Lakeland—Fort Myers Line

The Atlantic Coast Line Railroad's Lakeland—Fort Myers Line was one of the railroad company's secondary main lines in Central and Southwest Florida. It was built incrementally in the late 1800s and early 1900s. Parts of the line are still active today.

Lakeland—Fort Myers Line
Overview
Other name(s)Fort Myers Subdivision
StatusSome segments are still operating
OwnerAtlantic Coast Line Railroad (1902–1967)
Seaboard Coast Line Railroad (1967–1986)
LocaleSouthwest Florida
Continues asFort Myers Southern Branch
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationNo
SignallingNone
Route map
Map Lakeland—Fort Myers Line (red),
the Bartow Branch and Fort Myers Southern Branch (dark red), and the 1944 realignment of the Fort Myers Southern Branch to Downtown Naples (blue). Click to enlarge.

Route description

edit

The Lakeland—Fort Myers Line began at the Atlantic Coast Line's Main Line just east of downtown Lakeland. From there, it ran southeast to Bartow. After running though central Bartow, it continued south through Fort Meade, Bowling Green, Wauchula, and Zolfo Springs. At a point near Gardner, it turned southwest and went through Arcadia to Punta Gorda on the Gulf Coast. From Punta Gorda, it continued south along the coast to Fort Myers.

Branches

edit

In later years, the line continued south from Fort Myers to Bonita Springs and Naples. While a continuous line, track south of Fort Myers was classified separately on employee timetables as the Fort Myers Southern Branch.[1] The Fort Myers Southern Branch extended as far south as Marco Island at its greatest extent.[2]

The Lakeland—Fort Myers Line also connected with the Atlantic Coast Line's Bartow Branch, which ran from Bartow northeast through Winter Haven to the Atlantic Coast Line's Main Line at Lake Alfred. Many long-distance passenger trains to Southwest Florida often used the Bartow Branch throughout its history.[1]

History

edit

Lakeland to Charlotte Harbor

edit

The northernmost 14 miles of the line from Lakeland to Bartow were built by the South Florida Railroad in September 1884. It was the southern leg of the South Florida Railroad's Pemberton Ferry Branch (the northern leg of the branch north of the main line would be part of the High Springs–Lakeland Line). The Bartow Branch was also built by the South Florida Railroad in 1884. South of Bartow, the line was originally the Florida Southern Railway's Charlotte Harbor Division. Both the South Florida Railroad and the Florida Southern Railway eventually became part of Henry B. Plant's system of railroads. Surveying work to determine the route for the Charlotte Harbor Division was accomplished by Punta Gorda civil engineer Albert W. Gilchrist, who would later serve as Florida's 20th governor.

The Florida Southern's Charlotte Harbor Division was completed with its first train to its terminus in Punta Gorda (initially known as Trabue) on July 24, 1886.[2] Plant would go on to open a hotel in Punta Gorda in 1896.[3] This hotel, the Hotel Punta Gorda, would later be owned by Barron Collier (the namesake of nearby Collier County).[4]

Extension to Fort Myers

edit
 
Caloosahatchee River trestle. Bridge was built in 1904 with the bascule span replacing the original swing span in 1977.

Charlotte Harbor was Henry Plant's ultimate goal for his railroad system in Florida. Despite owning a hotel in Fort Myers, he had no interest in having the line continue beyond Punta Gorda.[5] Fort Myers was seeking railroad service at the time and had already been established as a city unlike Punta Gorda. After Plant's death in 1899, his heirs would sell his entire system of railroads to the Atlantic Coast Line Railroad (ACL) in 1902 and serving Fort Myers quickly became a top priority for ACL president Henry Walters. Construction commenced promptly on an extension to Fort Myers via Tice, which made it the ACL's first expansion of the former Plant System. The alignment through Tice was selected so the line would cross the wide Caloosahatchee River farther upstream at Beautiful Island, where a series of shorter trestles could be built.[2] The northernmost trestle originally had a steel swing span built by the American Bridge Company to accommodate river traffic. Service up to the Caloosahatchee River commenced in 1903. The first train reached Fort Myers on May 10, 1904, after the completion of the trestles over the river. Fort Myers would remain the southernmost point of the entire Atlantic Coast Line Railroad system until the Florida land boom of the 1920s.

