Jiri Khola Small Hydropower Station (Nepali: जिरी खोला सानो जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Dolakha District of Nepal. The flow from Jiri River is used to generate 2.4 MW electricity.
Jiri Khola Small Hydropower Station | |
---|---|
Official name | Jiri Khola Small Hydropower Project |
Country | Nepal |
Location | Dolakha District |
Coordinates | 27°35′06″N 86°14′00″E / 27.58500°N 86.23333°E |
Purpose | Power |
Status | Operational |
Owner(s) | Bojini Company (P.) Ltd |
Dam and spillways | |
Type of dam | Gravity |
Impounds | Jiri River |
Commission date | 2073-03-09 BS |
Type | Run-of-the-river |
Installed capacity | 2.4 MW |
The plant is owned and developed by Bojini Company (P.) Ltd, an IPP of Nepal. The plant started generating electricity from 2071 to 2011-01 BS. The generation licence will expire in 2102-11-16 BS, after which the plant will be handed over to the government.[1] The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority.[2]