List of proposed power stations in Australia

This is a list of proposed power stations in the Commonwealth of Australia. Australia currently has 11 proposed fossil power plants, 42 proposed renewable plants, and eight others.

Fossil fuelled

edit
State Project name Sponsoring company Coordinates Capacity in MW Status Notes
SA Kingston[1] Hybrid Energy 36°48′S 139°48′E / 36.8°S 139.8°E / -36.8; 139.8 (Check) 300 Cancelled[2] Brown coal
SA Arckaringa Altona Resources 27°30′S 135°30′E / 27.5°S 135.5°E / -27.5; 135.5 (estimate) 560[3] Cancelled[2] Coal to liquid, proposed to have CCS[4]
NSW Redbank 2 [5] Altona Resources 27°36′S 152°52′E / 27.60°S 152.86°E / -27.60; 152.86 (estimate) 151 Cancelled[6] Coal tailings-fired power station
SA Reeves Plains[7] Alinta Energy 34°30′14″S 138°36′40″E / 34.504°S 138.611°E / -34.504; 138.611 300 Approved To be supplied from Moomba-Adelaide gas pipeline
QLD ZeroGen Government of Queensland[8] 23°22′S 150°31′E / 23.37°S 150.51°E / -23.37; 150.51 (estimate) 300 Cancelled[9] Integrated gasification combined cycle (IGCC) with carbon capture and storage (CCS)
QLD Spring Gully [10] Origin Energy 25°26′46″S 150°00′25″E / 25.446°S 150.007°E / -25.446; 150.007 (estimate) 1000 Possibly abandoned Combined-cycle gas-fired power station. First 500 MW stage was planned to be operational in 2008,[11] but as of 2019 has not been built and is no longer on the Origin Energy website.
WA Bluewaters 3 & 4[12] Griffin Energy 416 On hold Fuel is thermal coal. Project delayed due to decreasing demand.[13]
WA Coolimba[14] Aviva Corporation Ltd and AES, sold to Westgen 29°56′56″S 115°12′47″E / 29.949°S 115.213°E / -29.949; 115.213 (estimate)[15] 450 Rejected[16] Fuel is sub-bituminous coal.
VIC Shaw River[17] Santos 38°11′02″S 142°06′40″E / 38.184°S 142.111°E / -38.184; 142.111 (estimate) 1500 Abandoned[18] Gas
VIC Tarrone [19] AGL 38°10′52″S 142°10′48″E / 38.181°S 142.180°E / -38.181; 142.180 920 On hold[20] Gas peaking
SA Quarantine Power Station Expansion Origin Energy 160/180 Proposed Includes an LPG import/storage terminal

Nuclear

edit
State Project name Sponsoring company Coordinates Capacity in MW Commissioning date Status Notes
JBT Jervis Bay Nuclear Power Plant EnergyAustralia 35°08′02″S 150°45′27″E / 35.133841°S 150.757424°E / -35.133841; 150.757424[21] 500 1969-71 Cancelled

Hydro

edit
State Project name Sponsoring company Coordinates Capacity in MW Commissioning date Status Notes
QLD Burdekin Hydro Stanwell Corporation 20°38′37″S 147°08′17″E / 20.6435°S 147.138°E / -20.6435; 147.138 37 Proposed [22]
QLD Kidston Pumped Hydro (using former Kidston Gold Mine) Genex Power 19°05′00″S 144°07′26″E / 19.0833°S 144.124°E / -19.0833; 144.124 250 Expected 2024 Pre-construction [23]
SA Goat Hill Pumped Hydro Altura Group/Delta Electricity 230 Expected late 2022 Proposed At Lincoln Gap, 12 km west of Port Augusta using fresh water[24]
SA Cultana Pumped Hydro Project EnergyAustralia and Arup Group 32°35′S 137°44′E / 32.59°S 137.73°E / -32.59; 137.73 (Cultana)[25] 225 Proposed for 2023 Proposed, pending investment decision Using seawater[26]
SA Highbury Pumped Hydro Tilt Renewables 34°51′S 138°44′E / 34.85°S 138.74°E / -34.85; 138.74 (Highbury) 300 Cancelled[27] Using a former quarry[28]
SA Baroota pumped hydro Rise Renewables 32°55′S 138°04′E / 32.92°S 138.06°E / -32.92; 138.06 (Baroota) 200–270 Proposed Baroota Reservoir 40 km northeast of Port Pirie[29]
SA Middleback Pumped Hydro GFG Alliance 33°15′S 137°07′E / 33.25°S 137.11°E / -33.25; 137.11 (Middleback) 1000 Proposed Iron Duchess mine[30]
SA Kanmantoo mine AGL Energy 35°05′S 139°01′E / 35.09°S 139.01°E / -35.09; 139.01 (Kanmantoo) 250 Plans dropped in February 2020 Cancelled[31] [32][33]

