Line 5 of the Nanning Metro is a rapid transit line in Nanning which opened on 16 December 2021. The line is 20.2 km long with 17 stations and uses driverless 6-car Type B trains.[1][2][3]
Line 5 | |
---|---|
5 | |
Overview | |
Status | Operational |
Owner | Nanning |
Locale | Nanning, Guangxi, China |
Termini | |
Stations | 17 |
Service | |
Type | Rapid transit |
System | Nanning Metro |
Services | 1 |
Operator(s) | Nanning Rail Transit Corporation |
Rolling stock | 6-car Type B |
History | |
Opened | December 16, 2021 |
Technical | |
Line length | 20.2 km (12.55 mi) |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Opening timeline
editSegment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Guokai Dadao — Jinqiao Coach Station | 16 December 2021 | 20.2 km (12.55 mi) | 17 | Phase 1 |
Stations
editStation name | Transfer | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | Zhuang | ||||
Guokai Dadao | 国凯大道 | Daihloh Gozgaij | 0 | 0 | Jiangnan | |
Nahong Overpass | 那洪立交 | Nazhungz Lizgyauh | 4 | |||
Jinkai Lu | 金凯路 | Roen Ginhgaij | ||||
Jiangnan Park | 江南公园 | Gyanghnanz Gunghyenz | ||||
Zhoujiapo | 周家坡 | Couhgyahboh | ||||
Wuyi Overpass | 五一立交 | Vujyiz Lizgyauh | ||||
Xinxiu Park | 新秀公园 | Sinhsiu Gunghyenz | Xixiangtang | |||
Guangxi University | 广西大学 | Gvangjsih Dayoz | 1 | |||
Xiuling Lu | 秀灵路 | Roen Siulingz | ||||
Mingxiu Lu | 明秀路 | Roen Mingzsiu | 2 | |||
Beihu Nanlu | 北湖南路 | Roen Namz Bwzhuz | ||||
Huqiu | 虎邱 | Hujgiuh | Xingning | |||
Shishan Park | 狮山公园 | Swhsanh Gunghyenz | ||||
Xiaojicun | 小鸡村 | Siujgihcunh | 3 | |||
Yongbin Overpass | 邕宾立交 | Yunghbinh Lizgyauh | ||||
Jiangqiao | 降桥 | Gyanggyauz | ||||
Jinqiao Coach Station | 金桥客运站 | Camh Yinhhek Ginhgyauz | ||||
References
edit- ^ "Nanning opens driverless Line 5". Metro Report International. 2021-12-23. Retrieved 2022-03-29.
- ^ "1st automatic metro line on run in Nanning". gxzf.gov.cn. 2021-12-24. Retrieved 2022-03-29.
- ^ "Initial operation of Nanning Metro Line 5 enters into stage of no-load test run". nanning.gov.cn. 2021-08-20. Retrieved 2022-03-29.