List of rail transit stations in the Klang Valley area

The Klang Valley, Malaysia, is served by the Klang Valley Integrated Transit System, consisting of various rail transit services. As of 2024, the system encompasses 528.4 kilometres (328.3 mi) of grade-separated railway with 197 operational stations.[Note 1]

The following are lists of rail transit stations in the Klang Valley, sorted in to alphabetical order and also according to their respective routes.

List of stations in alphabetical order

edit

Stations with two or more station codes indicate an interchange station, offering same-building transfers between rail lines. However, not all lines have linked paid areas within their interchange stations as different rail operators have different ticketing systems, requiring passengers to tap out of one system and tap in again when transferring between lines.

Stations with the same name but listed separately serve the same area, however, essentially operate as different stations due to not being in the same station building.

Station Station Code Photo Line(s) Operator Type Local authority Opened Remarks
Abdullah Hukum  KD01 
 KJ17 
  2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
KTM
Rapid Rail
Commuter rail
LRT
Kuala Lumpur 1 September 1998 (LRT)
28 October 2018 (KTM Komuter)
Alam Megah  KJ35    5 Kelana Jaya Line Rapid Rail LRT Shah Alam 30 June 2016
Alam Sutera  SP21    4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 31 October 2015
Ampang  AG18    3 Ampang Line Rapid Rail LRT Ampang Jaya 16 December 1996
Ampang Park (LRT)  KJ9    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999 Walking distance to  PY20  Ampang Park (MRT)
Ampang Park (MRT)  PY20  12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023 Walking distance to  KJ9  Ampang Park (LRT)
Angkasapuri  KD02    2 Tanjung Malim-Port Klang Line KTM Commuter rail Kuala Lumpur 14 August 1995
Ara Damansara  KJ26    5 Kelana Jaya Line Rapid Rail LRT Petaling Jaya 30 June 2016
Asia Jaya  KJ21    5 Kelana Jaya Line Rapid Rail LRT Petaling Jaya 1 September 1998
Awan Besar  SP19    4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 31 October 2015
Bandaraya  AG6 
 SP6 
  3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 16 December 1996 Walking distance to  KA03  Bank Negara
Bandar Puteri  SP27    4 Sri Petaling Line Rapid Rail LRT Subang Jaya 31 March 2016
Bandar Tasik Selatan  KB04 
 KT2 
 SP15 
  1 Batu Caves-Pulau Sebang Line
4 Sri Petaling Line
7 KLIA Transit
KTM
Rapid Rail
ERL
Airport rail link
Commuter rail
LRT
Kuala Lumpur 10 November 1995 (KTM Komuter)
11 July 1998 (LRT)
20 June 2002 (ERL)
There is no paid-area-to-paid-area integration. Walkways connect the three stations.
Bandar Tun Hussein Onn  KG29    9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
Bandar Tun Razak  SP14    4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 11 July 1998
Bandar Utama  KG09    9 Kajang Line Rapid Rail MRT Petaling Jaya 16 December 2016
Bangi  KB09    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kajang 1995
Bangsar (Bank Rakyat-Bangsar)  KJ16    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 September 1998
Bank Negara  KA03    1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTM Commuter rail Kuala Lumpur 14 August 1995 Walking distance to  AG6  SP6  Bandaraya
Batang Benar  KB10    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 1995
Batang Kali  KA12    2 Tanjung Malim-Port Klang Line KTM Commuter rail Hulu Selangor 21 April 2007
Batu 11 Cheras  KG30    9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
Batu Caves  KC05    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Selayang April 2010
Batu Kentonmen  KC02    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur April 2010
Batu Tiga  KD10    2 Tanjung Malim-Port Klang Line KTM Commuter rail Shah Alam 1995
Bukit Badak  KD13    2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
Bukit Bintang (MRT) (Pavilion-Bukit Bintang)  KG18A    9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017 Walking distance to  MR6  Bukit Bintang (Monorail)
Bukit Bintang Monorail  MR6    8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003 Walking distance to  KG18A  Bukit Bintang (MRT)
Bukit Dukung  KG31    9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
Bukit Jalil  SP17    4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 11 July 1998
Bukit Nanas  MR8    8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003 Walking distance to  KJ12  Dang Wangi
Cahaya  AG17    3 Ampang Line Rapid Rail LRT Ampang Jaya 16 December 1996
Cempaka  AG16    3 Ampang Line Rapid Rail LRT Ampang Jaya 16 December 1996
Chan Sow Lin  AG11 
 SP11 
 PY24 
  3 Ampang Line
4 Sri Petaling Line
12 Putrajaya Line
Rapid Rail LRT
MRT
Kuala Lumpur 16 December 1996
(LRT)
16 March 2023
(MRT)
Cheras  SP12    4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 11 July 1998
Chow Kit  MR10    8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003
Cochrane  KG21    9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017
Conlay (Conlay-Kompleks Kraf)  PY22    12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Cyberjaya City Centre (Cyberjaya City Centre-Limkokwing)  PY40    12 Putrajaya Line Rapid Rail MRT Sepang 16 March 2023
Cyberjaya Utara (Cyberjaya Utara-Finexus)  PY39    12 Putrajaya Line Rapid Rail MRT Sepang 16 March 2023
Damai  KJ8    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999
Damansara Damai  PY05    12 Putrajaya Line Rapid Rail MRT Petaling Jaya 16 June 2022
Dang Wangi  KJ12    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999 Walking distance to  MR8  Bukit Nanas
Dato' Keramat  KJ7    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999
Glenmarie (CGC-Glenmarie)  KJ27    5 Kelana Jaya Line Rapid Rail LRT Petaling Jaya 30 June 2016
Gombak  KJ1    5 Kelana Jaya Line Rapid Rail LRT Selayang 1 June 1999
Hang Tuah (BBCC-Hang Tuah)  AG9 
 SP9 
 MR4 
  3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
Rapid Rail LRT
Monorail
Kuala Lumpur 16 December 1996 (LRT)
31 August 2003 (Monorail)
Hospital Kuala Lumpur  PY18    12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Imbi  MR5    8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003
IOI Puchong Jaya  SP24    4 Sri Petaling Line Rapid Rail LRT Subang Jaya 31 March 2016
Jalan Ipoh  PY15    12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Jalan Kastam  KD18    2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
Jalan Templer  KD05    2 Tanjung Malim-Port Klang Line KTM Commuter rail Petaling Jaya 14 August 1995
Jelatek  KJ6    5 Kelana Jaya Line Rapid Rail LRT Ampang Jaya 1 June 1999
Jinjang  PY11    12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 June 2022
Kajang  KB06 
 KG35 
  1 Batu Caves-Pulau Sebang Line
9 Kajang Line
KTM
Rapid Rail
Commuter rail
MRT
Kajang 10 November 1995 (KTM Komuter)
17 July 2017 (MRT)
Kajang 2  KB07    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kajang 13 March 2023
Kampung Baru  KJ11    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999
Kampung Batu  KC03 
 PY13 
  1 Batu Caves-Pulau Sebang Line
