Everglades Agricultural Area

The Everglades Agricultural Area Environmental Protection District (EAA EPD), better known as simply the Everglades Agricultural Area (EAA), is an area extending south from Lake Okeechobee to the northern levee of Water Conservation Area 3A, from its eastern boundary at the L-8 canal to the western boundary along the L-1, L-2, and L-3 levees. The EAA incorporates almost 3,000 square kilometers (1,158 square miles) of highly productive agricultural land.[1] The EAA was established by the State Legislature as a special district representing landowners within the EAA Basin for the purposes of ensuring environmental protection. Means include conducting scientific research on environmental matters related to air and water and land management practices and implementing the financing, construction, and operation of works and facilities designed to prevent, control, abate or correct environmental problems and improve the environmental quality of air and water resources.[2]

This map shows the Everglades Agricultural Area, as designated by the Central and Southern Florida Project

History

edit

The Everglades Agricultural Area was designated by the Central and Southern Florida Project (C&SF Project) in 1948.[3] The C&SF established 470,000 acres (1,900 km2) for the Everglades Agricultural Area—27 percent of the Everglades prior to development.[4]

Sugar farming

edit

Approximately 500,000 acres of the 700,000 acres of the EAA is controlled by sugar companies, namely U.S. Sugar and Florida Crystals.[5] In late 2008, a land deal was in the works as U.S. Sugar offered to sell the US government just under 180,000 acres of land at $1.75 billion.[6] The deal was repeatedly downsized until the South Florida Water Management District eventually rejected the deal in 2010.[7]

Reservoir project

edit

Three above ground reservoirs are being built by the South Florida Water Management District as part of the Comprehensive Everglades Restoration Plan, including the A-1 parcel of the Everglades Agricultural Area.[8] Construction of the reservoir was halted in 2009 during the negotiation of the failed U.S. Sugar land acquisition deal, after US taxpayers had already invested almost $250 million.[6][9] In the summer of 2016, much of South Florida's waterways experienced massive toxic algae blooms caused by the discharge of billions of gallons of freshwater from Lake Okeechobee.[10] Following the crisis, much public support was aroused pressuring the construction of the EAA to be moved ahead.

See also

edit

References

edit
  1. ^ "Glossary of Terms". Everglades Forever. Florida Department of Environmental Protection.
  2. ^ "Home". eaaepd.org. Retrieved 2017-06-28.   This article incorporates text from this source, which is in the public domain.
  3. ^ "THE C&SF Project". Duke University. Duke University Wetland Center.
  4. ^ Lodge, Thomas E. (2005). The Everglades Handbook. Understanding the Ecosystem. CRC Press. ISBN 1-884015-06-9
  5. ^ Mitchell, Kimberly. "Everglades protection must prevail against sugar industry". NaplesNews.com. Naples News.
  6. ^ a b Natta, Don Van Jr.; Cave, Damien (2010-03-07). "A Deal to Save the Everglades Could Rescue U.S. Sugar Instead". The New York Times. ISSN 0362-4331. Retrieved 2017-07-07.
  7. ^ Reid, Andy. "Water district rejects buying sugar land for Everglades restoration". Sun-Sentinel.com. Retrieved 2017-07-07.
  8. ^ Williams, John W. (January 31, 2008). "Audit of the Everglades Agricultural Area A-1 Reservoir Construction Management at Risk Contract" (PDF). South Florida Water Management District.
  9. ^ Reid, Andy. "Costs grow for Everglades reservoir left unfinished by sugar deal". Sun-Sentinel.com. Retrieved 2017-07-07.
  10. ^ Barry H. Rosen, Timothy W. Davis, Christopher J. Gobler, Benjamin J. Kramer, and Keith A. Loftin (May 31, 2017). "Cyanobacteria of the 2016 Lake Okeechobee and Okeechobee Waterway harmful algal bloom". USGS.org.{{cite journal}}: CS1 maint: multiple names: authors list (link)