Jingan (Chinese: 景安, formerly transliterated as Ching-An Station until 2003) is a metro station in New Taipei, Taiwan, served by Taipei Metro. The elevated Circular line platforms opened on 31 January 2020.[3]

Jingan

O02/Y11 景安

New Taipei metro station
Platform
Chinese name
Chinese景安
Transcriptions
Standard Mandarin
Hanyu PinyinJǐng'ān
Bopomofoㄐㄧㄥˇ ㄢ
Wade–GilesChing³ An¹
Hakka
Pha̍k-fa-sṳKín-ôn
Southern Min
Tâi-lôKíng-an
General information
Location168 Jingan Rd, 486 Jingping Rd
Zhonghe, New Taipei
Taiwan
Coordinates24°59′38″N 121°30′17″E / 24.9939°N 121.5046°E / 24.9939; 121.5046
Line(s) Zhonghe–Xinlu line (O02)
Circular line (Y11)
Construction
Structure typeUnderground
Bicycle facilitiesAccess available
Other information
Websiteweb.metro.taipei/e/stationdetail2010.asp?ID=O02-047
History
OpenedZhonghe-Xinlu line: 1998-12-24,[1] Circular line: 2020-01-31
Passengers
201717.308 million per year[2]Decrease 0.46%
Rank(Ranked 28th of 109)
Services
Preceding station Taipei Metro Following station
Yongan Market
towards Huilong or Luzhou
Zhonghe–Xinlu line Nanshijiao
Terminus
Preceding station New Taipei Metro Following station
Jingping
towards Dapinglin
Circular line Zhonghe

Station overview

edit

This six-level, underground station has two stacked side platforms (a split platform configuration,) two side platforms and one exit.[4][5] Jingan station is also the only transfer station in the Taipei Metro to have only one exit. The platforms planned intersection with include additional.[6]

Due to the availability of the station area, when the Zhonghe line platform was being constructed, it adapted a stacked side platform configuration, making the platform level reach to six levels underground, making it one of the deepest stations in the metro system. The elevated Circular line, on the other hand, is one of the highest stations in the metro system with the platform level located five floors above ground, due to the Circular line needing to share the same path as Provincial Highway 64 on some parts of the line. Transferring from the Zhonghe-Xinlu line to the Circular line or vice versa takes about 5 minutes, with the height difference between the two platforms reaching 10 levels, the largest height difference of all transfer stations in the Taipei Metro.[7]

Station layout

edit
6F Connecting Level Platforms-connecting Overpass
5F Side platform, doors will open on the right
Platform 1   Circular line towards New Taipei Industrial Park (Y12 Zhonghe)
Platform 2   Circular line towards Dapinglin (Y10 Jingping) →
Side platform, doors will open on the right
3F Connecting
Level
Restrooms (inside paid area)
Street Level Concourse Exit/Entrance, lobby, toilets, one-way ticket machine, information desk
B3 Midderly Officer Side work
B4 Platform 1   Zhonghe–Xinlu line toward Luzhou / Huilong (O03 Yongan Market)
Side platform, doors will open on the left
B6 Platform 2   Zhonghe–Xinlu line toward Terminus (O01 Nanshijiao)
Side platform, doors will open on the right

Exits

edit
  • Single Exit: Jingan Rd.  

Around the station

edit
  • Jinshan Bannan Park (250m south of the station)
  • Zhonghe Heping Street Market (250m southeast of the station)

References

edit
  1. ^ "Chronicles". Taipei Metro. 5 December 2013. Retrieved 10 October 2018.
  2. ^ "臺北市交通統計查詢系統". dotstat.taipei.gov.tw (in Chinese). Archived from the original on 22 February 2014. Retrieved 15 September 2018.
  3. ^ "Second Stage of Taipei MRT (Approved MRT Routes)". Department of Rapid Transit Systems. 2010-03-12. Archived from the original on 2012-03-02. Retrieved 2010-06-16.
  4. ^ "Jingan Station Station Location Map". Department of Rapid Transit Systems. Archived from the original on 2012-03-06. Retrieved 2010-06-16.
  5. ^ "第二章 站場規劃". Department of Rapid Transit Systems. 2011-05-15. Archived from the original on 2011-02-26. Retrieved 2011-05-16.
  6. ^ "Introduction of the Circular Line Phase I" (PDF). Department of Rapid Transit Systems. December 2009. Archived from the original (PDF) on 2016-03-03. Retrieved 2010-06-16.
  7. ^ "Station Profile: Jingan".