The Greene County Nuclear Power Plant was proposed in 1974 by the Power Authority of the State of New York. A single 1,212 MWe Babcock & Wilcox pressurized water reactor was to be built approximately 5 miles south of Catskill, New York on the western shore of the Hudson River,42°09′00″N 73°54′41″W / 42.15000°N 73.91139°W / 42.15000; -73.91139[1] but the plant proposal was canceled in 1979, largely due to concerns over social and economic disruptions to the local communities.[2] [3]

See also

edit

References

edit
  1. ^ Fred A Heddleson (June 1976). Design Data and Safety Features of Commercial Nuclear Power Plants (PDF) (Report). National Safety Information Center. p. 163. ORNL/NSIC-96. Retrieved December 18, 2014 – via Oak Ridge National Laboratory.
  2. ^ Nuclear Power Generation and Fuel Cycle Report 1997 Archived 2009-10-09 at the Wayback Machine p. 63.
  3. ^ Peelle, E. 1980. Socioeconomic impact assessment and nuclear power plant licensing, Greene County, New York. Oak Ridge National Lab., TN (USA)