Line 18 (formerly known as Line 5A) of CRT is a metro line in Chongqing, China. It is expected to be fully completed in 2028.
Line 18 | |||
---|---|---|---|
Overview | |||
Native name | 重庆轨道交通18号线 | ||
Status | Partially open | ||
Line number | 18 | ||
Locale | Chongqing, China | ||
Termini | |||
Stations | 19 (Phase 1) | ||
Service | |||
Type | Rapid transit | ||
System | Chongqing Rail Transit | ||
Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. | ||
History | |||
Opened | 28 December 2023 | ||
Technical | |||
Line length | 29.016 km (18.0 mi)[1] (Phase 1) | ||
Number of tracks | 2 | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
Electrification | 1500 V DC Overhead line | ||
|
Stations
editPhase I
editPhase I of Line 18 started construction in 2 March 2021, and opened in 28 December 2023.[2] It is 29.016 km in length.[1]
Station No. |
Station name | Connections | Distance km |
Location | |||||
---|---|---|---|---|---|---|---|---|---|
English[3] | Chinese | ||||||||
Fuhualu | 富华路 | Line 9 | - | 0 | Yuzhong | ||||
Xietaizi (Not currently open) | 歇台子 (暂未开通) | Line 1 Line 5 | 2.053 | Jiulongpo | |||||
Olympic Sports Center | 奥体中心 | Loop line | 1.354 | ||||||
Shipingqiao | 石坪桥 | 1.317 | |||||||
Yangjiaping | 杨家坪 | Line 2 | 1.270 | ||||||
Tanzikou | 滩子口 | 1.617 | |||||||
Huangjueping | 黄桷坪 | CRW | 1.367 | ||||||
Sichuan Fine Arts Institute | 四川美术学院[4] | 0.930 | |||||||
Dianchang | 电厂 | 0.934 | |||||||
Lijiatuo Daqiao | 李家沱大桥[4] | 2.020 | Ba'nan | ||||||
Chongqing University of Technology | 重庆理工大学[4] | 1.116 | |||||||
Huaxi Industrial Park | 花溪工业园[4] | 1.728 | |||||||
Babinlu Wetland Park | 巴滨路湿地公园[4] | 1.996 | |||||||
Qiezixi | 茄子溪 | QXW | 1.634 | Dadukou | |||||
Baijusi | 白居寺 | Line 2 | 1.406 | ||||||
Funiuxi | 伏牛溪 | 1.217 | |||||||
Jin'aoshan | 金鳌山 | 2.180 | |||||||
Tiaodeng | 跳磴 | Line 5 Jiangtiao line | 2.315 | ||||||
Tiaodengnan | 跳磴南 | 1.676 | |||||||
Phase II
edit- Currently under construction[5]
Station No. |
Station name | Connections | Distance km |
Location | |||||
---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||
Xiaoshizi | 小什字 | Line 1 Line 6 | Yuzhong | ||||||
Kaixuanlu | 凯旋路 | ||||||||
Shibati | 十八梯 | ||||||||
Qixinggang | 七星岗 | Line 1 10 | |||||||
Chongqing Station | 重庆站 | 27 CQW | |||||||
Caiyuanlu | 菜袁路 | ||||||||
Huangshaxi | 黄沙溪 | ||||||||
Daping West | 大坪西 | ||||||||
References
edit- ^ a b "视频 离通车更近一步 重庆轨道交通18号线南段接触网送电成功". May 24, 2023.
- ^ "重庆18号线今日通车 市民下午2点可乘坐". cqcb.com. December 28, 2023. Retrieved December 28, 2023.
- ^ "重庆轨道交通线网图". Archived from the original on June 9, 2022.
- ^ a b c d e "重庆轨道交通18号线开启不载客试运行". September 6, 2023.
- ^ "重庆新开工4条轨道线路 看看这些站有没有经过你家". March 2, 2021.