Highways in the Czech Republic

Highways in the Czech Republic are managed by the state-owned Directorate of Highways and Motorways of the Czech Republic – ŘSD ČR. The ŘSD currently (January 2025) manages and maintains 1,501 km of motorways (dálnice) and the national speed limit is 130 km/h with an expectation that limit will be increased for some sections to 150 km/h (93 mph).[1] The length of the motorway network is planned to be expanded to 2,000 km by 2030.[2]

Road sign indicating the start of motorway regulations, dálnice
Motorway number road sign in the Czech Republic

Road categories

edit

The road hierarchy originates from the Czechoslovak 1961 road act, although there were changes since the dissolution of Czechoslovakia.

There are 2 main categories of state-owned roads in Czech Republic: motorways (dálnice) and highways (silnice).

Motorways (Dálnice)

edit
 
Motorway sign, dálnice

This is the highest category of roads in the Czech Republic, forming the trunk of the road network. Their start and end are marked by white-on-green directional motorway signs and the informational signs on them and leading to them are green. They are designated by a number prefixed by the letter D and their road numbers are displayed on red rectangular shields. They are maintained by the state and the use of most of their sections is paid via electronic vignettes or toll, though bypasses of large towns and other sections that are used for local traffic tend to be exempt. An electronic vignette is compulsory unless stated otherwise. The speed limit on motorways is 130 km/h, which is implicitly decreased to 80 km/h in urban areas. Similarly to other European countries they include at least 2 lanes in each direction, as well as an emergency lane on the right and auxiliary lanes for entering and leaving the motorway in intersections.

Since 2016, the legal definition of motorways include the former expressways (rychlostní silnice) which consisted of limited access highways that didn't fully meet the motorway standards and were designated by a number prefixed by the letter R. The term "motor vehicle road" (silnice pro motorová vozidla) has also been used variably to refer to the network, although this term is now used for a separate category of roads. The same rules of the road as on motorways already applied on expressways, including the speed limits, the white-on-green signage and tolls.

Highways (Silnice)

edit

This category contains all remaining state-owned roads. The highway network is divided into three classes, which are distinguished by the number of digits in the highway number. First and second class roads have blue rectangular signs placed on them and their road numbers displayed on a blue background. The class number can be optionally mentioned in written text alongside the road number, separated by a slash. No electronic vignette is needed on highways, only truck electronic toll is on selected highway sections. The speed limit on all roads is 90 km/h, reduced to 50 km/h in urban areas, with dual carriageways having the same 90 km/h speed limit unless stated otherwise.

First class roads (silnice I. třídy) are designated by an up to two-digit number and are owned by the state. Road numbers 61 and above run exclusively on Slovak territory under the original Czechoslovak numbering.

Second class roads (silnice II. třídy) are designated by a three-digit number and are owned by the regions. The first digit identifies the general location of the route:

  • 1xx - south Bohemia
  • 2xx - north Bohemia
  • 3xx - east Bohemia, Vysočina
  • 4xx - Moravia and Silesia
  • 6xx - former first class roads replaced by a motorway

Third class roads (silnice III. třídy) are also owned by the regions. These are designated by four to five-digit numbers, where the first three digits are the number of a nearby higher class road, padded by zeroes if less than three digits. The road numbers are not marked on most maps and road signs.

Road for motorcars (Silnice pro motorová vozidla)

edit

Some sections of highways have their start and end marked by blue road for motorcars signs. These roads are off-limits for other kinds of traffic. Unless stated otherwise, the speed limit is 90 km/h for single carriageways and 110 km/h for double carriageways, reduced to 80 km/h in urban areas. As they form parts of existing highways and are not a road system on their own, they do not have any specific numbering system. Thus blue informational road signs and road numbers on blue background are used on them same as for any other highway.

 
Road for motorcars sign (Silnice pro motorová vozidla)

Other roads

edit

Remaining roads with road numbers of 3 or more digits on blue background are owned and maintained by regions or local municipalities. In some major cities, road for motorcars can be designated on them with a city speed limit of 80 km/h.

Local roads

edit

Local roads (místní komunikace) are public roads that serve local traffic and are not already part of a highway or a motorway. They are owned and maintained by municipalities. Similarly to highways, they are divided into four classes according to their importance, where the first class includes the most important collector roads in cities, while the fourth class includes walk paths and bike roads that are off-limits to automobiles. The Road Act also allows for so-called "express local roads" to be built up to expressway standards to accommodate for fast motor traffic.