Biomass

edit
State Project name Sponsoring company Coordinates Capacity in MW Commissioning date Status Notes
TAS Bell Bay Pulp Mill[34] Gunns 41°09′18″S 146°55′12″E / 41.155°S 146.92°E / -41.155; 146.92 180 2013 Cancelled Pulp mill biomass
SA Yorke Biomass Energy Project Yorke Biomass Energy Pty Ltd 15 Proposed Will use straw as fuel
SA Edinburgh Parks Bioreactor Plant Stage 1 DeLorean Energy 8 2020 Proposed Converts food waste into methane gas
SA Edinburgh Parks Bioreactor Plant Stage 2 DeLorean Energy 7 2021 Proposed Converts food waste into Methane gas
QLD Ingham Integrated Energy Facility North Queensland Bio-Energy Corporation Limited 115 June 2021 Proposed [35]

Landfill gas

edit
State Project name Sponsoring company Coordinates Capacity in MW Commissioning date Status Notes
NSW Woodlawn Bioreactor (units 7 to 12) [34] EnergyAustralia 6 Q3, 2015 to Q4, 2021 Proposed Landfill gas
NSW Woodlawn Bioreactor (units 4 to 6) [34] EnergyAustralia 3 Q4 2011 to Q2 2014 Proposed Landfill gas
NSW Club Merrylands [34] Energy Response 0.8 Q4 2011 to Q2 2014 Proposed Liquid fuel

Wind

edit
State Project name Sponsoring company Coordinates Capacity in MW Commissioning date Status Notes
QLD Kennedy Wind Farm Windlab 21°S 145°E / 21°S 145°E / -21; 145 750 Proposed [36]
QLD Crows Nest AGL Energy 27°13′S 151°57′E / 27.217°S 151.950°E / -27.217; 151.950 200 Proposed
QLD Archer Point 15°34′S 145°18′E / 15.567°S 145.300°E / -15.567; 145.300 120 Proposed [37]
QLD Clarke Creek Wind and Solar Farm Lacour Energy 22°39′25″S 149°24′14″E / 22.657°S 149.404°E / -22.657; 149.404 800 Expected late 2022 Proposed Joint solar / wind project. Battery storage.[38]
TAS TasWind Hydro Tasmania 39°52′S 143°59′E / 39.867°S 143.983°E / -39.867; 143.983 600 Abandoned [39]
TAS Western Plains Wind Farm Epuron 40°43′26″S 145°15′40″E / 40.724°S 145.261°E / -40.724; 145.261 40 Proposed 13 turbines.[40]
QLD Forest Wind CleanSight and Siemens Financial Services 25°46′34″S 152°47′42″E / 25.776°S 152.795°E / -25.776; 152.795 1200 Proposed [41][42][43]
QLD Forsayth Wind Farm Infigen Energy 18°29′56″S 143°35′31″E / 18.499°S 143.592°E / -18.499; 143.592 75 Proposed [44]
QLD High Road Wind Farm RATCH-Australia 17°36′S 145°28′E / 17.60°S 145.47°E / -17.60; 145.47 80 Proposed [45]
QLD Kaban Green Power Hub Neoen 17°34′S 145°24′E / 17.56°S 145.40°E / -17.56; 145.40 130 Proposed 100MW of battery storage[46]
QLD Lakeland Wind Farm Windlab 15°48′S 144°48′E / 15.8°S 144.8°E / -15.8; 144.8 100 Proposed
QLD Archer Point Wind Farm Wind Power Queensland 15°48′S 144°48′E / 15.8°S 144.8°E / -15.8; 144.8 240 Proposed
TAS Robbins Island Wind Farm[47] UPC Renewables 40°41′06″S 144°55′34″E / 40.685°S 144.926°E / -40.685; 144.926 340 (Stage 1) Proposed Up to 340 in stage 1, 1000 later[47]
WA Asian Renewable Energy Hub[48] Macquarie Group, CWP Energy Asia, Intercontinental Energy, Vestas[49] 20°S 121°E / 20°S 121°E / -20; 121 (Asian Renewable Energy Park) 2600 2028 (first exports)[50] Proposed; environmental approval Solar/wind to create green hydrogen, ammonia[48][51]

