Hollandse Kust Zuid Wind Farm (officially Hollandse Kust (Zuid) Wind Farm Zone) is an offshore wind farm being built in the Dutch part of the North sea. The farms consists of 4 sites and 2 wind farms.[1] Both farms are developed by Vattenfall as a single project. The farm will have a total installed capacity of 1529 MW. The farm consists of 139 Siemens Gamesa 11.0-200 DD wind turbines with a capacity of 11 MW each.[2] It encompasses the Eneco Luchterduinen offshore wind farm from the southwest, southeast and northwest.
Hollandse Kust Zuid | |
---|---|
Country |
|
Coordinates | 52°22′00″N 4°07′00″E / 52.366667°N 4.116667°E |
Status | Operational |
Construction began |
|
Commission date |
|
Wind farm | |
Type | |
Max. water depth |
|
Distance from shore |
|
Hub height |
|
Rotor diameter |
|
Site area |
|
Power generation | |
Units planned | 139 × 11 MW |
Units cancelled | 1 × 11 MW |
Nameplate capacity |
|
External links | |
Website | vattenfall-hollandsekust |
Construction of the farm started in June 2021. The last wind turbine was installed on 13 June 2023.[3] The wind farm was inaugurated by king Willem Alexander on 29 September 2023. The wind farm is expected to be fully operational in 2024.[4]
Originally 140 wind turbines were planned. In January 2022 (while the wind farm was still being built) bulk carrier Julietta D lost power during a storm and became rudderless. It collided with one of the wind turbine foundations and one of the two offshore substations. The jacket of the substation suffered only minor damage. The monopile however was damaged beyond repair. The damaged foundation will be removed in 2024.[3]
Wind Farms
editHollandse Kust (Zuid) I & II
editThe tender for this farm was held in December 2017. Chinook, a subsidiary of Vattenfall, was announced the winner on 19 March 2018.[5] The wind farm has a total capacity of 770 MW.
Hollandse Kust (Zuid) III & IV
editThe tender for the second farm was held in March 2019. Vattenfall was announced the winner on 10 July 2019.[6] The wind farm will also have a capacity of 770 MW.
See also
editReferences
edit- ^ "Hollandse Kust (zuid) Wind Farm Zone including Offshore Wind Farm Luchterduinen (LUD)". Noordzeeloket UK. Retrieved 2023-04-04.
- ^ "Frequently asked questions". Windpark Hollandse Kust South. Retrieved 2023-04-04.
- ^ a b margientimmer (2023-06-13). "Last turbine for Hollandse Kust Zuid". Windpark Hollandse Kust South. Retrieved 2023-06-29.
- ^ margientimmer (2023-09-29). "Offshore windfarm Hollandse Kust Zuid inaugurated". Windpark Hollandse Kust South. Retrieved 2023-10-02.
- ^ "Hollandse Kust (Zuid) Wind Farm Zone, Sites I and II | RVO.nl". english.rvo.nl. Retrieved 2023-04-04.
- ^ "Hollandse Kust (zuid) Wind Farm Zone, Sites III and IV | RVO.nl". english.rvo.nl. Retrieved 2023-04-04.