12 Putrajaya Line
KTM
Rapid Rail
Commuter rail
MRT
Kuala Lumpur April 2010 (KTM Komuter)
16 June 2022 (MRT)
Kampung Dato Harun  KD06    2 Tanjung Malim-Port Klang Line KTM Commuter rail Petaling Jaya 14 August 1995
Kampung Raja Uda  KD17    2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
Kampung Selamat  PY03    12 Putrajaya Line Rapid Rail MRT Petaling Jaya 16 December 2016
Kelana Jaya  KJ24    5 Kelana Jaya Line Rapid Rail LRT Petaling Jaya 1 September 1998
Kentonmen  PY14    12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Kepong  KA06    2 Tanjung Malim-Port Klang Line KTM Commuter rail Kuala Lumpur 1995
Kepong Baru  PY10    12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 June 2022
Kepong Sentral  KA07    2 Tanjung Malim-Port Klang Line KTM Commuter rail Kuala Lumpur 1 July 2006 Connecting station with  PY08  Sri Damansara Timur
Kerinchi  KJ18    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 September 1998
Kinrara BK5  SP22    4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 31 October 2015
Klang  KD14    2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
KLCC  KJ10    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999 Suria KLCC
KLIA T1  KE23 
 KT5 
  6 KLIA Ekspres
7 KLIA Transit
ERL Airport rail link Sepang 14 April 2002 (KLIA Ekspres)
20 June 2002 (KLIA Transit)
KLIA T2  KE3 
 KT6 
  6 KLIA Ekspres
7 KLIA Transit
ERL Airport rail link Sepang 1 May 2014
Kota Damansara (Kota Damansara-Thomson Hospital)  KG06    9 Kajang Line Rapid Rail MRT Petaling Jaya 16 December 2016
Kuala Kubu Bharu  KA14    2 Tanjung Malim-Port Klang Line KTM Commuter rail Hulu Selangor 5 January 2008
Kuala Lumpur  KA02    1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTM Commuter rail Kuala Lumpur 14 August 1995
Kuala Lumpur Sentral (KL Sentral)  KA01 
 KS01 
 KJ15 
 KE1 
 KT1 
  1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
10 KL Sentral-Terminal Skypark Line
KTM
Rapid Rail
ERL
Airport rail link
Commuter rail
LRT
Kuala Lumpur 2001 (Kelana Jaya Line, Batu Caves-Pulau Sebang Line, Tanjung Malim-Port Klang Line)
14 April 2002 (KLIA Ekspres)
20 June 2002 (KLIA Transit)
1 May 2018 (KL Sentral-Skypark Line)
There is no paid-area-to-paid-area integration between the different operators in KL Sentral. Walkways to  MR1  KL Sentral Monorail and  KG15  Muzium Negara
The LRT part of this station is known as KL Sentral-redONE
Kuala Lumpur Sentral (KL Sentral) Monorail  MR1    8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003 Walkways to  KA01  KS01  KJ15  KE1  KT1  KL Sentral and  KG15  Muzium Negara
Kuang  KA09    2 Tanjung Malim-Port Klang Line KTM Commuter rail Selayang 1995
Kuchai  PY27    12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Kwasa Damansara  KG04 
 PY01 
  9 Kajang Line
12 Putrajaya Line
Rapid Rail MRT Shah Alam 16 December 2016 (Kajang Line)
16 June 2022 (Putrajaya Line)
Kwasa Sentral  KG05    9 Kajang Line Rapid Rail MRT Shah Alam 16 December 2016
Labu  KB12    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 1995
Lembah Subang  KJ25    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 30 June 2016
Maharajalela  MR3    8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003
Maluri (AEON-Maluri)  AG13 
 KG22 
  3 Ampang Line
9 Kajang Line
Rapid Rail LRT
MRT
Kuala Lumpur 16 December 1996 (LRT)
17 July 2017 (MRT)
The MRT station is also known as AEON-Maluri
Masjid Jamek  AG7 
 SP7 
 KJ13 
  3 Ampang Line
4 Sri Petaling Line
5 Kelana Jaya Line
Rapid Rail LRT Kuala Lumpur 16 December 1996
(Ampang & Sri Petaling Lines)
1 June 1999
(Kelana Jaya Line)
Medan Tuanku  MR9    8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003
Mentari  SB2    B1 BRT Sunway Line Rapid Bus BRT Petaling Jaya 2 June 2015
Merdeka  KG17    9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017 Integrated (paid-area-to-paid-area) link to  AG8  SP8  Plaza Rakyat
Metro Prima  PY09    12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 June 2022
Mid Valley  KB01    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur 23 August 2004
Miharja  AG12    3 Ampang Line Rapid Rail LRT Kuala Lumpur 16 December 1996
Muhibbah  SP20    4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 31 October 2015
Mutiara Damansara  KG08    9 Kajang Line Rapid Rail MRT Petaling Jaya 16 December 2016
Muzium Negara  KG15    9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017 Walkways to  KA01  KS01  KJ15  KE1  KT1  KL Sentral and  MR1  KL Sentral Monorail
Nilai  KB11    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 1995
Padang Jawa  KD12    2 Tanjung Malim-Port Klang Line KTM Commuter rail Shah Alam 1995
Pandan Indah  AG15    3 Ampang Line Rapid Rail LRT Ampang Jaya 16 December 1996
Pandan Jaya  AG14    3 Ampang Line Rapid Rail LRT Ampang Jaya 16 December 1996
Pantai Dalam  KD03    2 Tanjung Malim-Port Klang Line KTM Commuter rail Kuala Lumpur 14 August 1995
Pasar Seni  KJ14 
 KG16 
  5 Kelana Jaya Line
9 Kajang Line
Rapid Rail LRT
MRT
Kuala Lumpur 1 September 1998 (LRT)
17 July 2017 (MRT)
Walking distance to  KA02  Kuala Lumpur Station
Persiaran KLCC  PY21    12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Petaling  KD04    2 Tanjung Malim-Port Klang Line KTM Commuter rail Kuala Lumpur 14 August 1995
Port Klang (Pelabuhan Klang)  KD19    2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
Phileo Damansara  KG12    9 Kajang Line Rapid Rail MRT Kuala Lumpur 16 December 2016
Plaza Rakyat  AG8 
 SP8 
  3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 16 December 1996 Integrated (paid-area-to-paid-area) link to  KG17  Merdeka
Puchong Perdana  SP28    4 Sri Petaling Line Rapid Rail LRT Subang Jaya 30 June 2016
Puchong Prima  SP29    4 Sri Petaling Line Rapid Rail LRT Subang Jaya 30 June 2016
Pudu  AG10 
 SP10 
  3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 16 December 1996
Pulau Sebang/Tampin  KB18    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Alor Gajah 10 October 2015
Pusat Bandar Damansara (Pavilion-Pusat Bandar Damansara)  KG13    9 Kajang Line Rapid Rail MRT Kuala Lumpur 16 December 2016
Pusat Bandar Puchong  SP25    4 Sri Petaling Line Rapid Rail LRT Subang Jaya 31 March 2016
Putra  KA04    1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTM Commuter rail Kuala Lumpur 1995
Putra Heights  SP31 
 KJ37 
  4 Sri Petaling Line
5 Kelana Jaya Line
Rapid Rail LRT Subang Jaya 30 June 2016
Putra Permai  PY37    12 Putrajaya Line Rapid Rail MRT Subang Jaya 16 March 2023
Putrajaya Sentral  KT3 
 PY41 
  7 KLIA Transit
12 Putrajaya Line
ERL
Rapid Rail
Airport rail link
MRT
Putrajaya 20 June 2002
(ERL)
16 March 2023
(MRT)
The KLIA Transit part of this station is known as Putrajaya & Cyberjaya
PWTC  AG4 
 SP4 
  3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 11 July 1998
Raja Chulan  MR7    8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003
Raja Uda (Raja Uda-UTM)  PY19    12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Rasa  KA13    2 Tanjung Malim-Port Klang Line KTM Commuter rail Hulu Selangor 21 April 2007
Rawang  KA10    2 Tanjung Malim-Port Klang Line KTM Commuter rail Selayang 1995