Solar

edit
State Project name Sponsoring company Coordinates Capacity in MW Commissioning date Status Notes
QLD Clarke Creek Wind and Solar Farm Lacour Energy 22°39′25″S 149°24′14″E / 22.657°S 149.404°E / -22.657; 149.404 200-400 Proposed Joint solar / wind project. Battery storage.[38]
QLD Bulli Creek Solar Farm Solar Choice

Sun Edison

27°59′46″S 150°51′18″E / 27.996°S 150.855°E / -27.996; 150.855 2000 Proposed Could become largest solar farm in the world when constructed.[52]
QLD Munna Creek Solar Farm Renewable Energy System Technologies 25°52′S 152°28′E / 25.87°S 152.46°E / -25.87; 152.46 120 Proposed [53]
QLD Moranbah Solar Farm Adani 170 Proposed [53]
QLD Oakey Solar Farm (Stage 2) Oakey 1 AssetCo Pty Ltd 55 Proposed [53]
QLD Childers Solar Farm ESCO Pacific 80 Proposed [53]
QLD Rollingstone Solar Farm ESCO Pacific 110 Proposed [53]
QLD Aramara Solar Farm Eco Energy World Australia 140 Proposed [53]
QLD Kidston II Genex Power 270 Proposed
NSW Jemalong Solar Farm Genex Power 33°24′29″S 147°38′49″E / 33.40806°S 147.64694°E / -33.40806; 147.64694 (Jemalong) 50 2021[54] Under construction
SA Snowtown North Tilt Renewables 45 Proposed
WA Waddi[55] Tilt Renewables 50 Proposed
NSW Beryl Solar Farm New Energy Solar 100 June 2019 Complete[56] 5 km west of Gulgong
NSW Suntop Solar Farm Photon Energy 32°35′24″S 148°49′50″E / 32.5899°S 148.8305°E / -32.5899; 148.8305 170 Proposed
NSW Darlington Point Edify Energy 34°40′23″S 146°01′37″E / 34.673°S 146.027°E / -34.673; 146.027 300 Under construction
SA Cultana Solar Farm Simec Energy Australia 32°57′S 137°35′E / 32.95°S 137.59°E / -32.95; 137.59 280 Expected end of 2020 Proposed To be built (EPC) by Shanghai Electric as the first stage of a plan to power heavy industry with renewable energy[57]
SA Bungama Solar Farm EPS Energy 33°11′S 138°05′E / 33.19°S 138.09°E / -33.19; 138.09 280 Expected 2025[58] Proposed East of Port Pirie[59]
SA Pallamana Solar Farm[60] RES 35°05′S 139°12′E / 35.08°S 139.20°E / -35.08; 139.20 (Pallamana) 176 Expected Mid 2021 Proposed Pallamana northwest of Murray Bridge. Received planning consent 23 July 2019.[61]
WA Asian Renewable Energy Hub[62] Macquarie Group, CWP Energy Asia, Intercontinental Energy, Vestas[49] 20°S 121°E / 20°S 121°E / -20; 121 (Asian Renewable Energy Park) up to 3.5GW[49] Possibly 2026[62] Proposed Undersea cable to southeast Asia and local mining industry intended as customers. Combined with wind farm.