A first class local road can be signed as a road for motor vehicles if there are no intersections with other roads, auxiliary lanes are used for entering and exiting the road and access to adjacent buildings is forbidden. Local roads typically use the same directional signage as highways, i.e. white-on-blue signs with local destinations in black-on-white rectangles, although full black-on-white signs are increasingly adopted, notably by Prague.

Utilitarian roads

edit

Utilitarian roads (účelová komunikace) can be owned by any subject, private as well as public. Such roads are often subject of litigations because the legal status is a bit inconsistent and unclear.

  • Publicly accessible utilitarian roads have similar traffic mode as local roads; generally, forest roads and field roads are count among "utilitarian/purpose roads". However, motor vehicles are prohibited at the forest roads by the Forest Act. The national law doesn't concern over compensations or subventions to the owner, and the duty of maintenance is questionable and not stated explicitly by the law.
  • Closed utilitarian roads tend to be located in enclosed objects or facility; outside of them, the owner needs an administrative decision to exclude or restrict the public traffic. Traffic rules applies to such communications, but the owner can permit exceptions.

Network map

edit
 
Interactive map of motorways in the Czech Republic

Toll requirements

edit
 
Motorways in the Czech Republic:
  completed
  under construction
  planned
 
Current plans for a motorway network in the Czech Republic to be completed by 2030
 
The largest Czech crossroad in Lahovice near Prague, D0 motorway
 
The longest road bridge in the country, Radotínský most

Motorcars up to 3.5 tonnes

edit

Each vehicle needs to purchase time-based fee, also known as electronic vignette, before entering the motorway. This can be paid online or in selected official selling places with validity of 1 day (200 CZK) 10 days (270 CZK), 1 month (410 CZK) or 365 days (2300 CZK) . The price of the vignettes are reduced by half for cars with LPG/CNG or biomethane costing 100, 130, 200 and 1150 CZK, respectively. For plug-in hybrids the cost is roughly quarter of the price for ICE cars 50, 60, 100 and 570 CZK, respectively.[3] However, there are many unofficial websites and unofficial selling places which may charge extra fees or provide bad exchange rates.

Electronic vignettes replaced the windscreen toll vignette (dálniční známka or dálniční kupón) in 2021.

A green motorway road sign   means that a paid e-vignette toll is obligatory unless stated otherwise (usually sections from the border to the closest exit or close to large cities). Only sections not subject to e-vignette are designated with an additional road sign (see below).

For 2025, the following motorway sections are subject to the time-based electronic vignette duty for motor cars up to 3.5 t:[4]

List of motorway sections
  Motorway Motorway route subject to a time-based fee (compulsory electronic toll vignette) km
L
[clarification needed]
  Modletice (exit 76) – Prague-Slivenec (exit 16) 23
  Průhonice (exit 6) – Kývalka (exit 182) 176
Holubice (exit 210) – Kroměříž-západ (exit 258) 48
Kroměříž-východ (exit 260) – Říkovice (exit 272) 12
Přerov-Předmostí (exit 282) – Ostrava-Rudná (exit 354) 72
  Brno-Chrlice (exit 3) – border with Slovakia (exit 61)

– in the direction from Slovakia subject to a charge from km 55.5 (rest area Lanžhot)

58
  Mezno (exit 62) – Čekanice (exit 76) 14
Měšice (exit 79) – Veselí nad Lužnicí, sever (exit 104) 25
Veselí nad Lužnicí, jih (exit 107) - Úsilné (exit 131) 24
  Jíloviště (exit 9) – Třebkov (exit 84) 75
  Prague-Třebonice (exit 1) – Beroun-východ (exit 14) 14
Beroun-západ (exit 22) – Ejpovice (exit 67) 45
Sulkov (exit 89) – border with Germany (exit 151)

– in the direction from Germany subject to a charge from km 149.7 (rest area Rozvadov)

62
  Jeneč (exit 7) – Nesuchyně (km 48) 41
  Kněževes (exit 3) – Knovíz (exit 18) 15
Louny-východ (exit 45) – Louny-západ (exit 49) 4
  Zdiby (exit 1) – Řehlovice (exit 64) 64
Knínice (exit 80) – border with Germany (exit 92)