Rembau  KB17    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Rembau 10 October 2015
Salak Selatan (KTM)  KB03    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur 1995
Salak Selatan (LRT)  SP13    4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 11 July 1998
Salak Tinggi  KT4    7 KLIA Transit ERL Airport rail link Sepang 20 June 2002
Segambut  KA05    2 Tanjung Malim-Port Klang Line KTM Commuter rail Kuala Lumpur 1995
Semantan  KG14    9 Kajang Line Rapid Rail MRT Kuala Lumpur 16 December 2016
Senawang  KB15    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 14 May 2011
Sentul (KTM)  KC01    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur 1995
Sentul (LRT)  AG2 
 SP2 
  3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 11 July 1998
Sentul Barat  PY16    12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Sentul Timur  AG1 
 SP1 
  3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 11 July 1998
Seputeh  KB02    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur 1995
Serdang  KB05    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Subang Jaya 1995
Serdang Jaya  PY33    12 Putrajaya Line Rapid Rail MRT Subang Jaya 16 March 2023
Serdang Raya Selatan  PY32    12 Putrajaya Line Rapid Rail MRT Subang Jaya 16 March 2023
Serdang Raya Utara  PY31    12 Putrajaya Line Rapid Rail MRT Subang Jaya 16 March 2023
Seremban  KB14    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 1995
Serendah  KA11    2 Tanjung Malim-Port Klang Line KTM Commuter rail Hulu Selangor 21 April 2007
Seri Setia  KD07    2 Tanjung Malim-Port Klang Line KTM Commuter rail Petaling Jaya 14 August 1995
Setia Jaya (Sunway-Setia Jaya)  KD08 
 SB1 
  2 Tanjung Malim-Port Klang Line
B1 BRT Sunway Line
KTM
Rapid Bus
Commuter rail
BRT
Petaling Jaya 14 August 1995
(KTM Komuter)
2 June 2015
(BRT)
The BRT part of the station is known as Sunway-Setia Jaya.
Setiawangsa  KJ5    5 Kelana Jaya Line Rapid Rail LRT Ampang Jaya 1 June 1999
Shah Alam  KD11    2 Tanjung Malim-Port Klang Line KTM Commuter rail Shah Alam 14 August 1995
South Quay-USJ 1  SB6    B1 BRT Sunway Line Rapid Bus BRT Subang Jaya 2 June 2015
Sri Damansara Barat  PY06    12 Putrajaya Line Rapid Rail MRT Petaling Jaya 16 June 2022
Sri Damansara Sentral  PY07    12 Putrajaya Line Rapid Rail MRT Petaling Jaya 16 June 2022
Sri Damansara Timur  PY08    12 Putrajaya Line Rapid Rail MRT Petaling Jaya 16 June 2022 Connecting station with  KA07  Kepong Sentral
Sri Delima  PY12    12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 June 2022
Sri Rampai  KJ4    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 24 December 2010
Sri Raya  KG28    9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
Sri Petaling  SP18    4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 11 July 1998
SS15  KJ29    5 Kelana Jaya Line Rapid Rail LRT Subang Jaya 30 June 2016
SS18  KJ30    5 Kelana Jaya Line Rapid Rail LRT Subang Jaya 30 June 2016
Stadium Kajang  KG34    9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
Subang Alam  KJ36    5 Kelana Jaya Line Rapid Rail LRT Shah Alam 30 June 2016
Subang Jaya  KD09 
 KS02 
 KJ28 
  2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
10 KL Sentral-Terminal Skypark Line
KTM
Rapid Rail
Commuter rail
LRT
Airport rail link
Subang Jaya 14 August 1995 (Tanjung Malim-Port Klang Line)
30 June 2016 (LRT)
1 May 2001 (KL Sentral-Skypark Line)
Sultan Ismail  AG5 
 SP5 
  3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 16 December 1996
Sungai Besi  SP16 
 PY29 
  4 Sri Petaling Line
12 Putrajaya Line
Rapid Rail LRT
MRT
Kuala Lumpur 11 July 1998
(LRT)
16 March 2023
(MRT)
Sungai Buloh  KA08 
 PY04 
  2 Tanjung Malim-Port Klang Line
12 Putrajaya Line
KTM
Rapid Rail
Commuter rail
MRT
Selayang 1995
(KTM Komuter)
16 December 2016
(MRT)
Sungai Gadut  KB16    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 14 May 2011
Sungai Jernih  KG33    9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
SunMed  SB4    B1 BRT Sunway Line Rapid Bus BRT Subang Jaya 2 June 2015
SunU-Monash  SB5    B1 BRT Sunway Line Rapid Bus BRT Subang Jaya 2 June 2015
Sunway Lagoon  SB3    B1 BRT Sunway Line Rapid Bus BRT Subang Jaya 2 June 2015
Surian  KG07    9 Kajang Line Rapid Rail MRT Petaling Jaya 16 December 2016
Taipan  KJ32    5 Kelana Jaya Line Rapid Rail LRT Subang Jaya 30 June 2016
Taman Bahagia  KJ23    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 September 1998
Taman Connaught  KG26    9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017
Taman Equine  PY36    12 Putrajaya Line Rapid Rail MRT Subang Jaya 16 March 2023
Taman Jaya  KJ20    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 September 1998
Taman Melati  KJ2    5 Kelana Jaya Line Rapid Rail LRT Selayang 1 June 1999
Taman Midah  KG24    9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017
Taman Mutiara  KG25    9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017
Taman Naga Emas  PY28    12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Taman Paramount  KJ22    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 September 1998
Taman Perindustrian Puchong  SP26    4 Sri Petaling Line Rapid Rail LRT Subang Jaya 31 March 2016
Taman Pertama  KG23    9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017
Taman Suntex  KG27    9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
Taman Tun Dr Ismail (Taman Tun Dr Ismail-Deloitte)  KG10    9 Kajang Line Rapid Rail MRT Kuala Lumpur 16 December 2016
Taman Wahyu  KC04    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur April 2010
Tanjung Malim  KA15    2 Tanjung Malim-Port Klang Line KTM Commuter rail Tanjung Malim 1 June 2008
Teluk Gadong  KD16    2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
Teluk Pulai  KD15    2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
Terminal Skypark  KS03    10 KL Sentral-Terminal Skypark Line KTM Airport rail link Subang Jaya 1 May 2018
Tiroi  KB13    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 1995
Titiwangsa  AG3 
 SP3 
 MR11 
 PY17 
  3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line
Rapid Rail LRT
Monorail
MRT
Kuala Lumpur 11 July 1998
(LRT)
31 August 2003
(Monorail)
16 March 2023
(MRT)
Tun Razak Exchange (Tun Razak Exchange-Samsung Galaxy)  KG20 
 PY23 
  9 Kajang Line
12 Putrajaya Line
Rapid Rail MRT Kuala Lumpur 17 July 2017
(Kajang Line)
16 March 2023
(Putrajaya Line)
Tun Sambanthan  MR2    8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003
Universiti  KJ19    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 September 1998
UKM  KB08    1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur 1995
UPM  PY34    12 Putrajaya Line Rapid Rail MRT Subang Jaya 16 March 2023
USJ 7  KJ31 
 SB7 
  5 Kelana Jaya Line
B1 BRT Sunway Line
Rapid Rail
Rapid Bus
LRT
BRT
Subang Jaya 30 June 2016
(LRT)
2 June 2015
(BRT)
USJ 21  KJ34    5 Kelana Jaya Line Rapid Rail LRT Subang Jaya 30 June 2016
Wangsa Maju  KJ3    5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999
Wawasan  KJ33    5 Kelana Jaya Line Rapid Rail LRT Subang Jaya 30 June 2016
16 Sierra  PY38    12 Putrajaya Line Rapid Rail MRT Sepang 16 March 2023

