Franklin Avenue Shuttle

The Franklin Avenue Shuttle[3] is a New York City Subway shuttle service operating in Brooklyn. The shuttle service uses the BMT Franklin Avenue Line exclusively. The north terminus is Franklin Avenue, with a transfer available to the IND Fulton Street Line. The south terminus is Prospect Park, with a transfer available to the BMT Brighton Line. NYCT Rapid Transit Operations staff refer to it internally as the S or FS.[4] Like the other two shuttles, the 42nd Street Shuttle in Manhattan and the Rockaway Park Shuttle in Queens, its route bullet is colored dark gray on route signs, station signs, rolling stock, and the official subway map.

"S" train symbol
Franklin Avenue Shuttle
A Franklin Avenue Shuttle train of R68s at Franklin Avenue station
Map of the "S" train
Northern endFranklin Avenue
Southern endProspect Park
Stations4
Rolling stockR68[1][2]
(Rolling stock assignments subject to change)
DepotConey Island Yard
Started service1878; 146 years ago (1878) (predecessor, along with current Q route)
1963; 61 years ago (1963) (current shuttle)
Route map

Franklin Avenue
Park Place
Botanic Garden
Prospect Park

The S started running along its current route in 1963, and it has had four stations since 1995.[5] Consumers Park was closed in 1928 and replaced by the current Botanic Garden station five blocks to the north. There is a visible clearing at the former station location. Dean Street was closed in 1995 due to low paid fare entrance and fare beating.

The shuttle runs two 2-car train sets of R68 cars under One Person Train Operation with the motorman also being the conductor. The motorman will go to the opposite end to make another run at each terminal. The northbound and southbound trains usually pass each other at Botanic Garden, the only station on the line to use both tracks. This effectively leaves a passing loop for the northbound train to leave Botanic Garden when the southbound train arrives.

History

edit

Early history

edit

The current service is co-extensive with the BMT Franklin Avenue Line. It parallels Franklin Avenue, hence the shuttle's name (and the name of the line). It was originally a part of the mainline of what is now the BMT Brighton Line and opened as part of that steam railroad line in 1878.[6][7][8]

The Franklin Avenue Line was established as a discrete route on August 1, 1920, when the Brighton Beach mainline was shifted to the new tunnel connecting Prospect Park station with the Fourth Avenue Subway at DeKalb Avenue station. Subway trains from the BRT Broadway Line in Manhattan and elevated trains from Franklin Avenue began sharing operations to Coney Island.[9][10] The subway operations became the full-time service, and the Franklin Avenue trains provided a variety of scheduled services, based on day of the week, time of day, and even seasonal variations, reverting to shuttle service at other times.[10]

After the city gained ownership of the line in 1940, Brighton–Franklin (labelled 7 by the BMT) services gradually declined. A major blow to through service viability occurred in 1954 when the D train of the IND Division was extended to Coney Island via the Culver Line, depriving the Franklin of a major source of transfer traffic, consisting of passengers from Harlem and the Bronx, who now had a more direct route to Coney Island.[10][11]

Truncation

edit

Brighton–Franklin Sunday express service ended after the 1956 summer season, though it continued for several years as a summer-only local. The last through service, on Saturdays, ran on February 16, 1963 in advance of new BMT schedules in effect the next day,[12] resulting in the 7 Franklin Avenue Line becoming a full-time shuttle. On November 1, 1965, when R27s started going into service, this service was named SS, and in 1985, when the practice of using double letters was eliminated, this service became the S.[10][11] However, some trains from the 1960s to 1980s continued to use the BMT 7 signage.[13][14][15]

On December 1, 1974, a southbound shuttle train of R32s was approaching the tunnel portal en route from Franklin Avenue when it derailed on the crossover at Empire Boulevard and smashed into the same place where BRT car 100 had hit in the Malbone Street Wreck. This derailment resulted in some injuries, with R32 car 3668 damaged beyond repair, but there were no fatalities, because time signals limit the speed of trains coming down the hill from Crown Heights.[10]

