Line 1 (Tianjin Metro)

Line 1 of the Tianjin Metro (Chinese: 天津地铁一号线; pinyin: Tiānjīn Dìtiě Yī Hào Xiàn) runs from the north-west to the south-east of downtown Tianjin. It is 42.227 km (26.2 mi) in length with 32 stations (currently 27 stations in operation).

Line 1
A train at Caijingdaxue station
Overview
StatusOperational
OwnerTianjin City Infrastructure Construction and Investment Group Ltd.
LocaleTianjin, China
Termini
Stations32 (27 in operation)
Service
TypeRapid transit
SystemTianjin Metro
Services1
Operator(s)Tianjin Line 1 Rail Transit Operation Co., Ltd.
History
Opened28 December 1984; 39 years ago (1984-12-28) (old system)
12 June 2006; 18 years ago (2006-06-12) (new system)
Closed2001 to 2006
Technical
Line length42.227 km (26.2 mi)
Number of tracks2
CharacterUnderground, At-grade, & Elevated
Track gauge1,435 mm (4 ft 8+12 in)
Route map

English
双桥河
Shuangqiaohe
咸水沽北
Xianshuigubei
东沽路
Donggulu
国瑞路
Guoruilu
国家会展中心
Guojiahuizhanzhongxin
上郭庄
Shangguozhuang
高庄子
Gaozhuangzi
洪泥河东
Hongnihedong
梨双路北
Lishuanglube
李楼
Lilou
双林
Shuanglin
财经大学
Caijingdaxue
(
Economics &
Finance College
)
华山里
Huashanli
(Tianjin Metro Line 11)
复兴门
Fuxingmen
陈塘庄
Chentangzhuang
土城
Tucheng
(Tianjin Metro Line 8)
南楼
Nanlou
下瓦房
Xiawafang
Tianjin Metro Line 5
小白楼
Xiaobailou
营口道
Yingkoudao
(Yingkou Road)
Tianjin Metro Line 3
鞍山道
Anshandao
(Anshan Road)
海光寺
Haiguangsi
(Haiguang Temple)
(Tianjin Metro Line 7)
二纬路
Erweilu
(Erwei Road)
西南角
Xi'nanjiao
Tianjin Metro Line 2
西北角
Xibeijiao
西站
Xizhan
洪湖里
Honghuli
勤俭道
Qinjiandao
(Qinjian Road)
本溪路
Benxilu
(Benxi Road)
佳园里
Jiayuanli
瑞景新苑
Ruijingxinyuan
刘园
Liuyuan

The line started operations on 12 June 2006. It was rebuilt from the original Tianjin Metro line, which opened in 1976, but had to close down and undergo renovations in 2001 as part of the system's modernizing project. The line's color is red.

History

edit

Construction began in 1970. The first section, spanning 3.6 km of track and 4 stations, which are named Xinhualu, Yingkoudao, Anshandao and Haiguangsi stations, was completed by February 1976. The second section, with an additional 1.6 km of track and the Xi'nanjiao and Erweilu stations, was completed by 1980. After construction resumed, the total length was 7.4 km, with 8 stations, and service on the line began on 28 December 1984.[citation needed]

To cut construction costs, the authority used an abandoned canal bed to build part of the system. Thus the underground section is only 2–3 meters beneath the street surface, and was the world's shallowest metro. Years later, train frequency reduced and trains were commonly delayed. The rolling stock had become dilapidated, with most seat covers torn off, and lights becoming dim. To change to a more modern and cleaner system, a modernization plan was laid out in 2000. In preparation, the system was closed on 1 September 2001, with renovation starting on 21 November after being delayed due to the terrorist attacks of 11 September. After introducing new rolling stock, adding half-height platform screen doors and extending the line to Shuanglin, the line was completed at the end of 2005 and re-opened on 12 June 2006.[citation needed]

In 2008, Xizhan station was temporarily closed for the reconstruction of Tianjin West railway station. It reopened on 1 July 2011.[citation needed]

In 2016, the at-grade Shuanglin station was closed. On 3 December 2018, Shuanglin station was reopened as a new underground station.[citation needed]

On 3 December 2018, Line 1 also extended by one station, from Shuanglin station to Lilou station.[citation needed]

On 28 December 2019, four stations on the eastern extension (Gaozhuangzi, Beiyangcun, Guozhanlu, Donggulu) were opened.[1]

On 12 May 2021, Beiyangcun station was renamed to Guojiahuizhanzhongxin station, and Guozhanlu station was renamed to Guoruilu station.[2]

Hongnihedong station opened on 31 July 2023.[3]

A two-station extension from Donggulu station to the new terminus at Shuangqiaohe station, with a not yet opened station at Xianshuigubei, opened on 1 July 2024.[4]

The signal system was also replaced by the new ATO system, and the running stock was also overhauled.