List of stations according to lines

edit
 
Railway lines around Klang Valley
Lines Type Termini Number of Stations Length (km) Owner Operator Status
1 Batu Caves-Pulau Sebang Line Commuter rail Batu Caves 27 135.6 KTM KTM Operational
Pulau Sebang/Tampin
2 Tanjung Malim-Port Klang Line Commuter rail Tanjung Malim 34 127.5 KTM KTM Operational
Port Klang
3 Ampang Line LRT Sentul Timur 18 15 Prasarana Malaysia Rapid Rail Operational
Ampang
4 Sri Petaling Line LRT Sentul Timur 29 37.6 Prasarana Malaysia Rapid Rail Operational
Putra Heights
5 Kelana Jaya Line LRT Gombak 37 46.4 Prasarana Malaysia Rapid Rail Operational
Putra Heights
6 KLIA Ekspres Express Airport rail link KL Sentral 3 59.1 Express Rail Link (ERL) ERL Operational
KLIA T2
7 KLIA Transit Airport rail link KL Sentral 6 Express Rail Link (ERL) ERL Operational
KLIA T2
8 KL Monorail Monorail KL Sentral 11 8.6 Prasarana Malaysia Rapid Rail Operational
Titiwangsa
9 Kajang Line MRT Kwasa Damansara 29 46 MRT Corp Rapid Rail Operational
Kajang
10 KL Sentral-Terminal Skypark Line Limited express airport rail link KL Sentral 3 24.5 KTM KTM Suspended[1]
Terminal Skypark
11 Shah Alam Line LRT Bandar Utama 25 37 Prasarana Malaysia Rapid Rail Under construction (Opening in 2025)
Johan Setia
12 Putrajaya Line MRT Kwasa Damansara 36 57.7 MRT Corp Rapid Rail Operational
Putrajaya Sentral
13 Circle Line MRT Loop line 31 51 MRT Corp Rapid Rail Pre-construction[2]
B1 BRT Sunway Line Bus rapid transit (BRT) Sunway-Setia Jaya 7 5.6 Prasarana Malaysia Rapid Bus Operational
USJ 7
Total
197[Note 1] 613.8

Legend
  Interchange station (paid link)

  Connecting station (unpaid link)

  Connected with airport

  Connected with intercity rail service

  Connected with long-distance bus terminal

Rail line denoted in Italics - Under construction

Station name denoted in Italics - Provisioned/future station

Commuter rail lines

edit

The KTM Komuter has two main lines, namely the 1 Batu Caves-Pulau Sebang Line and the 2 Tanjung Malim-Port Klang Line.[3] These two lines begin separately, but share a common route between Putra and KL Sentral stations, before splitting again and heading towards their respective termini. This effectively makes Putra, Bank Negara, Kuala Lumpur and KL Sentral interchange stations between the two lines. The station codes are given based on the portion of the lines the stations are on. (Station code legend: K-Komuter, A-Tanjung Malim route, B-Pulau Sebang/Tampin route, C-Batu Caves route, D-Port Klang route)

Station Code Station Name Interchanges/Connections Opening District/City State/Territory
1 - KTM Batu Caves-Pulau Sebang Line
 KC05  Batu Caves 29 July 2010 Gombak   Selangor
 KC04  Taman Wahyu   Kuala Lumpur   Federal Territories
 KC03  Kampung Batu   12 Putrajaya Line
 KC02  Batu Kentonmen
 KC01  Sentul 1995
 KA04  Putra   2 Tanjung Malim-Port Klang Line

  (PWTC)
3 Ampang Line
4 Sri Petaling Line

 KA03  Bank Negara   2 Tanjung Malim-Port Klang Line

  (Bandaraya)
3 Ampang Line
4 Sri Petaling Line

 KA02  Kuala Lumpur   2 Tanjung Malim-Port Klang Line

 
5 Kelana Jaya Line (Pasar Seni)
9 Kajang Line (Pasar Seni)
  KTM ETS

 KA01  KL Sentral   2 Tanjung Malim-Port Klang Line

 
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 2]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
  KTM ETS

16 April 2001
 KB01  Mid Valley   (Abdullah Hukum)[Note 3]
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
23 August 2004
 KB02  Seputeh 1995
 KB03  Salak Selatan
 KB04  Bandar Tasik Selatan  
4 Sri Petaling Line
7 KLIA Transit
  KTM ETS
  Southern Integrated Terminal (TBS)
 KB05  Serdang Subang Jaya   Selangor
 KB06  Kajang  
9 Kajang Line
  KTM ETS
Hulu Langat
 KB07  Kajang 2 13 March 2023
 KB08  UKM 1995
 KB09  Bangi
 KB10  Batang Benar Seremban   Negeri Sembilan
 KB11  Nilai
 KB12  Labu
 KB13  Tiroi
 KB14  Seremban   KTM ETS
 KB15  Senawang 14 May 2011
 KB16  Sungai Gadut
 KB17  Rembau 30 August 2013 Rembau
 KB18  Pulau Sebang/Tampin   KTM ETS 10 October 2015 Alor Gajah   Malacca
2 - KTM Tanjung Malim-Port Klang Line
 KA15  Tanjung Malim   KTM ETS 1 June 2009 Muallim   Perak
 KA14  Kuala Kubu Bharu   KTM ETS 5 January 2008 Hulu Selangor   Selangor
 KA13  Rasa 21 April 2007
 KA12  Batang Kali   KTM ETS
 KA11  Serendah
 KA10  Rawang   KTM ETS 1995 Gombak
 KA09  Kuang
 KA08  Sungai Buloh  
12 Putrajaya Line
  KTM ETS
Petaling Jaya
 KA07  Kepong Sentral  
12 Putrajaya Line (Sri Damansara Timur)
  KTM ETS
1 July 2006
 KA06  Kepong 1995   Kuala Lumpur   Federal Territories
Segambut 2 November 2025
 KA05  Segambut 1995
Jalan Kuching   13 Circle Line 2028 - 2030
 KA04  Putra   1 Batu Caves-Pulau Sebang Line

  (PWTC)
3 Ampang Line
4 Sri Petaling Line

1995
 KA03  Bank Negara   1 Batu Caves-Pulau Sebang Line

  (Bandaraya)
3 Ampang Line
4 Sri Petaling Line

 KA02  Kuala Lumpur   1 Batu Caves-Pulau Sebang Line

 
5 Kelana Jaya Line (Pasar Seni)
9 Kajang Line (Pasar Seni)
  KTM ETS

 KA01  KL Sentral   1 Batu Caves-Pulau Sebang Line


 
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 2]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
  KTM ETS

16 April 2001
 KD01  Abdullah Hukum  
5 Kelana Jaya Line
1 Batu Caves-Pulau Sebang Line (Mid Valley)[Note 3]
28 October 2018
 KD02  Angkasapuri 1995
 KD03  Pantai Dalam   13 Circle Line
 KD04  Petaling Petaling Jaya   Selangor
 KD05  Jalan Templer
 KD06  Kampung Dato Harun
 KD07  Seri Setia
 KD08  Setia Jaya   B1 BRT Sunway Line (Sunway-Setia Jaya)
 KD09  Subang Jaya  
5 Kelana Jaya Line
10 KL Sentral-Terminal Skypark Line
Subang Jaya
 KD10  Batu Tiga Shah Alam
 KD11  Shah Alam
 KD12  Padang Jawa
 KD13  Bukit Badak Klang
 KD14  Klang
 KD15  Teluk Pulai
 KD16  Teluk Gadong
 KD17  Kampung Raja Uda
 KD18  Jalan Kastam
 KD19  Port Klang

Light rapid transit (LRT) lines

edit

There are three LRT lines currently operating in the Klang Valley, namely the 3 Ampang Line, 4 Sri Petaling Line, and 5 Kelana Jaya Line.[4] The upcoming 11 Shah Alam Line, proposed in 2015 and currently under construction, is slated to open August 2025.[5][6][7]

The Ampang and Sri Petaling Lines operate as a single LRT system. They share a common route from Sentul Timur station to Chan Sow Lin station, therefore, all stations on this route act as interchange stations between both the lines. After Chan Sow Lin, the lines split toward their respective termini. The Kelana Jaya Line starts at Gombak in the north, passing through the city centre, and terminating at Putra Heights station which is also the southern terminus of the Sri Petaling Line, serving as an interchange between the two lines.

The Shah Alam Line, upon completion, will be the first rail transit line in the Klang Valley Integrated Transit System to be situated completely outside the borders of Kuala Lumpur.

