Haikou Nandu River Water Diversion Project (Chinese: 海口南渡江引水工程) is a project to divert water from the Nandu River to parts of Haikou Prefecture, in particular, an agricultural area west of Haikou City where lychee are grown.[1][2][3][4][5][6][7]
Tunnel construction
editThe project is ongoing in 2017 and includes a pumping station on the east bank of the Nandu River just south of the Longtang Dam. Tunnels are being bored from the west side of the Nandu westward to the areas where the water is needed. This involves underground blasting and the creation of numerous pits along the route for equipment access.
References
edit- ^ "海口市南渡江引水工程正式开工-中国水网".
- ^ L_104238. "海口市南渡江引水工程开工 总投资36.2亿元--人民网海南视窗--人民网".
{{cite web}}
: CS1 maint: numeric names: authors list (link) - ^ yfs001. "海口市南渡江引水工程立项_滚动读报_光明网".
{{cite web}}
: CS1 maint: numeric names: authors list (link) - ^ http://www.haikou.gov.cn/xxgk/szfbjxxgk/cztz/zfcg/cggg/201510/t20151009_891539.html [dead link ]
- ^ "海口南渡江引水工程立项 解决西部羊山地区用水". Archived from the original on 2017-01-06. Retrieved 2017-01-06.
- ^ 宁波. "海口市南渡江引水工程开工 缓解海口工农业缺水 - 国内新闻 - 中国日报网".
- ^ "南渡江引水工程 - 海南省水务厅门户网站".
External links
edit- Media related to Haikou Nandu River Water Diversion Project at Wikimedia Commons