The Line 1 of Hefei Metro (Chinese: 合肥轨道交通一号线; pinyin: Héféi Guǐdào Jiāotōng Yī Hào Xiàn) is an underground metro line in Hefei. The line began operation on 26 December 2016.[1][2]
Line 1 | |
---|---|
1 | |
Overview | |
Status | In operation |
Owner | Government of Hefei |
Locale | Hefei, China |
Termini | |
Stations | 23 |
Service | |
Type | Rapid transit |
System | Hefei Metro |
Services | 1 |
Operator(s) | Hefei Urban Mass Transit Corporation |
Rolling stock | CRRC Nanjing Puzhen Metro cars |
History | |
Opened | 26 December 2016 |
Technical | |
Line length | 24.6 km (15.29 mi) |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Opening timeline
editSegment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Hefei Railway Station — Jiulianwei | 26 December 2016 | 24.6 km (15.3 mi) | 23 | Phase 1 & 2 |
Hefei Railway Station — Zhangwa | 1 July 2023[3] | 4.54 km (2.8 mi)[4] | 3 | Phase 3[4] |
Train service
editThere are 2 types of train services offered on the metro line 1:
- Zhangwa — Jiulianwei
- Zhangwa ← Hefei South Railway Station (only on the last northbound train everyday)[5]
Map
edit
Stations
editService routes |
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
● | ↑ | Zhangwa | 张洼 | 0.00 | 0.00 | Yaohai | |
● | ↑ | Xinghuayuan | 兴华苑 | ||||
● | ↑ | Yaohai Gongyuan | 瑶海公园 | ||||
● | ↑ | Hefei Railway Station | 合肥火车站 | HFH 3 |
0.00 | 0.00 | |
● | ↑ | Changhuai | 长淮 | 0.60 | 0.60 | ||
● | ↑ | Mingguanglu | 明光路 | 0.75 | 1.35 | ||
● | ↑ | Dadongmen | 大东门 | 2 | 0.85 | 2.20 | |
● | ↑ | Baogongyuan | 包公园 | 1.00 | 3.20 | Baohe | |
● | ↑ | Hefei University of Technology South Campus | 合工大南区 | 1.05 | 4.25 | ||
● | ↑ | Zhugang | 朱岗 | 6 | 1.70 | 5.95 | |
● | ↑ | Qiupuhelu | 秋浦河路 | 0.95 | 6.90 | ||
● | ↑ | Gedadian | 葛大店 | 1.05 | 7.95 | ||
● | ↑ | Wanghucheng | 望湖城 | 1.45 | 9.40 | ||
● | ↑ | Hefei South Railway Station | 合肥南站 | ENH 4 5 |
0.90 | 10.30 | |
● | South Railway South Square | 南站南广场 | 0.70 | 11.00 | |||
● | Luogang | 骆岗 | 1.05 | 12.50 | |||
● | Gaowang | 高王 | 1.15 | 13.65 | |||
● | Binhu Int'l Convention Center | 滨湖会展中心 | 1.35 | 15.00 | |||
● | Zilu | 紫庐 | 7 | 1.50 | 16.50 | ||
● | Tangxihegongyuan | 塘西河公园 | 1.05 | 17.55 | |||
● | Jindougongyuan | 金斗公园 | 0.95 | 18.50 | |||
● | Yungulu | 云谷路 | 5 | 1.10 | 19.60 | ||
● | Wanda City | 万达城 | 0.85 | 20.45 | |||
● | Wannianbu | 万年埠 | 0.70 | 21.15 | |||
● | Bingzipu | 丙子铺 | 1.10 | 22.25 | |||
● | Jiulianwei | 九联圩 | 1.05 | 23.30 | |||
References
edit- ^ "翼猫科技强势入驻合肥地铁,翼猫号承载梦想,地铁随行" (in Chinese). China News. Retrieved 19 January 2017.
- ^ "安徽移动实现省内首条地铁网络全覆盖" (in Chinese). Xinhua. Archived from the original on January 31, 2017. Retrieved 19 January 2017.
- ^ "合肥地铁1号线三期7月1日开通运营". CNR. 2023-06-29. Retrieved 2023-06-29.
- ^ a b "地铁1号线三期上线"试跑"". 2023-03-21.
1号线三期工程是既有运营1号线的北延段,正线全长4.54公里,均为地下线
- ^ "轨道交通1号线合肥南站往合肥火车站方向加开1列次载客列车". hfgdjt.com. Retrieved 8 March 2018.