Details

edit
  • Coaches per train - 6.
  • Frequency - 3-4 minutes in peak hours & 8 minutes at other times.
  • Operating hours - 5:30 to 22:30.

Infrastructure

edit

Alignment and interchanges

edit

The line is underground between Qinjiandao and Tucheng stations, as well as Shuanglin and Lilou. The other nine stations are elevated. All elevated stations are entirely covered by a mixture of transparent & opaque corrugated sheets. The line passes through six districts, namely Beichen, Hongqiao, Nankai, Heping, Hexi and Jinnan. The whole journey takes about 50 minutes. The line is interchange with other metro lines: Lines 2, 3, 5 and 6. And interchanges to future lines will be available with Lines 4, 7, 8 and 10.

Concourse Level

edit

All line 1 station concourses are equipped with a customer service center, ticket vending machines, automatic fare gates, and bank ATMs.

Platform level

edit

For security and other reasons, all line 1 stations have platform-edge doors installed. TVs are installed that display travel tips, advertising, alerts, and waiting time for the next train.

Opening timeline

edit
Segment Commencement Length
Xinhualu — Xi'nanjiao 10 August 1980 5.2 km (3.2 mi)
Xi'nanjiao — Xizhan 28 December 1984 2.2 km (1.4 mi)
Xinhualu 9 October 2001 Permanently ceased operation
Xiaobailou — Xizhan 9 October 2001 Temporary ceased operation
Shuanglin — Xiaobailou 12 June 2006 10.6 km (6.6 mi)
Xiaobailou — Xizhan Reentered operation
Xizhan — Liuyuan 8.2 km (5.1 mi)
Shuanglin (old at-grade station) 28 December 2016 Old at-grade station closed
Shuanglin (new underground station) 3 December 2018 New underground station opened
Shuanglin — Lilou 3 December 2018 16.039 km (10.0 mi)
until the depot at Shuangqiaohe[1]
Lilou — Donggulu[1] 28 December 2019[1]
Donggulu — Shuanglin 9 January 2022 Temporary ceased operation due to COVID-19 pandemic
Shuanglin — Caijingdaxue 11 January 2022
Donggulu — Caijingdaxue
(except Lilou)
27 January 2022 service resumed
Lilou 30 January 2022
Hongnihedong 31 July 2023[3] Infill station
Donggulu — Shuangqiaohe 1 July 2024[4]

Stations (southeast to northwest)