– in the direction from Germany subject to a charge from exit 64 Řehlovice

12
  Stará Boleslav (exit 14) – Bezděčín (exit 39) 25
Kosmonosy (exit 46) – Ohrazenice (exit 71) 25
  Jirny (exit 8) – Jaroměř-sever (exit 113) 105
  Sedlice (exit 127) – Ostrov (exit 158) 31
Mohelnice-jih (exit 235) – Křelov (exit 261) 26
Olomouc-Holice (exit 276) – Lipník nad Bečvou (exit 296) 20
  Vyškov-východ (exit 1) – Prostějov-jih (exit 21) 21
Držovice (exit 26) – Hněvotín (exit 37) 11
  Bělotín (exit 1) – Jeseník nad Odrou (exit 8) 8
Palačov (km 12) – Nový Jičín-centrum (exit 21) 8
Rybí (exit 24) – Frýdek-Místek východ (exit 52) 28
Dobrá (exit 54) – Žukov (exit 70) 16
  Rajhrad (exit 10) – Pohořelice-sever (exit 23) 13
  Hulín (exit 16) – Otrokovice-sever (exit 30) 14
Otrokovice-východ (exit 32) – Napajedla (exit 34) 3
  Ostrava-Hrabová, průmyslová zóna (exit 40) – Frýdek-Místek (exit 54) 14

Vehicles over 3.5 tonnes

edit

As of 1 January 2007 a new system of electronic toll aka a distance toll for vehicles with a weight exceeding 12 tons has been introduced for motorways and some roads of the first class (silnice první třídy), totally cca 200 km.[5] As of 1 January 2010, this applies also to vehicles over 3.5 tons. There is an ongoing public discussion on imposition of electronic toll for all cars and vehicles.

History

edit

Motorways

edit
 
Plan of the motorway network for the First Czechoslovak Republic (1935)
 
Plan of the motorway network for the Protectorate of Bohemia and Moravia within the Nazi Germany and the Slovak Republic (1939)
 
Plans of the motorway network for the Czechoslovak Socialist Republic (1963)

The first informal plan for a motorway (first called in Czech autostráda or dálková silnice) in Czechoslovakia date back to 1935. This was to link Prague through Slovakia with the easternmost Czechoslovak territory, Carpathian Ruthenia (now Zakarpattia Oblast in Ukraine). The terminus was to be at Velykyy Bychkiv (Velký Bočkov in Czech) on the Romanian border. The definitive route, including a Prague ring motorway, was approved shortly after the Munich Agreement on 4 November 1938, with a planned speed limit of 120 km/h.

The Nazi authorities also made the second Czecho-Slovak Republic, already a German satellite state, build a part of the Reichsautobahn Breslau - Vienna as an extraterritorial German motorway with border checkpoints at each motorway exit. However, only a construction of the route within Bohemia and Moravia was initiated, but never finished. It still sporadically appears in some current Czech motorway plans.

On 1 December 1938 Nazi Germany had already initiated a construction of the so-called Sudetenautobahn (in Sudetenland, before the Munich agreement part of Czechoslovakia, then of Germany) in the route Streitau (Bavaria) – EgerCarlsbadLobositzBöhmisch LeipaReichenberg (capital of Sudetenland) – Görlitz (in Prussia, now in Saxony). The autobahn has never been finished, but some remnants in the landscape close to Pomezí nad Ohří, Cheb/Eger and Liberec/Reichenberg are still prominent and an unfinished part from Svárov via Machnín to Chrastava was used in the construction of the I/35 road.

Nazi occupation

edit

Czechoslovakia was broken up with a declaration of independence by the Slovak Republic and by the short-lived Carpatho-Ukraine which was a prelude to the German occupation of Bohemia and Moravia on 15 March 1939. It was decided to build the motorway only as far as the Slovak border. The technical parameters of motorways (speed limit of 140 – 160 km/h) were adjusted to those of the German Reichsautobahn, as Czech (Bohemian-Moravian) motorways were to be integrated within the German Reichsautobahn network.