Fort Myers Southern Branch

edit
 
Track in downtown Bonita Springs as seen in 2019

Once the land boom was underway, the ACL partnered with a number of local businessmen including advertising entrepreneur Barron Collier, who owned large amounts of land in the newly created Collier County. Through this partnership, they acquired the dormant charter of the unbuilt Fort Myers Southern Railroad (which was chartered in 1918 by the Fort Myers Southern Railroad Company) and used it to extend the line from Fort Myers further south into Collier County.[6] The Atlantic Coast Line would designate track south of Fort Myers as the Fort Myers Southern Branch, referencing the line's charter.[7] The line reached Bonita Springs by late 1925 where a depot was built just south of the Imperial River.[8]

The line was further extended to Naples by December 1926, where a depot was built on the east side of town. The original Naples depot was located on the northeast corner of Airport Road and Radio Road (near Naples Airport). A turning wye was built in Bonita Springs and for many years, trains terminating in Naples were turned around here and backed down to the original Naples depot since there was no wye there. The line was built on the east side of town because the Atlantic Coast Line's competitor, the Seaboard Air Line Railroad (SAL), was building a parallel line from Fort Ogden to Fort Myers and Naples via their Seaboard–All Florida Railway subsidiary. The SAL quietly managed to secure a more ideal right of way to downtown Naples. SAL's service to Naples commenced eleven days after the ACL, though SAL discontinued service to Naples by 1942.[2]

The line was extended one last time to Collier City on Marco Island in mid 1927. The line would remain the as the Atlantic Coast Line's southernmost track until 1928, when their parallel Haines City Branch was extended to Everglades City.[2]

By the end of 1927, the Atlantic Coast Line was running regular passenger train service to Naples.[9] Service to Marco Island was provided by a mixed train from Fort Myers and Naples. The Doxsee Clam Cannery was the railroad's main freight customer on Marco Island. A wye was also built on Marco Island.[2]

When the Seaboard Air Line discontinued service to Naples in 1942, the Atlantic Coast Line took advantage of an opportunity to serve downtown Naples. By 1944, the Atlantic Coast Line abandoned the Fort Myers Southern Branch from Marco Island to a point near Vanderbilt Beach. The ACL then extended the remaining line from Vanderbilt Beach down the ex-SAL right of way (along Goodlette-Frank Road) to Downtown Naples and relocated service to the SAL's Naples depot on Fifth Avenue South.[2] The original Naples depot on Airport Road was closed as a result and was later demolished in the 1970s.[10]

Later years

edit

The Atlantic Coast Line's Gulf Coast Special and West Coast Champion were notable passenger services to operate on the line from Bartow to Naples.[9] At this time, passenger trains were running the Bartow Branch north of Bartow to access the ACL's main line at Lake Alfred. By 1949, the Atlantic Coast Line operated a daily local passenger train and a daily freight train along the line from Bartow to Fort Myers. The ACL operated mixed train service from Fort Myers to Naples six days a week.[1]

In the 1950s–1960s, the ACL ran a daily passenger train between Lakeland and Naples via Fort Myers, with through cars from New York coming off the Tampa-bound section of the West Coast Champion at Lakeland.[11] In the Spring 1967 timetable, southbound train #291 left Lakeland at 3:05 pm, arriving at Punta Gorda 4:55 pm, Fort Myers at 5:40 pm, and Naples at 6:50 pm.

The Atlantic Coast Line became the Seaboard Coast Line Railroad (SCL) after merging with the Seaboard Air Line Railroad in 1967 (which ironically brought the Seaboard brand back to the Naples depot). The Seaboard Coast Line adopted the Seaboard Air Line's method of naming their lines as subdivisions which resulted in the full line from Lakeland to Naples being designated the Fort Myers Subdivision (a name which the Seaboard Air Line had previously used on their own line to Fort Myers which was abandoned in 1952).[12] The Bartow Branch was designated as the Bartow Subdivision. The SCL briefly continued to operate a daily passenger train and a local freight train six days a week between Lakeland and Naples.[13] However, intercity passenger service on the line was discontinued in 1971 upon the creation of Amtrak, who opted not to serve Southwest Florida.

