The Halkapınar—Otogar Line (Turkish: Halkapınar—Otogar Hattı) is a planned urban commuter railway line in İzmir, Turkey. The line has a total length of 4.5 km (2.8 mi) and would begin at Halkapınar Transfer Center and run southeast along Kamil Tunca Boulevard to the İzmir Bus Terminal (Turkish: Otogar). Construction of the line was approved in May 2017, and is expected to begin in December 2017 or January 2018. It was previously planned as a subway but revised in 2018 to be constructed as a commuter railway.
Halkapınar—Otogar Line | |
---|---|
Overview | |
Native name | Halkapınar—Otogar Hattı |
Status | Planned |
Owner | Turkish State Railways |
Locale | İzmir, Turkey |
Termini |
|
Stations | 5 |
Service | |
Type | Commuter rail |
System | İZBAN |
Operator(s) | İZBAN A.Ş. |
Depot(s) | Alsancak |
Technical | |
Line length | 4.5 km (2.8 mi) |
Character | S-Bahn |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Loading gauge | TCDD gross gauge |
Minimum radius | 210 metres (689 ft 0 in) |
Electrification | 25 kV AC |
Operating speed | 80 km/h (50 mph) |
Signalling | CBTC |
Overview
editThe Halkapınar—Otogar Line was originally planned in 2005 by the İzmir Metropolitan Municipality. The line was planned to diverge from the M1 Line at Halkapınar and run underneath Kamil Tunca Boulevard to the İzmir Bus Terminal. Since Kamil Tunca Boulevard was built on an old railway branch, the land was still owned by the Turkish State Railways. The city municipality bought the land for 22 million YTL (appr. 18.8 million USD at the time) and finalized plans.[1] However construction was later halted by the Ministry of Transport which later acquired the project from the city.[1]
The Ministry of Transport re-planned the line to include it within the Ankara-İzmir high-speed railway, on which construction began in 2013.[2] The ministry included the Halkapınar—Otogar line within their 2014-17 budget and in April 2017 submitted the project for an environmental impact report, which was completed in May.[3][4] The route of the line remained the same but will be constructed together with a heavy rail line.[5] A total of four new stations will be built. These stations are: Vakıflar, Çamdibi, Altındağ and Otogar.[4][6]
See also
editReferences
edit- ^ a b Yılmaz, Mustafa (15 May 2017). "Otogara 30 ay sonra metro". milliyet.com.tr (in Turkish). Retrieved 24 December 2017.
- ^ "Ankara İzmir yüksek hızlı tren hattı". railturkey.org (in Turkish). 27 May 2016. Retrieved 24 December 2017.
- ^ "İzmir'de Halkapınar - Otogar Metrosu için süreç başladı". egehaber.com (in Turkish). 30 April 2017. Retrieved 24 December 2017.
- ^ a b "Halkapınar-Otogar Metro Projesi'nin ÇED süreci tamamlandı". ensonhaber.com (in Turkish). 1 June 2017. Retrieved 24 December 2017.
- ^ "Bakanlık'tan Halkapınar-Otogar metrosuna 'hızlı' çözüm". egedensonsoz.com (in Turkish). 13 February 2013. Retrieved 24 December 2017.
- ^ "Bakanlık'tan İzmir'e Müjde". yeniasir.com.tr (in Turkish). 30 May 2017. Retrieved 24 December 2017.