Line S7 of the Nanjing Metro (Chinese: 南京地铁S7号线; pinyin: Nánjīng Dìtiě S-Qī Hào Xiàn) is a north–south suburban rapid transit line primarily serving Nanjing's Lishui District, running from Konggangxinchengjiangning to Wuxiangshan, and was opened on 26 May 2018.[4] The line is served by 4 car Class B trains with a maximum speed of 100 km/h (62 mph). The line is designed to allow for 6 cars trains to accommodate long term growth.[5]
Line S7 | |
---|---|
S7 | |
Overview | |
Other name(s) | Lishui line[1] Nanjing–Lishui intercity railway[2] Ningli intercity railway[3][a] |
Status | In operation |
Locale | Jiangning and Lishui districts Nanjing, Jiangsu |
Termini | |
Stations | 9 |
Service | |
Type | Rapid transit |
Operator(s) | Nanjing Metro |
History | |
Opened | 26 May 2018 |
Technical | |
Line length | 28.869 km (17.9 mi) |
Number of tracks | 2 |
Character | Underground and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Opening timeline
editSegment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Konggangxinchengjiangning — Wuxiangshan | 26 May 2018 | 28.869 km (17.94 mi) | 9 | Ningli ICR Phase 2 |
Nanjing South — Konggangxinchengjiangning | 26 May 2018 | see Line S1 | (through services) |
Station list
editService routes |
Station name | Connections | Distance km |
Location | |||||
---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||
● | Nanjing South Railway Station | 南京南站 | 1 3 S3 NKH | see Line S1 |
Yuhuatai / Jiangning | ||||
| | Cuipingshan | 翠屏山 | Jiangning | ||||||
| | HHU / Fochengxilu | 河海大学·佛城西路 | |||||||
| | Jiyindadao | 吉印大道 | 5 | ||||||
| | Zhengfangzhonglu | 正方中路 | |||||||
| | Xiangyulubei | 翔宇路北 | |||||||
● | Xiangyulunan | 翔宇路南 | S9 | ||||||
● | Lukou International Airport | 禄口机场 | NKG | ||||||
● | ● | | | Konggangxinchengjiangning | 空港新城江宁 | 0.000 | 0.000 | Jiangning | ||
● | | | | | Zhetang | 柘塘 | 5.701 | 5.701 | Lishui | ||
● | | | | | Konggangxinchenglishui | 空港新城溧水 | 5.623 | 11.324 | |||
● | | | | | Qunli | 群力 | 3.301 | 14.625 | |||
● | | | | | Wolonghu | 卧龙湖 | 5.938 | 20.563 | |||
● | ● | ● | Lishui | 溧水 | 2.595 | 23.158 | |||
● | ● | ● | Zhongshanhu | 中山湖 | 1.630 | 24.788 | |||
● | ● | ● | Xingzhuang | 幸庄 | 2.617 | 27.405 | |||
● | ● | ● | Wuxiangshan | 无想山 | 1.464 | 28.869 |
Notes
editReferences
edit- ^ simplified Chinese: 溧水线; traditional Chinese: 溧水線; pinyin: Lìshuǐ Xiàn
- ^ 南京到溧水城际轨道交通; 南京到溧水城際軌道交通; Nánjīng dào Lìshuǐ Chéngjì Guǐdào Jiāotōng
- ^ 宁溧城际轨道交通; 寧溧城際軌道交通; Níng-Lì Chéngjì Guǐdào Jiāotōng
- ^ 南京地铁S7号线信号、通信等工程预验收顺利完成. 中国江苏网 (in Chinese). 9 February 2018.
- ^ "南京地铁S7号线26日开通试运营 单趟运营时间约30分钟_ 龙虎网". news.longhoo.net. Retrieved 10 May 2020.