Deterioration and renovation

edit
 
Alternate SF bullet, displayed on the MTA website and in station advertisement displays

In 1981, the MTA proposed abandoning the service under the failed Program for Action. At the time, only 10,000 passengers used the shuttle per day, and in addition, the Franklin Avenue Line was severely deteriorated. It was proposed that additional B48 bus service along nearby Franklin Avenue could substitute for the line.[10] During the winter, the line would often be closed because there was fear that trains would derail. Stations were in horrible condition; portions of the wooden platforms were sealed off because they had burned or collapsed.[16][17] In January 1982, the line needed to close for emergency repair work because a retaining wall along the line was in danger of collapse.[18]

In the 1990s, the term "Ghost Train" was coined for the shuttle due to its increasing deterioration. It was shrunk in size to only two cars, and the Dean Street station, which only had 50 paying riders per day, was closed in 1995 due to extensive fare evasion.[10][19] The entire line was under consideration for abandonment, but community leaders were opposed to the move. They showed up to town hall meetings, news conferences and they sat down with transit officials. They also formed the Committee to Save the Franklin Avenue Shuttle. The coalition included the Straphangers Campaign, a local church, local community boards and the New York City Environmental Justice Alliance. They argued that subway station repair work occurred elsewhere, while no attention was paid to the Franklin Avenue Shuttle.[20]

In the end they convinced the New York State Assembly to force the MTA to rebuild rather than abandon the line, and as a result most of the supporting infrastructure and stations were completely rehabilitated for 18 months, between July 1998 and October 1999 at a cost of $74 million.[5][9][21] While the closure of the line started in July 1998, work began in September 1997.[22] During the renovation, a temporary shuttle bus and the B48 bus replaced train service. The line reopened on October 18, 1999, three months ahead of schedule.[9][21][23]

As of 2008, the Franklin Avenue Shuttle is the most punctual train in the New York City Subway system with a 99.7 percent on-time average. The shuttle averages 20,000 riders per day.[24]

On June 7, 2024, the MTA announced that the St Marks Avenue bridge will be replaced during summer 2024, with no shuttle service on weekends between June 14 and July 8 and between August 9 to September 3. Between July 8 and August 9, northbound trains ended at Park Place, and free shuttle buses replaced service between Park Place and Franklin Avenue-Fulton Street.[25] Full service resumed on August 10, 2024.[26]

Stations

edit

For a more detailed station listing, see BMT Franklin Avenue Line.[3][27]

Station service legend
  Stops all times
  Stops all times except late nights
  Stops late nights only
  Stops weekdays during the day
  Station closed
Time period details
  Station is compliant with the Americans with Disabilities Act
  ↑ Station is compliant with the Americans with Disabilities Act
in the indicated direction only
  ↓
  Elevator access to mezzanine only
  Stations   Subway transfers Connections
Brooklyn
Franklin Avenue Line
  Franklin Avenue   A  C   (IND Fulton Street Line)
  Park Place  
  Botanic Garden 2  3  4  5   (IRT Eastern Parkway Line at Franklin Avenue–Medgar Evers College)
  Prospect Park   B  Q   (BMT Brighton Line)