In 1977, the swing bridge over the Caloosahatchee River in Tice was replaced by the current bascule bridge.[2][14]

In early 1980, the Seaboard Coast Line abandoned the southernmost 10 miles of the line from its terminus at the Naples depot to a point just north of Immokalee Road in North Naples. The abandoned right of way was sold to Collier County, who subsequently used it to widen and extend Goodlette-Frank Road. The area around the line's new terminus in North Naples was subsequently developed into the Rail Head Industrial Park.[15]

In 1980, the Seaboard Coast Line's parent company merged with the Chessie System, creating the CSX Corporation. The CSX Corporation initially operated the Chessie and Seaboard Systems separately until 1986, when they were merged into CSX Transportation. During the transition into CSX, the company sought to abandon many redundant routes and sell others to shortline railroads. As a result, the line was abandoned between Bowling Green and Arcadia in 1984.[16] The remaining track south of Arcadia, which was sold to the shortline Seminole Gulf Railway in 1987, is still connected to the rest of the CSX network via the former Charlotte Harbor and Northern Railway.

Current conditions

edit
 
Empty CSX phosphate train passing the Fort Meade Depot in 2019

Today, the former Lakeland—Fort Myers Line remains in three discontinuous sections.

At the north end, the line is still in service from Lakeland to Eaton Park. This segment is now CSX's CH Spur.[17]

From Homeland to Bowling Green, the line is still in service and it is now the southeastern end of CSX's Valrico Subdivision.[17] This segment of the line still carries large amounts of phosphate from The Mosaic Company's South Fort Meade mine.[18] Track from the entrance to the mine to Bowling Green (at a point just 100 yards north of the Bowling Green depot) is still in place but is out of service. Much of U.S. Route 17 has been widened into the former right of way between Bowling Green and Arcadia.[19]

 
Seminole Gulf Railway's Desoto Turn on the line near Punta Gorda

The most substantial segment of the line that still remains is from Arcadia to North Naples. This segment has been operated by Seminole Gulf Railway since 1987, which carries mixed freight to Southwest Florida. However, the southernmost 15 miles of the Seminole Gulf Railway from Alico Road (near San Carlos Park) to North Naples is inactive and has not had any active shippers since around 2008.[20] Seminole Gulf rebuilt most of the ACL-era trestles over the Caloosahatchee River in early 2024 after they were destroyed by Hurricane Ian in 2022.[21]

Further south, Goodlette-Frank Road runs along the post-1944 former right of way from Immokalee Road to Downtown Naples near the Naples depot.

Collier Boulevard (SR 951) runs along the original alignment of the line from its intersection with the Tamiami Trail to Marco Island.[22] Near Marco Island, a small sandbar named "Railroad Islet" and the "Railroad Shoals" mark the former location of the railroad's bridge to the island, which was located just east of the S.S. Jolley Bridge.[23][24]

Part of the Bartow Branch remains today from Winter Haven south to Gordonville (just northeast of Bartow). This segment is operated by the Florida Midland Railroad. The abandoned segment between Lake Alfred and Winter Haven is now the route of the Chain of Lakes Trail.[25]

Historic stations

edit
Lakeland to Collier City
Milepost City/Location Station[1] Image Connections and notes
AX 851.8 Lakeland Lakeland   junction with Main Line
AX 855.2 Eaton Park Eaton Park
AX 859.0 Highland City Highland City originally named Haskell
AX 864.0 Bartow Bartow   junction with:
AX 864.8 Oaks
AX 870.2 Homeland Homeland
AX 875.2 Fort Meade Fort Meade   junction with Bone Valley Branch
replaced original station in 1914
AX 882.7 Bowling Green Bowling Green   replaced original station in 1925
AX 889.3 Wauchula Wauchula   replaced original station in 1914
AX 893.4 Zolfo Springs Zolfo Springs originally Zolfo
AX 896.3 Moffitt
AX 903.8 Gardner
AX 907.1 Brownville
AX 913.2 Arcadia Arcadia   replaced original station in 1911
junction with:
AX 917.2 Nocatee
AX 922.2 Hull junction with Seaboard Air Line Railroad Fort Myers Subdivision
AX 923.9 Fort Ogden station destroyed by Hurricane Charley on August 13, 2004
AX 925.7 Southfort junction with Tampa Southern Railroad (ACL)
AX 933.5 Cleveland
AX 937.4 Punta Gorda Punta Gorda   originally named Trabue
AX 941.3 Acline
AX 949.3 Gilchrist junction with Seaboard Air Line Railroad Fort Myers Subdivision
AX 956.0 Slater
AX 958.2 North Fort Myers Bayshore originally named Samville
AX 961.2 Tice
AX 964.8 Fort Myers Fort Myers   located on a wye
replaced an earlier station on Monroe Street in 1924[26]
AX 979.6 Estero Estero
AX 987.4 Bonita Springs Bonita Springs
AX 1000.3 Naples Naples (original station) original station near Naples Airport. Abandoned in 1944 and service relocated to Seaboard depot. Station demolished in the 1970s.
AX 1001.2 Naples (Fifth Avenue South station)   original Seaboard Air Line Railroad depot on Fifth Avenue South from 1926 to 1942. Atlantic Coast Line took over the station and tracks in 1944.
Belle Meade
AX 1016.5 Marco Island Collier City
Bartow Branch
Milepost City/Location Station[1] Image Connections and notes
AW 835.6 Lake Alfred Lake Alfred   junction with Atlantic Coast Line Railroad Main Line
AW 839.1 Winter Haven Florence Villa
AW 842.0 Winter Haven junction with Seaboard Air Line Railroad Miami Subdivision
AW 844.0 Eagle Lake Eagle Lake
AW 848.0 Gordonville
AW 851.0 Bartow Bartow junction with:

