Malir Expressway is a 39 km under-construction expressway between KPT Interchange (through Qayyumabad) and the Karachi-Hyderabad Motorway near Kathore, along the Malir River in Karachi, Pakistan.[1] One of the major infrastructure developments in Karachi city which is unviable for the provincial government and detrimental to the city's climate. It was announced that half of it would be opened on 14 August 2023, but the opening has been indefinitely delayed after the Asian Development Bank withdrew the funding for the construction;[2] as of right now there is illegal excavation happening on the Malir River bed and the fields of Malir; it is unlikely that Expressway will be completed given the litigation and damage to the only surviving river in Karachi.
Typical cross-section
editIt will be a four-lane carriageway,[3] however it has also been declared to be a six-lane carriageway in the documentation of the Asian Development Bank. It will have a three-lane service road on both sides.
Structures
editThe project includes three flyovers and eight underpasses.[4] Malir expressway is a 4-lane with 3m side Shoulders dual carriageway and a 7.9m raised central median, for future expansion.[5]
DBFOT
editDesign, Built, Finance, Operate & Maintain and Transfer (DBFOT) arrangement with a concession period of 28 years[6]
Southern alternative route
editThe expressway would serve as the Southern alternative route for carrying traffic of the port and industrial areas to main highways.[7] It will not reduce traffic on the existing Shahrah-e-Faisal since the expected traffic flow will be mostly of high-income car passengers, whereas the traffic on Sharae Faisal will be redistributed on all the other public transport projects happening in the city
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table.(October 2022) |
- Qayyumabad
- EBM Causeway
- Korangi – Shah Faisal Colony Bridge
- Shahrah-e-Faisal (N-5) near Quaidabad
- Between 25 and 30 km
- Kathore on Karachi-Hyderabad Motorway (M-9)
See also
editReferences
edit- ^ "CM Murad Ali Shah to lay foundation stone of Malir Expressway next month". www.thenews.com.pk. Retrieved 2020-10-17.
- ^ Siddiqui, Tahir (2023-04-29). "ADB decides against financing Karachi's Malir Expressway". DAWN.COM. Retrieved 2024-07-02.
- ^ "CM approves Link Road for Korangi". The Nation. 2020-10-16. Retrieved 2020-10-17.
- ^ "Work to begin on Malir Expressway next month". The Express Tribune. 2020-10-15. Retrieved 2020-10-17.
- ^ Malir Expressway 4-Lane expansion
- ^ "Malir Expressway Project - PPP Unit GoS". www.pppunitsindh.gov.pk. Retrieved 2020-10-18.
- ^ "Rs39bn contract for Karachi's Malir Expressway approved". www.thenews.com.pk. Retrieved 2020-10-17.
- ^ "Is There Any Reality to the Hype of Malir Expressway?". A blog about real estate, lifestyle and tourism in Pakistan | Zameen Blog. Retrieved 2020-10-17.