Footnotes

edit
  1. ^ 'Subdivision 'B' Car Assignment Effective December 19, 2021'. New York City Transit, Operations Planning. December 17, 2021.
  2. ^ "Subdivision 'B' Car Assignments: Cars Required November 1, 2021" (PDF). The Bulletin. 64 (12). Electric Railroaders' Association: 3. December 2021. Retrieved December 3, 2021.
  3. ^ a b "S Subway Timetable, Franklin Av Shuttle, Effective November 8, 2020". Metropolitan Transportation Authority. Retrieved June 28, 2024.
  4. ^ "General Distribution – Sub-Division B – Train Operator/Conductor – Road & Non-Road Work Programs" (PDF). New York City Transit Authority. July 29, 2016. Archived (PDF) from the original on October 10, 2016. Retrieved August 19, 2016.
  5. ^ a b Wilson, Michael (July 24, 2008), "In Brooklyn, It's the Little Train That Can", The New York Times, ISSN 0362-4331, archived from the original on April 16, 2016, retrieved July 27, 2008
  6. ^ "The Lore of the Franklin Avenue Shuttle – Forgotten New York". forgotten-ny.com. October 4, 1998. Archived from the original on November 11, 2020. Retrieved June 21, 2016.
  7. ^ "Joint LIRR / BRT Elevated/Rapid Transit Service". www.lirrhistory.com. Archived from the original on March 3, 2016. Retrieved June 21, 2016.
  8. ^ "Brighton Beach Line Part 2". www.arrts-arrchives.com. Archived from the original on June 8, 2016. Retrieved June 21, 2016.
  9. ^ a b c "The Third Rail – The New Franklin Shuttle – Preface". www.thethirdrail.net. Archived from the original on March 14, 2016. Retrieved June 21, 2016.
  10. ^ a b c d e f g Cudahy (1999).
  11. ^ a b "NYCT Line by Line History". www.erictb.info. Archived from the original on March 4, 2016. Retrieved June 21, 2016.
  12. ^ "New BMT Schedules". NY Division, ERA Bulletin. VI (6): 6. April 1963.
  13. ^ "Showing Image 6528". www.nycsubway.org. Archived from the original on October 9, 2020. Retrieved October 4, 2020.
  14. ^ "Showing Image 66759". www.nycsubway.org. Archived from the original on January 22, 2022. Retrieved October 4, 2020.
  15. ^ "Showing Image 66483". www.nycsubway.org. Archived from the original on October 8, 2020. Retrieved October 4, 2020.
  16. ^ "The Fight to Save the Franklin Avenue Shuttle". www.straphangers.org. Archived from the original on December 15, 2016. Retrieved June 21, 2016.
  17. ^ Finder, Alan (March 16, 1992). "Transit Authority Switches Tracks". The New York Times. ISSN 0362-4331. Archived from the original on August 12, 2016. Retrieved June 21, 2016.
  18. ^ Goldman, Ari L. (January 22, 1982). "Franklin Avenue Subway Shuttle In Brooklyn Is Closed For Repairs". The New York Times. ISSN 0362-4331. Archived from the original on August 21, 2016. Retrieved August 5, 2016.
  19. ^ "Abandoned Stations : Elevated Stations". www.columbia.edu. Archived from the original on July 2, 2016. Retrieved June 21, 2016.
  20. ^ "MTR 10, Franklin Ave Shuttle Site of Leafletting Action". www.tstc.org. Tri-State Transportation Campaign. November 9, 1994. Archived from the original on May 6, 1999. Retrieved June 21, 2016.
  21. ^ a b Faison, Seth (June 20, 1993). "Hope for Overhaul Dims on a Crumbling Subway Line". The New York Times. Archived from the original on August 12, 2016. Retrieved August 5, 2016.
  22. ^ "New Franklin Avenue Shuttle Makes Early Debut". www.mta.info. Metropolitan Transportation Authority. October 18, 1999. Archived from the original on July 29, 2016. Retrieved June 21, 2016.
  23. ^ "About NYC Transit – History". mta.info. Metropolitan Transportation Authority. October 19, 2002. Archived from the original on October 19, 2002. Retrieved September 18, 2016.
  24. ^ Wilson, Michael (July 24, 2008), "In Brooklyn, It's the Little Train That Can", The New York Times, ISSN 0362-4331, archived from the original on April 16, 2016, retrieved July 27, 2008
  25. ^ "Summer 2024 Franklin Av Shuttle Service Changes". MTA. June 7, 2024. Retrieved June 9, 2024.
  26. ^ Simko-Bednarski, Evan (August 11, 2024). "Franklin Ave. Shuttle returns to full service after St. Marks Ave. bridge replacement". New York Daily News. Retrieved August 11, 2024.
  27. ^ "Subway Service Guide" (PDF). Metropolitan Transportation Authority. September 2019. Retrieved September 22, 2019.

References

edit
edit

Official websites:

Fan sites: