Madhya Pradesh Power Generation Company Limited
(Redirected from M.P. Power Generation Company Limited)
M.P. Power Generating Company Limited (MPPGCL) is the electricity generation company of the Government of Madhya Pradesh state in India.
Company type | Government-owned Corporation-PSU |
---|---|
Industry | Electricity generation |
Founded | The Company was incorporated on 22.11.2001 & started functioning independently from 01-06-2005 |
Headquarters | Jabalpur, Madhya Pradesh, India |
Area served | State of Madhya Pradesh,India |
Key people | Shri Sanjay Dubey (chairman) Shri Manjeet Singh (managing director) |
Services | Electricity Generation |
Owner | Government of Madhya Pradesh (100%) |
Number of employees | 4878 |
Website | www |
Generation capacity
editThe installed capacity of MPPGCL as on 01.01.2019 is 6315 MW out of which madhya pradesh share is about 6312.50 MW.[1]
PLF (%) LAST 10 YEARS | |||||
YEARS | ATPS | STPS | SGTPS | SSTPP | OVERALL |
2009-10 | 45.89% | 64.57% | 65.99% | N.A. | 62.86% |
2010-11 | 48.66% | 60.51% | 65.78% | N.A. | 61.10% |
2011-12 | 54.66% | 53.68% | 70.20% | N.A. | 61.38% |
2012-13 | 71.66% | 55.26% | 73.52% | N.A. | 66.24% |
2013-14 | 74.3% | 48.0% | 67.8% | N.A. | 60.0% |
2014-15 | 53.3% | 52.9% | 58.1% | 26.23% | 49.6% |
2015-16 | 96.8% | 47.2% | 59.9% | 40.4% | 51.2% |
2016-17 | 80.51% | 31.28% | 58.53% | 23.54% | 40.49% |
2017-18 | 93.94% | 43.09% | 64.26% | 35.90% | 50.55% |
2018-19 | 88.9% | 64.1% | 74.0% | 61.1% | 67.3% |
Power stations
editThermal power stations coal based
editSr.No | Project | Capacity(in M.W.) | Unit MW | Status | EPC Contractor(TG set and Boiler make) |
---|---|---|---|---|---|
1 | Satpura Thermal Power Station | 1330 | 1×200 MW, 3x210 MW, 2x250 MW | All Unit Functional,however 200MW and 210 MW to be decommissioned soon ,1x660 MW under surveying | BHEL |
2 | Amarkantak Thermal Power Station | 210 | 1×210 MW | All Unit Functional ,1x660 MW under surveying | BHEL |
3 | Sanjay Gandhi Thermal Power Station | 1340 | 4×210 MW,1×500 MW | All Unit Functional | BHEL(though ABL make boiler in 210MW units) |
4 | Shree Singaji Thermal Power Station | 2520 | 2x600 MW, 2×660 MW(super critical) | All Unit Functional. | BHEL -600MW, L&T-MHPS-660MW |
Total installed thermal capacity 5400 MW.
Hydel power stations
editSr.No | Power Station | Installed Capacity | M.P.Share | LOCATION/ RIVER | ||||
---|---|---|---|---|---|---|---|---|
1 | Gandhi Sagar(5x23 MW) | 115 | 57.5 | DISTT. MANDSOUR/ CHAMBAL RIVER | ||||
2 | Pench,Totladoh(2x80 MW) | 160 | 107 | DISTT. NAGPUR/ PENCH RIVER | ||||
3 | Rani Awanti Bai Bargi (2x45 MW) | 90 | 90 | BARGI, DISTT. JABALPUR/ NARMADA RIVE | ||||
4 | Rajghat (3x15 MW) | 45 | 22.5 | RAJGHAT, DISTT. ASHOKNAGAR/ BETWA RIVER | ||||
5 | Birsinghpur(1x20 MW) | 20 | 20 | BIRSINGHPUR, DISTT. UMARIYA/ JOHILA RIVER | ||||
6 | Ban Sagar I Tons(3x105 MW) | 315 | 315 | SIRMOUR, DISTT. REWA BEEHAR RIVER | ||||
7 | Ban Sagar II Silpara(2x15 MW) | 30 | 30 | SILPARA, DISTT. REWA/ CANA | ||||
8 | Bansagar -III Deolond (3x20 MW) | 60 | 60 | DEOLOND, DISTT. SHAHDOL/ SONE RIVER | ||||
9 | Bansagar -IV Jhinna (2x10 MW) | 20 | 20 | JHINNA, DISTT. SATNA/ JHINNA DYKE | ||||
10 | Madhikheda (3x20 MW) | 60 | 60 | MADHIKHEDA, DISTT. SHIVPURI/ KALISINDH RIVER | Total | 1186 | 917.5 |
Two proposed Hydel unit at Chhindwara(2x45MW) and Murena(270 MW)
References
edit- ^ "M.P.Power Generating Company Limited". Archived from the original on 9 June 2010. Retrieved 28 August 2010.