The project for the first segment Prague - Lužná was ready in January 1939, and construction in Moravia began on 24 January in Chřiby on the Zástřizly - Lužná segment. The construction in Bohemia from Prague began on 2 May 1939, with a switch to right-hand traffic in Bohemia and Moravia having already gone without a hitch. The motorway should have reached Brno in 1940, but building materials and labour shortages due to an absolute priority given to the Nazi armament industry delayed the work considerably. The construction in the route of approx. 77 km from Prague towards Brno advanced notably, but a prohibition of all civil constructions by the German authorities came into force in 1942.

After the Second World War

edit

After the Second World War, the completion of only the first and unfinished 77 km of the motorway Prague – Brno as far as Humpolec was approved by the Government in November 1945 and was reinaugurated in 1946. The part-built construction sites of the Sudetenautobahn (28 km) were completely abandoned, as well as that of the Breslau – Vienna motorway (84 km). The latter was, however, incorporated in some plans as a future connection motorway between Brno and the D35 motorway. The 77 km of the Prague – Humpolec motorway had been completed except for some large bridges and a concrete surface when the new communist government decided to discontinue the work completely in early 1950.

Only on 8 August 1967 the Government of the Socialist Republic of Czechoslovakia resolved to continue the construction of motorways by adopting a new motorway plan for the whole country and resolved to continue the already twice interrupted construction of the motorway Prague - Brno (number D1) and further Brno - Bratislava (D2). The construction was solemnly inaugurated on 8 September 1967. Due to a change of technical parameters, some bridges finished before 1950 were replaced. The Prague - Brno motorway (D1), initiated on 2 May 1939, reached Brno in 1980, a full 40 years after the originally scheduled opening.

The pace of construction of motorways has always been rather slow up to the present day. The first 100 km of motorways on the territory of today's Czech Republic were completed in 1975, 500 km in 1985, 1,000 km in 2007 and 1,500 km in 2024. Funding for the construction of motorways was radically reduced after the financial crisis in 2008 due to draconian budget cuts, and is currently gaining momentum rather slowly for various reasons.

Future plans

edit

Planning for further development of the motorway network continues to the present day. In April 2025, the Ministry of Transport published a new map outlining the planned expansion of the Czech motorway and road network, based on the study Opportunities and Possibilities for the Development of the Motorway and Road Network after 2050. The study presents a theoretical proposal emphasizing the connection of regional capitals, improved traffic quality, and the provision of alternative long-distance routes in case of closures or detours. The total length of the main corridors identified for further monitoring is approximately 540 km. Construction costs for these sections are estimated at around CZK 320 billion (at 2021 price levels), with a total projected investment of CZK 360 billion including supplementary corridors. Key proposed routes include D20 (Plzeň – Písek – Jihlava), D19 (Domašov – Prostějov), and the Central Bohemian Ring Road D99. The precise routing and implementation of these new motorways will be subject to future feasibility studies and negotiations with regional and local authorities, with the Ministry emphasizing the need to reach a broad societal consensus.[6]

Other highways

edit

Until 1938, separate lands of Czechoslovakia have different laws and road systems, inherited from the Austro-Hungarian period. Just in 1938, a unified Czechoslovak road act passed. In 1935, there existed Czechoslovak state roads (not distinguished by class) and several types of non-state public roads:

  • in Bohemia, silnice zemské (land roads), silnice okresní (district roads), silnice a cesty obecní (municipal roads and ways) (there was only one remained 23 km land road in Bohemia, connecting Jilemnice, Vysoké nad Jizerou and Rokytnice nad Jizerou)
  • in Moravia, silnice okresní (district roads) of 1st and 2nd class, silnice a cesty obecní (municipal roads and ways)
  • in Czech Silesia, silnice okresní (district roads) of 1st and 2nd class, silnice a cesty obecní (municipal roads and ways) and veřejné cesty interesentů (public ways of interesents)
  • in Slovakia and Zakarpattia, zemské cesty (land roads, formerly župné cesty, župa roads), príjezdné cesty (access roads), vicinální cesty (vicinal roads), cesty obecné (municipal roads and ways) and cesty interesentů (ways of interesents).

Thus, in the Moravian-Silesian Land existed no land roads, in Slovakia and Zakarpattia were no district roads but existed a special class of "access roads", and in Bohemian and Moravia existed not a status of "public ways of interesents".[7]

Historically, local communications is a successor term for the former obecní silnice (municipal roads) and obecní cesty (municipal ways). The terms "utilitarian communications" replaced the former term cesty interesentů or zájemnické cesty (ways of interesents) since 1961. However, in Bohemia and Moravia, public way on a private plot was concepted as a municipal way before the 1961 reform, and maintained by the municipality.