edit
Service
route
Station name Connections Bus Connections Distance
km
Location
English Chinese
Shuangqiaohe 双桥河 Jinnan
Xianshuigubei 咸水沽北
Donggulu 东沽路 204 212西线 217 219 224 226东线 226西线
Guoruilu[2] 国瑞路 202 204 212西线 214 217 219 224 226东线 226西线 228 309 国展定制1线 国展定制2线 国展定制3线 国展定制4线
Guojiahuizhanzhongxin[2] 国家会展中心 202 214 228 309
Shangguozhuang 上郭庄
Gaozhuangzi 高庄子 202 214 214区间
Hongnihedong 洪泥河东
Lishuanglubei 梨双路北
Lilou 李楼 216 220 342 374 629 652北线 652北线区间 652快线 655 808 855
Shuanglin 双林 93 215 662 0.00 0.00
Caijingdaxue 财经大学   93 336 342 374 605 665 676 686 706 846 846区间 859 通勤665 1.61 1.61 Hexi
Huashanli 华山里   (OSI via Dongjiangdao) 304 326北环 326南环 613 623 631 锦堂菜市场免费班车5号线 1.48 3.09
Fuxingmen 复兴门 95 97 216 220 321 529 623 631 655 656 686 693 808 846 846区间 855 859 通勤220 通学6 1.33 4.42
Chentangzhuang 陈塘庄 93 95 97 529 629 631 652北线 652北线区间 676 693 808 835 855 859 观光1 通学6 1.23 5.65
Tucheng 土城 20 95 96 96区间 158 186 186快线 529 631 652北线区间 652快线 659 659区间 676 682 688 693 697 808 835 855 858 859 908 954 观光1 通学6 1.59 7.24
Nanlou 南楼 20 631 659 659区间 665 668 685 697 858 867 868 963 通勤665 1.10 8.34
Xiawafang 下瓦房   3 20 175 186 369 511 608 631 641 652快线 659 659区间 665 668 685 688 760 846 860 867 868 962 963 通勤665 专线678 1.05 9.39
Xiaobailou 小白楼   (OSI via Xuzhoudao) 3 20 97 503 604 629 631 632 641 652北线 657 659 685 693 830 846 867 904 953 962 佛罗伦萨小镇免费班车1号线 津游1线 专线678 1.45 10.84 Heping
Xinhualu (Permanently Closed) 新华路 0.71 11.55
Yingkoudao 营口道   3 45 50 503 600内环 600外环 631 632 641 643 657 659 669 673 800 840 842 847 851 865 867 870 901 906 954 金街观光车 津游1线 通勤842 专线678 0.80 12.35
Anshandao 鞍山道 3 8 45 50 600内环 600外环 606 631 632 641 643 657 659 669 673 800 840 842 847 851 865 867 870 878 901 906 908 954 观光2 通勤842 专线678 0.87 13.22
Haiguangsi 海光寺 3 12 156 161 168 169 180 180独流区间 184 184区间 193 503 588 600内外环 600外环 606 609 628 631 632 633 638 641 646 657 658 659 669 673 675 681 800 829 832 840 855 858 865 867 870 878 906 908 952 954 观光2 通勤3 通勤832 0.93 14.15 Nankai
Erweilu 二纬路 12 600内环 600外环 631 639西线 640 669 673 800 841 849 863 905 906 952 961 1.06 15.21
Xi'nanjiao 西南角   191 628 645 645区间 669 673 676 837 849 860 863 903 通勤3 0.78 15.99
Xibeijiao 西北角 12 24 52 192 461 469 516市区线 588 600内环 600外环 628 631 634 639西线 672 687 800 836 837 852 856 861 863 865 903 906 907 952 962 观光3 1.02 17.01 Hongqiao
Xizhan 西站     TXP 10 15 24 31 52 153 158 161 168 169 461 469 503 588 601 635 651 652北线 652快线 661 687 688 746 810 829 840 910 公墓定制专线6 通勤651 1.23 18.24
Honghuli 洪湖里 367 622 810 860 869 879 952 1.66 19.90
Qinjiandao 勤俭道 47 47区间 48 48区间 606 658 952 962 1.15 21.05
Benxilu 本溪路 34 34小圈 37 345 351 602 606 634 700 725 725区间 732 962 通勤850 1.45 22.50
Jiayuanli 佳园里 34 34小圈 37 351 602 606 634 649 700 725 725区间 732 865 962 快速2 通勤725 通勤快速2 1.24 23.74 Beichen
Ruijingxinyuan 瑞景新苑 34 34小圈 602 649 700 725 725区间 732 962 快速2 通勤649 通勤725 1.06 24.80
Liuyuan 刘园 34 34小圈 174 317 318 332 602 634 649 725 725区间 734 735 742 743 745 752 766 770 909 通勤332 通勤649 通勤725 通勤732 通勤快速2 1.00 25.80

Rolling Stock

edit
Type Time of manufacturing Series Sets Assembly Notes
Type B 2005 - 2006 DKZ9 (Replaced) 25 Tc+M+T+M+M+Tc Manufactured by CNR Changchun Railway Vehicles
Type B 2016 Unknown 25 Tc+M+T+M+M+Tc Manufactured by CRRC

References

edit
  1. ^ a b c d "天津地铁1号线东延线新开4站 28日开通运营". 26 December 2019. 高庄子、北洋村、国展路、东沽路4座车站将于28日开通运营 (Gaozhuangzi, Beiyangcun, Guozhanlu, Donggulu will open on December 28.) 1号线东延线全长16.039公里 (The total length of the eastern extension of Line 1 is 16.039 km.)
  2. ^ a b c "注意啦!天津地铁1号线东延线北洋村站、国展路站站名调整". 10 May 2021. Archived from the original on 10 May 2021. 2021年5月12日起,天津地铁1号线东延线"北洋村站"更名为"国家会展中心站","国展路站"更名为"国瑞路站" (Since May 12, 2021, Tianjin Metro Line 1 "Beiyangcun station" renamed to "Guojiahuizhanzhongxin station", "Guozhanlu station" renamed to "Guoruilu station")
  3. ^ a b "运营通告 | 7月31日,天津地铁1号线洪泥河东站正式开通运营". 27 July 2023.
  4. ^ a b "天津地铁1号线双桥河站将于7月1日正式开通运营". 北方网. 29 June 2024. Retrieved 29 June 2024.