Line 6 (Suzhou Rail Transit)

Line 6 of Suzhou Rail Transit is a line under construction. Running north-west to south-east, it will connect Suzhou New District, Suzhou's city center of Gusu District and Suzhou Industrial Park. The line 6, except Huayun station, started operation in 29 June 2024.[2]

Line 6
A train of Suzhou Rail Transit Line 6
Overview
StatusUnder construction
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations31
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
History
Opened29 June 2024; 4 days ago (2024-06-29)
Technical
Line length36.12 kilometres (22.44 mi)
Track length79.2m
Number of tracks2
CharacterUnderground[1]
Track gauge1,435 mm (4 ft 8+12 in)
Electrificationoverhead wire

Stations

edit
Station name[3] Connections Distance
km
Location
English Chinese
Suzhou Xinqu Railway Station 苏州新区火车站  3 
  ITH
  Tram line 2
0.00 0.00 New District
Baofeng 保丰
Fuqiang 富强 Gusu
Changjing 长泾
Baiyangwangongyuan 白洋湾公园  8 
Jinjidun 金鸡墩
Huqiu 虎丘
Qingshanqiaobang 清山桥浜
Jiangxingqiao South 江星桥南
Sujin 苏锦  4 
Pinghe Lu 平河路  2 
Meixiang 梅巷
Humble Administrator's Garden Suzhou Museum 拙政园苏博
Xuanqiaoxiang 悬桥巷
Lindun Lu 临顿路  1 
Wangxingqiao Soochow University 望星桥苏大
Xujiabang 徐家浜 SIP
Reyunqiao 惹云桥  7 
Qiutangbang 秋塘浜
Ligongdi West 李公堤西  3 
Qiongjidun 琼姬墩  8 
Nanshigongyuan South 南施公园南
Suzhou Olympic Sports Centre 苏州奥体中心  5 
Children's Hospital 儿童医院总院
Hanqingqiao 涵青桥
Jinjiayan 金家堰
Beixiebu 北斜步
Nanxiebu 南斜步
Jinshang Lu 金尚路  2 
Sangtiandao 桑田岛  2 
Huayun 华云

References

edit
  1. ^ "国家发展改革委关于苏州市城市轨道交通第三期 建设规划(2018~2023年)的批复". Retrieved 28 September 2018.
  2. ^ "苏州轨道交通6号线、S1线开工,2024年将建成9条线". news.sina.com.cn. Archived from the original on 2019-06-09. Retrieved 2018-11-27.
  3. ^ "官宣!苏州轨道交通6、7、8号线车站站名定了". 2024-01-24.