The Grand Rapids Medical Corridor North Pedestrian Tunnel is a tunnel in Grand Rapids, Michigan connecting the Lemmen-Holton Cancer Pavilion with Butterworth Hospital and Helen DeVos Children's Hospital.
Overview | |
---|---|
Location | Grand Rapids, Michigan |
Coordinates | 42°58′13.8″N 85°39′55.4″W / 42.970500°N 85.665389°W |
Status | open |
Start | Butterworth Hospital |
End | Lemmen-Holton Cancer Pavilion |
Operation | |
Work begun | 15 December 2005 |
Constructed | excavated through grouted glacial till, shotcrete lined |
Opened | 26 May 2006 |
Owner | Corewell Health |
Character | pedestrian tunnel |
Technical | |
Length | 130 feet (40 meters) |
Tunnel clearance | 20 feet |
Grade | level |
Construction
editThe tunnel passes under Michigan Street, a busy thoroughfare in the Grand Rapids Medical Mile. Construction was accomplished using the New Austrian tunneling method without disrupting the traffic moving on the street above.[1] The tunnel was mined[2] through glacial till, which was grouted with sodium silicate to stabilize it prior to digging the tunnel.[3] The tunnel is lined with 15 inches (380 mm) of shotcrete.
In 2007, it received the ABC/WMC Construction Award from the Associated Builders and Contractors–Western Michigan Chapter.
References
edit- ^ Almeraris, Gary; Mariucci, Bill, eds. (2009) [2007]. "NATM Through Clean Sands- The Michigan Street Experience". Rapid Excavation and Tunneling Conference: Proceedings 2007. SME. pp. 988–997. ISBN 978-0-87335-304-5.
- ^ "Grand Rapids Medical Corridor North Pedestrian Tunnel". Gall Zeidler Consultants. Archived from the original on 6 March 2012. Retrieved 4 July 2010.
- ^ Nicholson Construction (2010). "Michigan Street Tunnel". Retrieved 4 July 2010.