See also

edit

References

edit
  1. ^ a b c d e Atlantic Coast Line Railroad Southern Division Timetable (1949)
  2. ^ a b c d e f g h Turner, Gregg M. (December 1, 1999). Railroads of Southwest Florida. Images of America. Arcadia Publishing.
  3. ^ "Current Exhibits". Henry B. Plant Museum. Retrieved 16 July 2020.
  4. ^ "Hotel Punta Gorda". Charlotte County, Florida. Retrieved 16 July 2020.
  5. ^ "Current Exhibits". Henry B. Plant Museum. Retrieved July 16, 2020.
  6. ^ "Interstate Commerce Commission Reports: Reports and Decisions of the Interstate Commerce Commission of the United States, Volume 79". 1924. Retrieved 25 July 2020.
  7. ^ United States House of Representatives Hearing before the Committee on Interstate and Foreign Commerce (January 3-5, 1933)
  8. ^ Cottrill, Cathy. "Remember: Local historian shares details about railroad depot once located in Bonita". Naples Daily News. Retrieved January 24, 2017.
  9. ^ a b Robinson, D.C. (11 September 2017). ACL, SAL and Southern: Passenger Timetables. Retrieved 15 July 2020.
  10. ^ "Naples Stations Depots". Bone Valley Modeler. Archived from the original on 11 May 2019. Retrieved 4 August 2020.
  11. ^ "Atlantic Coast Line Railroad timetable". April 30 – June 22, 1967: pp. 4 and 15.
  12. ^ Seaboard Air Line Railroad South Florida Division Timetable (1940)
  13. ^ Seaboard Coast Line Railroad Tampa Division Timetable (1970)
  14. ^ "SGLR - Caloosahatchee River Bridge". BridgeHunter. Retrieved 7 September 2021.
  15. ^ Pitt, Dave (16 March 1980). "Railroad Gets OK To Abandoned Most Most Tracks In County". Naples Daily News. p. 3. Retrieved 15 October 2024 – via Newspapers.com.  
  16. ^ Mulligan, Michael (2008). Railroad Depots of Central Florida. Arcadia Publishing. ISBN 9780738553900. Retrieved 20 June 2020.
  17. ^ a b CSX Jacksonville Division Timetable
  18. ^ "Phosphate Production Locations". The Mosaic Company. Archived from the original on September 26, 2020. Retrieved October 20, 2020.
  19. ^ "Abandoned Railroad Rights-of-way". Google. Retrieved October 4, 2018.
  20. ^ Howard, Alex (22 November 2019). "City of Bonita Springs strikes deal to keep old rail bridge clean of graffiti". WBBH-TV. Archived from the original on 27 November 2019. Retrieved 8 April 2020.
  21. ^ Romero, Samantha (22 February 2024). "Fort Myers reconnects with national rail system as Seminole Gulf Railway completes test run". NBC-2 News. Retrieved 6 March 2024.
  22. ^ Woodward, Craig. "Hiking with Henry Lowe: Part Two North of the Isles of Capri". Coastal Breeze News. Archived from the original on 23 May 2015. Retrieved 6 May 2015.
  23. ^ Railroad Islet on Google Maps
  24. ^ Railroad Shoals on Google Maps
  25. ^ "Construction Begins on Chain of Lakes Trail Pedestrian Bridge". The Ledger. Retrieved 30 March 2017.
  26. ^ Reaves, Gerri (6 March 2020). "Rail Transport On Monroe" (PDF). Island Sun. Retrieved 25 October 2022.