Station Code Station Name Interchanges/Connections Opening District/City State/Territory
3 - LRT Ampang Line
 AG1  Sentul Timur   4 Sri Petaling Line 6 December 1998   Kuala Lumpur   Federal Territories
 AG2  Sentul   4 Sri Petaling Line
 AG3  Titiwangsa  
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line
13 Circle Line
 AG4  PWTC   4 Sri Petaling Line

  (Putra)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 AG5  Sultan Ismail   4 Sri Petaling Line

  8 KL Monorail (Medan Tuanku)

16 December 1996
 AG6  Bandaraya   4 Sri Petaling Line

  (Bank Negara)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 AG7  Masjid Jamek  
4 Sri Petaling Line
5 Kelana Jaya Line
 AG8  Plaza Rakyat  
4 Sri Petaling Line
9 Kajang Line (Merdeka)
 AG9  BBCC–Hang Tuah  
4 Sri Petaling Line
8 KL Monorail
 AG10  Pudu   4 Sri Petaling Line
 AG11  Chan Sow Lin  
4 Sri Petaling Line
12 Putrajaya Line
 AG12  Miharja
 AG13  Maluri   9 Kajang Line
 AG14  Pandan Jaya Ampang   Selangor
 AG15  Pandan Indah   13 Circle Line
 AG16  Cempaka
 AG17  Cahaya
 AG18  Ampang
4 - LRT Sri Petaling Line
 SP1  Sentul Timur   3 Ampang Line 6 December 1998   Kuala Lumpur   Federal Territories
 SP2  Sentul   3 Ampang Line
 SP3  Titiwangsa  
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line
13 Circle Line
 SP4  PWTC   3 Ampang Line

  (Putra)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 SP5  Sultan Ismail   3 Ampang Line

  8 KL Monorail (Medan Tuanku)

 SP6  Bandaraya   3 Ampang Line

  (Bank Negara)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

16 December 1996
 SP7  Masjid Jamek  
3 Ampang Line
5 Kelana Jaya Line
 SP8  Plaza Rakyat  
3 Ampang Line
9 Kajang Line (Merdeka)
 SP9  BBCC–Hang Tuah  
3 Ampang Line
8 KL Monorail
 SP10  Pudu   3 Ampang Line
 SP11  Chan Sow Lin  
3 Ampang Line
12 Putrajaya Line
 SP12  Cheras 11 July 1996
 SP13  Salak Selatan   13 Circle Line
 SP14  Bandar Tun Razak
 SP15  Bandar Tasik Selatan  
1 Batu Caves-Pulau Sebang Line
7 KLIA Transit
  KTM ETS
  Southern Integrated Terminal (TBS)
 SP16  Sungai Besi   12 Putrajaya Line
 SP17  Bukit Jalil
 SP18  Sri Petaling
 SP19  Awan Besar 31 October 2015
 SP20  Muhibbah
 SP21  Alam Sutera
 SP22  Kinrara BK5 Subang Jaya   Selangor
 SP24  IOI Puchong Jaya 31 March 2016
 SP25  Pusat Bandar Puchong
 SP26  Taman Perindustrian Puchong
 SP27  Bandar Puteri
 SP28  Puchong Perdana 30 June 2016
 SP29  Puchong Prima
 SP31  Putra Heights   5 Kelana Jaya Line
5 - LRT Kelana Jaya Line
 KJ1  Gombak    ECR  East Coast Rail Link (ECR)
  Eastern Integrated Terminal (TBT)
1 June 1999 Gombak   Selangor
 KJ2  Taman Melati   Kuala Lumpur   Federal Territories
 KJ3  Wangsa Maju
 KJ4  Sri Rampai 24 December 2010
 KJ5  Setiawangsa   13 Circle Line 1 June 1999 Ampang   Selangor
 KJ6  Jelatek
 KJ7  Dato' Keramat   Kuala Lumpur   Federal Territories
 KJ8  Damai
 KJ9  Ampang Park   12 Putrajaya Line
 KJ10  KLCC
 KJ11  Kampung Baru
 KJ12  Dang Wangi   8 KL Monorail (Bukit Nanas)
 KJ13  Masjid Jamek  
3 Ampang Line
4 Sri Petaling Line
 KJ14  Pasar Seni   9 Kajang Line

  (Kuala Lumpur)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
  KTM ETS

1 September 1998
 KJ15  KL Sentral–redONE  
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 2]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
  KTM ETS
16 April 2001
 KJ16  Bank Rakyat–Bangsar 1 September 1998
 KJ17  Abdullah Hukum  
2 Tanjung Malim-Port Klang Line
1 Batu Caves-Pulau Sebang Line (Mid Valley)[Note 3]
 KJ18  Kerinchi
 KJ19  Universiti   13 Circle Line
 KJ20  Taman Jaya Petaling Jaya   Selangor
 KJ21  Asia Jaya
 KJ22  Taman Paramount
 KJ23  Taman Bahagia
 KJ24  Kelana Jaya
 KJ25  Lembah Subang 30 June 2015
 KJ26  Ara Damansara
 KJ27  CGC-Glenmarie   11 Shah Alam Line Shah Alam
 KJ28  Subang Jaya  
2 Tanjung Malim-Port Klang Line
10 KL Sentral-Terminal Skypark Line
Subang Jaya
 KJ29  SS15
 KJ30  SS18
 KJ31  USJ 7   B1 BRT Sunway Line
 KJ32  Taipan
 KJ33  Wawasan
 KJ34  USJ 21
 KJ35  Alam Megah Shah Alam
 KJ36  Subang Alam
 KJ37  Putra Heights   4 Sri Petaling Line Subang Jaya
11 - LRT Shah Alam Line (opening August 2025)
 SA01  Bandar Utama   9 Kajang Line March 2025 Petaling Jaya   Selangor
 SA02  Kayu Ara
 SA03  BU11
 SA04  Tropicana
 SA05  Damansara Idaman
 SA06  SS7
 SA07  Glenmarie   5 Kelana Jaya Line Shah Alam
 SA08  Temasya
 SA09  Kerjaya
 SA10  Stadium Shah Alam
 SA12  Dato' Menteri
 SA13  Raja Muda
 SA14  UiTM Shah Alam
 SA15  Seksyen 7 Shah Alam
 SA16  Bukit Raja Selatan Klang
 SA17  Bandar Baru Klang
 SA18  Pasar Besar Klang
 SA19  Jalan Meru
 SA20  Pasar Jawa
 SA21  Taman Selatan
 SA22  Seri Andalas
 SA23  Klang Jaya
 SA24  Bandar Bukit Tinggi
 SA25  Bandar Botanik
 SA26  Johan Setia

Bus rapid transit (BRT) Lines

edit

The B1 BRT Sunway Line is a bus rapid transit line in Bandar Sunway, Selangor. The BRT line is a public-private partnership project between Prasarana Malaysia and Sunway Group to provide an integrated transit service for the residents and commuters of Bandar Sunway and USJ.[8]

A second BRT line known as the B2 BRT Federal Line was proposed but has been scrapped indefinitely by the government.

