For the Institution of Civil Engineers (ICE), the ICE Demolition Protocol is a British waste management protocol produced by EnviroCentre, in partnership with London Remade. It came out of a joint ICE and Institute of Waste Management group called the Resource Sustainability Initiative.[1]
The first edition was founded in 2003 and the second in 2008, although the second version does not supersede the second.[2]
References
edit- ^ EnviroCentre Ltd. "A Report on the Demolition Protocol" (PDF).
- ^ "Demolition Protocol - production".