). "Developer Strikes Funding Deal for Apartments Tower". insidermedia.com. Insider Media. Retrieved 31 July 2023.