File:GENERAL VIEW OF HEADWORKS AND TRANSFORMER HOUSE; THE STRUCTURE IN THE FOREGROUND IS THE HEADWORKS FOR THE SNOQUALMIE POWERHOUSE NO. 2 - Snoqualmie Falls Hydroelectric Project, HAER WASH,17-SNOQ.V,1-5.tif

Original file (5,000 × 3,610 pixels, file size: 17.22 MB, MIME type: image/tiff)

Summary

GENERAL VIEW OF HEADWORKS AND TRANSFORMER HOUSE; THE STRUCTURE IN THE FOREGROUND IS THE HEADWORKS FOR THE SNOQUALMIE POWERHOUSE NO. 2 - Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA
Title
GENERAL VIEW OF HEADWORKS AND TRANSFORMER HOUSE; THE STRUCTURE IN THE FOREGROUND IS THE HEADWORKS FOR THE SNOQUALMIE POWERHOUSE NO. 2 - Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA
Description
Baker, Charles H., Engineer; Stone and Webster Engineering Corporation, Engineer; Snoqualmie Power Company, Builder
Depicted place Washington; King County; Snoqualmie
Date Documentation compiled after 1968
Dimensions 5 x 7 in.
Current location
Library of Congress Prints and Photographs Division Washington, D.C. 20540 USA http://hdl.loc.gov/loc.pnp/pp.print
Accession number
HAER WASH,17-SNOQ.V,1-5
Credit line
This file comes from the Historic American Buildings Survey (HABS), Historic American Engineering Record (HAER) or Historic American Landscapes Survey (HALS). These are programs of the National Park Service established for the purpose of documenting historic places. Records consist of measured drawings, archival photographs, and written reports.

This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.

Notes
  • Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge of the falls. It is one of the few cavity plants in the United States and one of possibly two in the nation that contains its turbines, generators, and operators controls all within the cavity. Thomas T. Johnston, a consulting engineer from Chicago, executed the design and Charles Baker, president and chief engineer of the Snoqualmie Falls Power Company, oversaw the design and construction of the project. The Snoqualmie Falls cavity plant is a national civil engineering landmark.
  • Survey number: HAER WA-21
  • Building/structure dates: after. 1897- before. 1958 Initial Construction
References

This is an image of a place or building that is listed on the National Register of Historic Places in the United States of America. Its reference number is 92001324.

Source https://www.loc.gov/pictures/item/wa0265.photos.369770p
Permission
(Reusing this file)
Public domain This image or media file contains material based on a work of a National Park Service employee, created as part of that person's official duties. As a work of the U.S. federal government, such work is in the public domain in the United States. See the NPS website and NPS copyright policy for more information.

Captions

Add a one-line explanation of what this file represents

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current19:27, 4 August 2014Thumbnail for version as of 19:27, 4 August 20145,000 × 3,610 (17.22 MB)GWToolset: Creating mediafile for Fæ. HABS 2014-08-04 (3601:3800) Penultimate Tranche!

Metadata