Station Code Station Name Interchanges/Connections Opening District/City State/Territory
B1 - BRT Sunway Line
 SB1  Sunway-Setia Jaya   2 Tanjung Malim-Port Klang Line (Setia Jaya) 2 June 2015 Petaling Jaya   Selangor
 SB2  Mentari
 SB3  Sunway Lagoon Subang Jaya
 SB4  SunMed
 SB5  SunU-Monash
 SB6  South Quay-USJ 1
 SB7  USJ 7   5 Kelana Jaya Line
edit

There are two main airport rail link systems. One is operated by Express Rail Link (ERL) and another one by Keretapi Tanah Melayu (KTM).

The ERL system consists of two lines, namely the 6 KLIA Ekspres and the 7 KLIA Transit.[9] The KLIA Ekspres is a non-stop service between KL Sentral and the Kuala Lumpur International Airport (KLIA), and does not stop at any station in between (hence the name "express"). The KLIA Transit services all stations between KL Sentral and KLIA (hence the name "transit").

The 10 KL Sentral-Terminal Skypark Line, operated by KTM as part of its KTM Komuter service, serves the Sultan Abdul Aziz Shah Airport (also known as Subang Airport), spanning 26 km from KL Sentral to Terminal Skypark station. The line shares a common route with the Tanjung Malim-Port Klang Line, but only stops at one station in between, Subang Jaya.[10]

Station Code Station Name Interchanges/Connections Opening District/City State/Territory
6 - ERL KLIA Ekspres
7 - ERL KLIA Transit
 KE1  KT1  KL Sentral  
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
8 KL Monorail[Note 2]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
  KTM ETS
14 April 2002 (KLIA Ekspres)
20 June 2002 (KLIA Transit)
  Kuala Lumpur   Federal Territories
 KT2  Bandar Tasik Selatan  
1 Batu Caves-Pulau Sebang Line
4 Sri Petaling Line
  KTM ETS
  Southern Integrated Terminal (TBS)
 KT3  Putrajaya & Cyberjaya  
12 Putrajaya Line (Putrajaya Sentral)
  Putrajaya
 KT4  Salak Tinggi Sepang   Selangor
 KE2  KT5  KLIA T1   Kuala Lumpur International Airport
 KE3  KT6  KLIA T2 1 May 2014
10 - KTM KL Sentral-Terminal Skypark Line
 KS01  KL Sentral  
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 2]
9 Kajang Line (Muzium Negara)
  KTM ETS
1 May 2018   Kuala Lumpur   Federal Territories
 KS02  Subang Jaya  
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
Subang Jaya   Selangor
 KS03  Terminal Skypark   Sultan Abdul Aziz Shah Airport Shah Alam

Monorail lines

edit

The 8 KL Monorail is situated entirely within Kuala Lumpur city centre and serves the various shopping and entertainment centres throughout the city centre.

The 14 Putrajaya Monorail is a proposed transit line that was meant to serve the administrative capital of Putrajaya. The line's construction began in 2004 but was halted due to the city's low population. As of 2024, the Government of Malaysia has no plans to revive the stalled monorail project.


Station Code Station Name Interchanges/Connections Opening District/City State/Territory
8 - KL Monorail
 MR1  KL Sentral  
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
  KTM ETS
31 August 2003   Kuala Lumpur   Federal Territories
 MR2  Tun Sambanthan
 MR3  Maharajalela
 MR4  BBCC–Hang Tuah  
3 Ampang Line
4 Sri Petaling Line
 MR5  Imbi
 MR6  Bukit Bintang   9 Kajang Line
 MR7  Raja Chulan
 MR8  Bukit Nanas   5 Kelana Jaya Line (Dang Wangi)
 MR9  Medan Tuanku   (Sultan Ismail)
3 Ampang Line
4 Sri Petaling Line
 MR10  Chow Kit
 MR11  Titiwangsa  
3 Ampang Line
4 Sri Petaling Line
12 Putrajaya Line
13 Circle Line

Mass rapid transit (MRT) lines

edit

There are two MRT lines currently operating in the Klang Valley, namely the 9 Kajang Line and the 12 Putrajaya Line.

Both MRT lines begin at their shared northern terminus, Kwasa Damansara station, which provides a cross-platform interchange between the two lines. The Kajang Line proceeds southward, while the Putrajaya Line travels north-eastward and then south towards the city centre, where the two lines interchange again at Tun Razak Exchange station, before proceeding towards their respective termini.

A third MRT line, the proposed 13 Circle Line, is currently undergoing a pre-construction phase. The line will form a loop around the city centre.

Code Station Name Interchanges/Connections District/City State/Territory
9 - MRT Kajang Line
 KG04  Kwasa Damansara   12 Putrajaya Line
  Northern Integrated Terminal (TBU)
16 December 2016 Shah Alam   Selangor
 KG05  Kwasa Sentral
 KG06  Kota Damansara-Thomson Hospital Petaling Jaya
 KG07  Surian
 KG08  Mutiara Damansara
 KG09  Bandar Utama   11 Shah Alam Line
 KG10  Taman Tun Dr Ismail–Deloitte (TTDI)   Kuala Lumpur   Federal Territories
 KG12  Phileo Damansara
 KG12A  Bukit Kiara Selatan   13 Circle Line March 2027
 KG13  Pavilion Damansara Heights–Pusat Bandar Damansara 16 December 2016
 KG14  Semantan
 KG15  Muzium Negara   (KL Sentral)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 2]
10 KL Sentral-Terminal Skypark Line
  KTM ETS
17 July 2017
 KG16  Pasar Seni   5 Kelana Jaya Line

