Line 15 (Shenzhen Metro)

Line 15 of the Shenzhen Metro is a Phase V expansion metro line under construction, which will connect the districts of Bao'an, Nanshan and Qianhai for 32.2 kilometers and 24 stations.[1][2][3] Construction started on 28 June 2023,[4] and the line is expected to open in December 2028. The line is proposed to use 4 car and 6 car type A trains.[5]

Line 15
Overview
StatusUnder construction
LocaleShenzhen, Guangdong
TerminiLoop line
Stations24
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
History
Planned openingDecember 2028; 4 years' time (2028-12)
Technical
Line length32.2 kilometres (20.0 mi)
CharacterUnderground
Operating speed80km/h

Stations

edit
Station name Connections Location
English Chinese
— ↑ Loop line towards Tinghai Road ↑ —
Qianbao 前保 Nanshan
Tonggang Road 通港路
Railway Park 铁路公园 5
Moon Bay Park 月亮湾公园
Sihai 四海 12
Dongbin Road 东滨路
Minghai 名海
Shenzhen University South 深大南 9
Shenzhen University North 深大北
Yuquan Road 玉泉路
Langshan Road 朗山路
Xili High Speed Railway Station 西丽高铁站  13   27   29 
  ELQ
Dashi Hill 打石山
Tongleguan 同乐关
Honglang North 洪浪北 5 Bao'an
Bao'an Park 宝安公园
Liutang 流塘 12
Xixiang Park 西乡公园  20 
Pingzhou 坪洲 1
Haicheng 海城
Chanwan North 铲湾北
Chanwan Central 铲湾中
Chanwan South 铲湾南
Tinghai Road 听海路 Nanshan
— ↓ Loop line towards Qianbao ↓ —

References

edit
  1. ^ 多条地铁规划涉及宝安!深圳市城市轨道交通第五期建设规划公示. www.sznews.com. 2022-08-27.
  2. ^ 深圳地铁五期规划建设13条线路 年底运营里程将破500公里. new.qq.com. 2022-09-07.
  3. ^ 深圳地铁15号线、17号线、20号线二期相关进展!. view.inews.qq.com. 2022-06-17.
  4. ^ 新增13条地铁!深圳轨道交通第五期规划环评首次公示,速看. mp.weixin.qq.com. 2022-08-28.
  5. ^ 地铁五期13条线路规划公布. www.sz.gov.cn. 2022-09-07.