Příjezdní komunikace (access communications) to the railway stations were a special class of roads before 1938 in Slovakia nad Zakarpattia. Since 1938, access communications to railway stations, airports and ports should be built as municipal roads or district roads, as was the previous praxis in Bohemia, Moravia and Silesia. Paradoxically, the today's main access road to the main Prague airport (Václav Havel International Airport in Prague-Ruzyně) is a private property of the airport and has a status of a "utilitarian communication".

Czechoslovak act no. 147/1949 Sb. nationalized all previous státní (state), zemské (land), and okresní (district) roads and authorized the government to list other individual roads (vicinal, municipal and others) to be nationalized) or negotiate a transfer of redundant state roads to administration by municipalities. The Czechoslovak act no. 135/1961 Sb. stated a terminology and classification which is in essence continued in today's Czech Republic and Slovakia.

Motorways

edit
 
Border road sign with general speed limits in the Czech Republic

The motorways in the Czech Republic, Czech: dálnice (abbr. D) are dual carriageways with an emergency hard shoulder or emergency lay-bys. The default speed limit is 130 km/h or 81 mph, which will be locally raised by a sign to 150 km/h or 93 mph for a few months as of mid-2025.[8] Their highway shields are white on red and road signs are white on green. As of February 2024, the Czech motorway network comprises 18 motorways. Nowadays, 17 of them are at least partially operational, but only 6 (D2, D5, D8, D10, D46 and D56) have been completed, another two (D1 and D4) have their final stretch in construction.

The number of a motorway reflects the number of the former highway alongside which it was built up or which it shall replace. After the construction of the motorway, the affected highway is degraded to a regional road with a number beginning with 6 and having 3 digits, in the format 6xx. For instance, after the completion of the D8 motorway (Prague – Lovosice), the previous highway I/8 between Prague and Lovosice became a regional road 608. Regional roads are maintained by the self-governing regions) and not by the state directly.

  Motorway Name of motorway Motorway route Operational
(km)[9]
% operational
In construction
(km)
Planned Total length
(km)
Maximum AADT
  D0 Prague Ring (Pražský okruh) 41 49% 12.6 83 75,092
  D1 PragueJihlavaBrnoVyškovHulínPřerovLipník nad BečvouBělotínOstravaBohumín  Poland (motorway   A 1) 362 98% 10,1 371 99,265
  D2 BrnoBřeclav  Slovakia (motorway  ) 61 100% 61 50,905
  D3 PragueTáborČeské BudějoviceDolní Dvořiště  Austria (expressway  ) 66 41% 19,8 168 14,097
  D4 PraguePříbramHáje 75 89% 84 29,617
  D5 Via Carolina (PragueBerounRokycanyPlzeňRozvadov  Germany (motorway   A 6)) 151 100% 151 58,760
  D6 PragueKarlovy VarySokolovChebPomezí nad Ohří  Germany (bundesstraße  ) 102 60% 26.5 169 39,449
  D7 PragueLounyChomutov 45 55% 16.6 82 33,479
  D8 PragueLovosiceÚstí nad LabemKrásný Les  Germany (motorway   A 17) 96 100% 96 48,003
  D10 PragueMladá BoleslavTurnov 71 100% 71 43,430
  D11 PraguePoděbradyHradec KrálovéJaroměřTrutnovKrálovec  Poland (expressway   S 3) 91 60% 21.2 154 43,986
D19 DomašovProstějov 0% 65
D20 PlzeňNepomukBlatnáPísekJindřichův HradecJihlava 0% 185
  D35 Hradec KrálovéSvitavyMohelniceOlomoucLipník nad Bečvou 66 31% 52.8 210 34,055
D37/D38 JihlavaHavlíčkův BrodČáslavPřeloučChlumec nad Cidlinou 0% 85
  D46 VyškovProstějovOlomouc 38 100% 38 36,136
  D48 BělotínNový JičínFrýdek-MístekČeský Těšín 41 51% 17,5 79 18,642
  D49 HulínZlínVizoviceStřelná  Slovakia (expressway  ) 17 0% 7.5 69
  D52 BrnoPohořeliceMikulov  Austria (motorway  ) 17 32% 45 23,535
  D55 OlomoucPřerovHulínOtrokoviceHodonínBřeclav 16 17% 11,4 101 16,102
  D56 OstravaFrýdek-Místek 14 100% 14 24,957
D99 Central Bohemian Ring around Prague (Středočeský okruh kolem Prahy) 0% 206
Total 1317 63% 136,5 2662

Originally, motorway D47 was planned from Brno to Ostrava and construction in the section Lipník nad Bečvou - Ostrava started under this number, but in the end the ŘSD in 2006 decided that the D47 should be classified as an extension of the D1 motorway.