See also

edit

References

edit
  1. ^ "Bipartisan support for Kingston power station plan". ABC News. 19 October 2007.
  2. ^ a b Opray, Max (11 June 2015). "Coal on the way out of South Australia". The New Daily. Retrieved 22 June 2019.
  3. ^ 2014 South Australia Fuel and Technology Report
  4. ^ "Altona Resources". Archived from the original on 9 April 2008. Retrieved 16 April 2008.
  5. ^ "National Statement on Coal Power Station Proposals" (PDF). Archived from the original (PDF) on 11 February 2012. Retrieved 8 November 2014.
  6. ^ "Login".
  7. ^ "Reeves Plains Power Station Proposal". Alinta Energy. 27 July 2017. Retrieved 28 December 2020.
  8. ^ "Project Participants". Queensland Government. Archived from the original on 3 August 2008. Retrieved 8 November 2014.
  9. ^ "ZeroGen". ZeroCO2.no. Retrieved 26 September 2019.</ref.
  10. ^ "Proposed Spring Gully Power Station". Archived from the original on 22 May 2009. Retrieved 8 November 2014.
  11. ^ "Origin power station under assessment". www.insideconstruction.com.au. 22 March 2005. Archived from the original on 22 September 2018. Retrieved 21 September 2018.
  12. ^ "Bluewaters Power Station Expansion". Archived from the original on 24 February 2012. Retrieved 8 November 2014.
  13. ^ "Bluewaters gets five-year extension". The West Australian. 6 May 2015. Retrieved 21 September 2018.
  14. ^ "Welcome to Coolimba Power". Archived from the original on 25 October 2009.
  15. ^ "Coolimba Power Station - SourceWatch".
  16. ^ "WA's EPA rejects Aviva coal-fired power station proposal". 12 February 2011. Retrieved 22 September 2018.
  17. ^ "Shaw River Power Station". Archived from the original on 23 April 2011. Retrieved 17 April 2011.
  18. ^ "Industry Report - Projects". Retrieved 22 September 2018.
  19. ^ "Tarrone Power Project". Archived from the original on 25 May 2011. Retrieved 17 April 2011.
  20. ^ "Tarrone Power Project". AGL Energy. Retrieved 26 September 2019. AGL has no immediate plans to begin construction on this project.
  21. ^ jim (22 March 2012). "Jervis Bay - proposed nuclear power reactor site 1969-71". Australian Nuclear and Uranium Sites. Retrieved 20 March 2021.
  22. ^ "Burdekin Dam Hydro". Stanwell Corp. Retrieved 4 February 2012.[permanent dead link]
  23. ^ "HYDRO-BOOM: JOBS GALORE AS PROJECT APPROVED".
  24. ^ "Goat Hill". Our Projects. Altura Group. Retrieved 22 July 2019.
  25. ^ "Cultana Pumped Hydro Project" (PDF). Knowledge Sharing Report. Australian Renewable Energy Agency. September 2017. p. 12. Retrieved 22 July 2019.
  26. ^ "About the Cultana Pumped Hydro Project". EnergyAustralia. Retrieved 22 July 2019.
  27. ^ "$440 million pumped hydro scheme at Highbury quarry abandoned". Advertiser. 19 September 2019.
  28. ^ "Highbury Pumped Hydro Energy Storage". Tilt Renewables. Retrieved 22 July 2019.
  29. ^ "Baroota Pumped Hydro Project". Rise Renewables. Retrieved 22 July 2019.
  30. ^ "GFG Alliance commits to funding Middleback Pumped Hydro Study". ZEN Energy. 8 February 2018. Retrieved 22 July 2019.
  31. ^ "AGL and Hillgrove Resources mutually agree to end Kanmantoo project" (Press release). AGL Energy. 21 February 2020. Retrieved 18 March 2021.
  32. ^ Spence, Andrew (16 April 2019). "Pumped hydro future planned for Kanmantoo's big pit". InDaily. Retrieved 4 July 2019.
