Isar Nuclear Power Plant

Isar I and Isar II were two nuclear power plants situated on the Isar river, 14 kilometres from Landshut, between Essenbach and Niederaichbach in Bavaria, Germany.

Isar Nuclear Power Plant
Isar nuclear power plant
Map
CountryGermany
Coordinates48°36′20.18″N 12°17′35.34″E / 48.6056056°N 12.2931500°E / 48.6056056; 12.2931500
StatusDecommissioned
Construction began1971
Commission date21 March 1979
Decommission date15 April 2023
OwnersIsar 1: PreussenElektra (100%)
Isar 2: 75% PreussenElektra; 25% SWM
OperatorPreussenElektra
Nuclear power station
Reactor typeUnit 1 BWR
Unit 2 PWR
Cooling towers1
Cooling sourceIsar River
Power generation
Units operational1 x 1485 MW (Unit 2)
Units decommissioned1 x 912 MW (Unit 1)
Nameplate capacity2,387 MW
Capacity factor91.1%
Annual net output19,051 GW·h
External links
WebsiteIsar 1 and 2
CommonsRelated media on Commons

As part of the nuclear power phase-out, it was taken out of service on 15 April 2023.[1][2]

Safety

edit

Passive safety features

edit

The safety feature begins with the passive safety feature which includes the radioactive materials in the reactor core (also by accidents[clarification needed]) to protect them from the outside environment. Fuel pellets, fuel rod casings, reactor pressure vessel, biological shield, steel containment structure and the outer ferro concrete mantle are six of the most important passive safety features.[citation needed]

Active safety features

edit

The passive safety installations are supplemented by a lot of automatically working active safety systems whose reliableness is based on their plural existence and their autonomously working in separate rooms. This is as necessary for the internal electric power supply as for the reactor cooling system, which guarantees the reliable thermal dissipation in every operating status, even when an implausible accident ingresses (for example a break of a primary coolant line). It constantly controls and compares all the important key operating parameters of the plant and activates automatically the necessary protection measures (independent from the plant operating personnel) if a parameter reaches a limit value. For example, the protection system may initiate a rapid shutdown and aftercooling procedure.

The future

edit

On-site storage facilities

edit
 
Fuel assembly container storage facility on the area of the Isar nuclear power plant

By law, all German nuclear power plants are forced to store their atomic waste in on-site storage facilities near the power plant. These temporary storage facilities have to be used until a final processing plant is built in a central location in Germany, to where all nuclear power plants will send their atomic waste. The usage of this storage is planned from 2030 onwards, so interim storage facilities are necessary.[citation needed]

The nuclear power plants Isar must also therefore have its own temporary storage facility, which has been under construction since 15 June 2004.[needs update]

Work on the temporary storage facility at the Isar location was marked by protest actions from environmentalist and resident groups, which voiced concern about possible health effects.[citation needed]

The interim storage facility of Isar nuclear power plant is in use since 2007 and provides capacity for 152 fuel element containers.[clarification needed]

Phasing-out of nuclear power

edit

Concerns for the safety of nuclear power production were greatly increased after the Chernobyl accident in 1986, eventually leading to plans for its phase-out in certain countries. According to German Nuclear Phase-out regulations, Isar-I was to be shut down in 2011, with operations in Isar-II continuing until 2021. After the March 2011 Tōhoku earthquake and tsunami in Japan, however, the decision was made to expedite shutdown. Isar-I was closed as of 17 March 2011 for a three-month moratorium on nuclear power the result of that moratorium announced in the early hours of 30 May 2011 was that Isar-I would not return. Isar-II, being one of the strongest (ca. 1,400 MW) and most modern reactors in Germany, ran until the end of the phase-out on April 15, 2023.