Roads for motorcars

edit
 
Road sign marking the start of Road for motorcars (silnice pro motorová vozidla)

Road for motorcars do not form a network on their own, they are just upgraded sections of regular highways. Roads for motorcars are not subject to tolls for vehicles with total weight up to 3.5 t. The signs on roads for motorcars consist of white text on a blue background, like on other highways and unlike on motorways, where the background is green. Exits, like on motorways, are usually numbered. The speed limit is 110 km/h.

List of completed roads for motorcars

edit
  Name Route
  Městský okruh Praha MO (previously I/29)(Prague City Ring)   Rybníčky – Krč – Braník – Smíchov – Břevnov – Troja
Chodovská radiála I/8 (Chodov Trunk Road in Prague) Pankrác - Průhonice (motorway   )
Radlická radiála I/5 (Radlice Trunk Road in Prague) Bucharova St. - Třebonice (motorway   )
Vysočanská radiála I/10 (Vysočany Trunk Road in Prague) Kbelská St.- Satalice (motorway   and   )
Štěrboholská spojka I/12 (Štěrboholy Trunk Road in Prague) Rybníčky - Běhochovice (motorway   )
Spořilovská spojka (Spořilov Trunk Road in Prague) Chodovská St.- Chodov (motorway   )
  I/6 Dvory – Jenišov (motorway   )
  I/7 Spořice (motorway   ) - Chomutov
  I/10 Ohrazenice (motorway   ) - Ohrazenice
  I/11 Mokré Lazce - Ostrava-Poruba
  I/20 Nová Hospoda (motorway   )- Písek
  I/23 Brno-západ (motorway   ) – Brno-Bauerova St.
  I/26 Plzeň-K Fořtovně St.- Ejpovice (motorway   )
  I/27 Plzeň-Dobřanská St.(motorway   ) – Vysoká u Dobřan
  I/34 České Budějovice - Úsilné (motorway   ) - Lišov, interchange Na Klaudě St.
  I/35 Liberec-Hodkovická St.- Ohrazenice (motorway   )
  I/35 Křelov - Olomouc
  I/37 Hradec Králové – Pardubice
  I/43 Česká – Brno-Křižíkova St.
  I/44 Vlachov - Rájec, Postřelmov ring road
  I/48 Český Těšín (motorway   ) – Chotěbuz
  I/50 Brno-Gajdošova St.– Brno-východ (motorway   )
  I/63 Bystřany - Řehlovice (motorway   )

Planned upgrade to road for motorcars:

  • I/7 Spořice - Křimov
  • I/13 Chomutov - Teplice (some parts)
  • I/13 Ostrov - Karlovy Vary
  • I/11 Ostrava-Vítkovice - Šenov
  • I/14 Liberec: interchange I/35 - roundabout Kunratice (direction Jablonec n. N.)
  • I/35 roundabout Hrádek nad Nisou - Liberec, interchange Hodkovická St.(inc. border road, only a single carriageway road)[10]

Opening of new motorways

edit

Construction of new motorways in recent years has been hampered due to corruption scandals and austerity measures as well as owing to new European rules under which old EIA assessments lapsed. See the table below.[11] However, this should improve slightly in next years. By the end of 2017, there were 58.2 km of new motorways under construction, in 2018 a construction of further 130.3 km should be initiated (apart from the ongoing reconstruction of the motorway D1).[12] Nonetheless, only 18.1 km of new motorways may open to public in 2018, 18.8 km in 2019 and 29.7 in 2020.