  (Kuala Lumpur)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
  KTM ETS
 KG17  Merdeka   (Plaza Rakyat)
3 Ampang Line
4 Sri Petaling Line
 KG18A  Pavilion Kuala Lumpur–Bukit Bintang   8 KL Monorail
 KG20  Tun Razak Exchange–Samsung Galaxy (TRX)   12 Putrajaya Line
 KG21  Cochrane
 KG22  AEON–Maluri   3 Ampang Line
 KG23  Taman Pertama
 KG24  Taman Midah   13 Circle Line
 KG25  Taman Mutiara
 KG26  Taman Connaught
 KG27  Taman Suntex Hulu Langat   Selangor
 KG28  Sri Raya
 KG29  Bandar Tun Hussein Onn
 KG30  Batu 11 Cheras
 KG31  Bukit Dukung
 KG33  Sungai Jernih
 KG34  Stadium Kajang
 KG35  Kajang  
1 Batu Caves-Pulau Sebang Line
  KTM ETS
12 - MRT Putrajaya Line[11]
 PY01  Kwasa Damansara   9 Kajang Line
  Northern Integrated Terminal (TBU)
16 June 2022 Shah Alam   Selangor
 PY03  Kampung Selamat Petaling Jaya
 PY04  Sungai Buloh  
2 Tanjung Malim-Port Klang Line
  KTM ETS
 PY05  Damansara Damai
 PY06  Sri Damansara Barat
 PY07  Sri Damansara Sentral
 PY08  Sri Damansara Timur   (Kepong Sentral)
2 Tanjung Malim-Port Klang Line
  KTM ETS
 PY09  Metro Prima   Kuala Lumpur   Federal Territories
 PY10  Kepong Baru
 PY11  Jinjang
 PY12  Sri Delima
 PY13  Kampung Batu   1 Batu Caves-Pulau Sebang Line
 PY14  Kentonmen 16 March 2023
 PY15  Jalan Ipoh
 PY16  Sentul Barat
 PY17  Titiwangsa  
3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
13 Circle Line
 PY18  Hospital Kuala Lumpur
 PY19  Raja Uda–UTM
 PY20  Ampang Park   5 Kelana Jaya Line
 PY21  Persiaran KLCC
 PY22  Conlay–Kompleks Kraf
 PY23  Tun Razak Exchange–Samsung Galaxy (TRX)   9 Kajang Line
 PY24  Chan Sow Lin  
3 Ampang Line
4 Sri Petaling Line
 PY27  Kuchai   13 Circle Line
 PY28  Taman Naga Emas
 PY29  Sungai Besi   4 Sri Petaling Line
 PY31  Serdang Raya Utara Subang Jaya   Selangor
 PY32  Serdang Raya Selatan
 PY33  Serdang Jaya
 PY34  UPM
 PY36  Taman Equine
 PY37  Putra Permai
 PY38  16 Sierra Sepang
 PY39  Cyberjaya Utara–Finexus
 PY40  Cyberjaya City Centre–Limkokwing
 PY41  Putrajaya Sentral  
7 KLIA Transit (Putrajaya & Cyberjaya)
  Putrajaya   Federal Territories
13 - MRT Circle Line (Opening 2028-2030)[12]
 CC01  Bukit Kiara Selatan   9 Kajang Line 2028 - 2030   Kuala Lumpur   Federal Territories
 CC02  Bukit Kiara
 CC03  Sri Hartamas
 CC04  Mont Kiara
 CC05  Bukit Segambut
 CC06  Taman Sri Sinar
 CC07  Dutamas
 CC08  Jalan Kuching   2 Tanjung Malim-Port Klang Line
 CC09  Titiwangsa  
3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line
 CC10  Kampung Puah
 CC11  Jalan Langkawi
 CC12  Danau Kota
 CC13  Setapak
 CC14  Rejang
 CC15  Setiawangsa   5 Kelana Jaya Line Ampang   Selangor
 CC16  AU2
 CC17  Taman Hillview
 CC18  Tasik Ampang
 CC19  Kampung Pandan
 CC20  Pandan Indah   3 Ampang Line
 CC21  Taman Kencana
 CC22  Taman Cheras   Kuala Lumpur   Federal Territories
 CC23  Taman Midah   9 Kajang Line
 CC24  Jalan Yaacob Latif
 CC25  Sri Permaisuri
 CC26  Salak Selatan   4 Sri Petaling Line
 CC07  Salak Jaya
 CC28  Kuchai   12 Putrajaya Line
 CC29  Jalan Klang Lama
 CC30  Pantai Dalam   2 Tanjung Malim-Port Klang Line
 CC31  Pantai Permai
 CC32  Universiti   5 Kelana Jaya Line
 CC33  UM

Klang Valley Integrated Transit Map

edit

The official Klang Valley Integrated Transit Map, released by Rapid KL, illustrates the connectivity between the different lines through interchanges and connecting stations. The map consists of all operational lines in the Klang Valley Integrated Transit system, as well as the upcoming Shah Alam Line. The map also features stations with parking facilities.

The transit map does not include the proposed Circle Line.

  • Latest version: [1]

Notes

edit
  1. ^ a b Counting interchange stations (paid area integration) and connecting stations (non-paid area integration) within same station building only once.
  2. ^ a b c d e f KL Monorail's KL Sentral station is across the busy Jalan Tun Sambanthan, and it is connected with the overhead bridge that integrates the station with the new retails shopping complex, NU Sentral, and other lines in KL Sentral main hub.
  3. ^ a b c Connection between Abdullah Hukum station and Mid Valley station is possible via a pedestrian bridge across the Klang River, through KL Eco City Mall.

References

edit
  1. ^ "Skypark-KL Sentral rail link to be temporarily halted starting Feb 15". The Star. Retrieved 12 July 2023.
  2. ^ "MASS RAPID TRANSIT LALUAN 3: LALUAN LINGKARAN - SIA & EIA Activities". The Star. Retrieved 20 September 2021.
  3. ^ "KTM BERHAD". www.ktmb.com.my. Archived from the original on 3 April 2017. Retrieved 2 April 2017.
  4. ^ "MyRapid". www.myrapid.com.my. Retrieved 2 April 2017.
  5. ^ "Alignment & Stations | LRT3". www.lrt3.com.my. Retrieved 2 April 2017.
  6. ^ Tan, Danny. "LRT3 Shah Alam Line to start operations in Q3 2025 – delay from March target, physical work 95% complete". Paul Tan's Automotive News. Retrieved 29 July 2024.
  7. ^ "LRT3 to begin taking passengers by 3Q next year, says Loke". New Straits Times. Retrieved 29 July 2024.
  8. ^ "MyRapid". www.myrapid.com.my. Retrieved 2 April 2017.
  9. ^ Bhd, Express Rail Link Sdn. "KLIA Ekspres Schedule". www.kliaekspres.com. Retrieved 2 April 2017.
  10. ^ "Subang SkyPark Terminal Extension Project | Official Suruhanjaya Pengangkutan Awam Darat (S.P.A.D.) Website". www.spad.gov.my. Retrieved 2 April 2017.
  11. ^ "Archived copy". Archived from the original on 17 April 2016. Retrieved 9 November 2017.{{cite web}}: CS1 maint: archived copy as title (link)
  12. ^ "MRT Circle Line (LATEST)". edgeprop.my. Retrieved 15 March 2022.