Line 2 of the Xiamen Metro is a subway line in Xiamen. The line running from Wuyuanwan to Tianzhushan, has 32 stations and is 41.64 kilometres (25.87 mi) long.[2] It was opened on December 25, 2019.[1]
Line 2 | |||
---|---|---|---|
Overview | |||
Status | In operation | ||
Locale | Xiamen, Fujian, China | ||
Termini | |||
Stations | 32 (30 in operation) | ||
Service | |||
Type | Rapid transit | ||
System | Xiamen Metro | ||
History | |||
Opened | 25 December 2019[1] | ||
Technical | |||
Line length | 41.64 km (25.87 mi)[2] | ||
Number of tracks | 2 | ||
Character | Underground | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
Operating speed | 80 km/h (50 mph) | ||
|
Opening timeline
editSegment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Wuyuanwan — Tianzhushan | 25 December 2019[1] | 41.64 km (25.87 mi)[2] | 29 | Phase 1 & 2 |
Dongyao | 26 April 2021[3] | Infill station | 1 |
Map
edit
Stations
editStation name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Tianzhushan | 天竺山 | Haicang | ||||
Dongfu | 东孚 | |||||
Dongyao | 东瑶 | |||||
Dingmei | 鼎美 | 6 | ||||
Maluan Center | 马銮中心 | 6 | ||||
Xinyang Avenue | 新阳大道 | |||||
Xin'an | 新垵 | |||||
Wengjiao Road | 翁角路 | |||||
Maqing Road | 马青路 | |||||
Haicang Administrative Center | 海沧行政中心 | |||||
Haicang Business Center | 海沧商务中心 | |||||
Haicang Bay Park | 海沧湾公园 | |||||
Cruise Center | 邮轮中心 | Huli | ||||
Jianye Road | 建业路 | Siming | ||||
Hubin Middle Road | 湖滨中路 | |||||
Sports Center | 体育中心 | 3 | ||||
Yuxiu East Road | 育秀东路 | |||||
Lücuo | 吕厝 | 1 | ||||
Jiangtou | 江头 | |||||
Houpu | 后埔 | |||||
Caitang | 蔡塘 | Xiamen BRT | ||||
Gudishi | 古地石 | |||||
Lingdou | 岭兜 | |||||
Software Park Phase II | 软件园二期 | |||||
Hecuo | 何厝 | |||||
Guanyinshan | 观音山 | |||||
Dongzhai | 东宅 | Huli | ||||
Cross-Strait Financial Center | 两岸金融中心 | |||||
Wutong | 五通 | |||||
Wetland Park | 湿地公园 | |||||
Zhongzhai | 钟宅 | |||||
Wuyuanwan | 五缘湾 | 3 | ||||
Construction mishap
editIn mid-December 2019, construction works near the Siming District were affected by subsidence. A major water pipe burst, and dirty water flooded the construction site, affecting the concourse, platform and metro lines under construction. The subsidence also caused a collapse of the surface road and a resulting crater of approximately 500 square metres (5,400 sq ft). The cause is believed to be a burst water pipe. Water also penetrated the now-opened Lücuo station of Line 1, and flooded the concourse and platform.[4]
References
edit- ^ a b c "Xiàmén dìtiě 2 hào xiàn kāitōng yùnyíng shíjiān qǐdiǎn zhōngdiǎn lùxiàn zhàndiǎn tú wánzhěng bǎn" 厦门地铁2号线开通运营时间 起点终点路线站点图完整版. Mǐnnán wǎng 闽南网 (in Chinese). 2019-12-20. Archived from the original on 2019-12-20. Retrieved 2019-12-20.
- ^ a b c "Xiàmén dìtiě 2 hào xiàn quánxiàn "guǐ tōng"! Yùjì niándǐ qián kāitōng shì yùnyíng" 厦门地铁2号线全线"轨通"!预计年底前开通试运营. news.xmnn.cn (in Chinese). 2019-05-13.
- ^ "Xiàmén dìtiě 2 hào xiàn dōng yáo zhàn míng qǐ tóurù yùnyíng" 厦门地铁2号线东瑶站明起投入运营 [Xiamen Metro Line 2 Dongyao Station Will Be Put Into Operation Tomorrow]. fj.xinhuanet.com (in Chinese). 2021-04-25. Archived from the original on 2021-04-26. Retrieved 2021-04-26.
- ^ "2 Zhōu qián cáiguò yànshōu! Xiàmén dìtiě tū tāntā yuè tái chéng wāngyáng" 2週前才過驗收! 廈門地鐵突坍塌 月台成汪洋. news.ltn.com.tw (in Chinese). 2019-12-13. Archived from the original on 2019-12-13. Retrieved 2019-12-17.