  33. ^ "AGL secures right to develop pumped hydro energy storage project in South Australia". ASX and Media Releases. AGL Energy. 16 April 2019. Retrieved 10 October 2019.
  34. ^ a b c d "AEMO Proposed Generation Projects". Archived from the original on 25 July 2011. Retrieved 26 July 2011.
  35. ^ "North Queensland Bio-Energy Corporation (NQBE)". www.nqbioenergy.com.au. Retrieved 21 September 2018.
  36. ^ "Kennedy Wind Farm". windlab. Archived from the original on 18 July 2010. Retrieved 26 July 2011.
  37. ^ "Archer Point Wind Farm". Archived from the original on 26 March 2012. Retrieved 4 February 2012.
  38. ^ a b "The Project". Clarke Creek Wind and Solar Farm project. Retrieved 21 September 2018.
  39. ^ "Big wind farm project for King Island". 28 November 2012. Retrieved 28 November 2012.
  40. ^ "Western Plains". Retrieved 22 September 2018.
  41. ^ "Forest Wind". Forest Wind. Retrieved 23 December 2019.
  42. ^ Mazengarb, Michael (19 December 2019). "Massive 1,200MW Wide Bay wind farm gets kick start from state government". RenewEconomy. Retrieved 23 December 2019.
  43. ^ "Job-generating Wide Bay wind farm proposal gaining momentum - The Queensland Cabinet and Ministerial Directory". statements.qld.gov.au. Retrieved 23 December 2019.
  44. ^ "Media Release" (PDF). Retrieved 21 September 2018.
  45. ^ "Introduction to RATCH-Australia and Mount Emerald Wind Farm" (PDF). October 2016. Retrieved 21 September 2018.
  46. ^ "Overview". Retrieved 21 September 2018.
  47. ^ a b "Jim's Plain & Robbins Island Renewable Energy Parks". Retrieved 17 January 2020.
  48. ^ a b Collins, Ben (10 November 2020). "World's largest renewable energy project proposed for north-west Australia ditches electricity in favour of ammonia exports". ABC News (Australian Broadcasting Corporation). Retrieved 12 November 2020.
  49. ^ a b c Williams, Peter (8 October 2018). "Macquarie Group plugs into $22b Asian Renewable Energy Hub in Pilbara". The West Australian. Retrieved 17 January 2020.
  50. ^ Fowler, Elouise (22 October 2020). "Renewable energy hub to get 'major project' status". Australian Financial Review. Retrieved 12 November 2020.
  51. ^ "Massive Asian Renewable Energy Hub grows to 26GW of wind and solar". RenewEconomy. 16 October 2020. Retrieved 12 November 2020.
  52. ^ "Bulli Creek Solar Farm". POWER PLANTS. Retrieved 22 September 2018.
  53. ^ a b c d e f "2018 Major Projects List" (PDF). Retrieved 22 September 2018.
  54. ^ Mazengarb, Michael (9 December 2020). "Genex says Jemalong solar farm energised, ready to send power to grid". Renew Economy. Retrieved 24 April 2021.
  55. ^ "Waddi Wind & Solar Farm". Tilt Renewables. Retrieved 17 January 2020.
  56. ^ "Beryl Solar Plant now online". Downer Group. 3 July 2019. Retrieved 24 July 2019.
  57. ^ Maisch, Marija (3 June 2019). "Shanghai Electric to build Gupta's 280 MW Cultana Solar Farm". pv magazine. Retrieved 4 June 2019.
  58. ^ Russell, Chris (12 May 2019). "Port Pirie solar farm developer EPS aims to ease neighbours' fears by downsizing project". The Advertiser. Retrieved 4 June 2019.
  59. ^ "Bungama Solar". Retrieved 4 June 2019.
  60. ^ "Pallamana Solar Farm". RES. Retrieved 23 July 2019.
  61. ^ Parkinson, Giles; Vorrath, Sophie (23 July 2019). "South Australia has 10GW wind and solar in pipeline as it heads to 100% renewables". Renew Economy. Retrieved 23 July 2019.
  62. ^ a b "Asian Renewable Energy Hub". Archived from the original on 8 May 2021. Retrieved 17 January 2019.