While in 2021 47 km[13] of new motorways were opened, in 2022 it was 21 km[14] but in 2023 it was only 15.4 km.[15]

Between 1971 and 2014 the average year pace of completion of new motorways was 28.2 km a year.[16]

  Motorway From To Length Construction started Due to open Remarks
  Běchovice   12.6 km 12/2024 2027
  Říkovice Přerov 10.1 km 2022 2026
  Kaplice train station Nažidla 8.6 km 06/2024 2026
  Nažidla Dolní Dvořiště - border with   Austria 3.5 km 01/2024 2026
  Krupá Hořesedly 9.2 km 02/2023 07/2025
  Hořesedly Hořovičky 5.2 km 03/2023 2025
  Petrohrad Lubenec 12.1 km 11/2024 2027
  Knovíz Slaný West 6.4 km 11/2024 2027 widening
  Slaný West Kutrovice 3.4 km 12/2024 2026 widening
  Kutrovice Panenský Týnec 6.8 km 12/2024 2027 widening
  Trutnov Královec - border with   Poland 21.2 km 10/2024 2028
  Hořice Sadová 10.5 km 11/2023 2025
  Sadová Plotiště 7.5 km 2024 2026
  Ostrov Vysoké Mýto 6.2 km 05/2024 2026
  Vysoké Mýto Džbánov 6.0 km 11/2023 2025
  Džbánov Litomyšl 7.6 km 04/2024 2027
  Janov Opatovec 11.8 km 05/2023 2025
  Křelov Slavonín 3.2 km 02/2024 2026
  Lešná Palačov 3.7 km 06/2023 2026
  Holešov Fryšták 7.5 km 2021 2025
  Napajedla Babice 0.5 km 04/2023 2025 bridge

See also

edit

References

edit
  1. ^ "Czech Republic to Allow 150 km/h Speed Limit on Selected Highways - Czech Daily". 2023-07-25. Retrieved 2023-12-28.
  2. ^ "České dálnice". Ceskedalnice.cz. Retrieved 2019-05-09.
  3. ^ "Aktuální ceník". elektronická dálniční známka. SFDI. Retrieved 1 March 2024.
  4. ^ "Dálniční známky". ceskedalnice.cz (in Czech). Retrieved 14 February 2023.
  5. ^ "Toll map". www.mytocz.eu. Archived from the original (GIF) on 2018-08-30. Retrieved 2019-05-09.
  6. ^ "Nové české dálnice vyjdou na 360 miliard. Stát ukázal podrobnější mapu, začíná hledat shodu". Zdopravy.cz. 2025-04-16. Retrieved 2025-04-17.
  7. ^ Vládní návrh zákona o veřejných silnicích a veřejných cestách a o silniční a cestní policii (silniční zákon), governmental proposal of the Road Act, 1935, reasoning report
  8. ^ "Czech highways speed up: How fast can you go in 2025?". 2024-12-11.
  9. ^ https://www.rsd.cz/wps/portal/web/Silnice-a-dalnice/delky-a-dalsi-data-komunikaci Øeditelství silnic a dálnic ÈR: Délky a další data komunikací
  10. ^ "forum.ceskedalnice.cz". forum.ceskedalnice.cz. Retrieved 2016-01-21.
  11. ^ "České dálnice | Úseky ve výstavbě". Ceskedalnice.cz. Retrieved 2019-05-09.
  12. ^ "Archived copy". Archived from the original on 2016-10-11. Retrieved 2016-10-11.{{cite web}}: CS1 maint: archived copy as title (link)
  13. ^ Dolejší, Milan (30 December 2021). "Rok 2021 obohatil dálniční síť o téměř 47 kilometrů, začalo se stavět dalších více než sedmdesát". ct24.cz (in Czech). Czech Television. Retrieved 1 March 2024.
  14. ^ Dolejší Milan, Dolejší Milan (31 December 2022). "Rok 2022 v dopravě: Dálniční síť se rozrostla o 21 kilometrů, železniční koridory dostaly nový kabát". ct24.cz (in Czech). Czech Television. Retrieved 1 March 2024.
  15. ^ Dolejší, Milan (30 December 2023). "Za poslední rok přibylo jen patnáct kilometrů dálnic. Ten příští ale přinese osmkrát víc". ct24.cz (in Czech). Czech Television. Retrieved 1 March 2024.
  16. ^ "Souhrnná data zprovozňování dálnic (vč. původně rychlostních silnic) v České republice" (PDF). www.ceskedalnice.cz (in Czech). Retrieved 2019-05-09.
edit