Mindoro–Batangas Super Bridge

The Mindoro–Batangas Super Bridge[1] is a proposed 14 km (8.7 mi) pontoon bridge which is planned to connect the Philippine province of Batangas and Mindoro island.

Mindoro–Batangas Super Bridge
Coordinates13°34′15″N 121°02′32″E / 13.5709078°N 121.0422134°E / 13.5709078; 121.0422134
CrossesIsla Verde Passage
Official nameMindoro–Batangas Super Bridge
Characteristics
Designpontoon bridge
Total length14 km (8.7 mi)
History
Construction cost₱18 billion (2015 estimate)
Location
Map

History

edit

Proposals to construct a bridge to connect Batangas and Mindoro island has been made as early as 2011. The bridge is meant to facilitate easier transport of agricultural goods from Mindoro island to Metro Manila which are usually exported from the island using inter-island vessels. In early 2011, Oriental Mindoro Governor Alfonso Umali Jr. has coordinated with President Benigno Aquino III regarding the conducting a study to construct a bridge in the area. Aquino has delegated Department of Public Works and Highways (DPWH) secretary, Rogelio Singson to start conducting a feasibility study on the bridge within 2011.[2] On December 22, 2011, Umali met with principal Chinese investors in Calapan regarding plans to construct such a bridge. Chinese engineers also conducted a site survey in the area. The bridge is planned to span across the Isla Verde Passage and will cross Verde Island.[3]

The DPWH announced in January 2012 that construction of the bridge will commence in February 2012,[4] Although construction of the bridge did not commence as announced.

2015 developments

edit
 
The bridge will cross through Verde island.

San Miguel Corporation first expressed interest to construct the bridge in 2013.[5] In early 2015, a group of Malaysian investors led by Mohammed Jamil expressed interest in the project and is eyeing to import rice from Oriental Mindoro. A floating bridge or pontoon bridge design was adopted to avoid damaging the seabed of the Isla Verde Passage which is considered a "center of biodiversity".[6]

San Miguel Corporation presented a plan for the bridge was presented to Governor Vilma Santos of Batangas and Governor Alfonso Umali Jr. of Oriental Mindoro. The cost of the construction of the 14-kilometer-long (8.7 mi) bridge is ₱18 billion and will take five years to build.[7]

The bridge is planned to span the Isla Verde Passage. The bridge compose of two components. The first will span 6.4 kilometers (4.0 mi) from Barangay Ilijan in Batangas City to Verde Island. The second component spanning 4.4 kilometers (2.7 mi) will continue from Verde Island to Barangay Sinandigan in Puerto Galera, Oriental Mindoro.[7]

The Batangas-Mindoro bridge is touted to be the first floating bridge in Asia with high ship passage on its pontoons. The bridge will have pedestrian and bicycle lanes. The bridge will be also designed to withstand typhoons with winds up to 350 km/h (220 mph).[7]

References

edit
  1. ^ "Mindoro–Batangas Super Bridge (Floating Bridge)". Department of Public Works and Highways. Archived from the original on 20 August 2015. Retrieved 27 August 2015.
  2. ^ "P18 B Batangas-Mindoro Bridge, Pinag-aaralan" (in Filipino). Island Sentinel. 9 February 2011. Retrieved 27 August 2015.
  3. ^ "Bridge soon to link Mindoro and Batangas". Mindoro Post. 2 January 2012. Retrieved 27 August 2015.
  4. ^ "Construction of Batangas-Mindoro superbridge starts next month — DPWH". The Philippine Times. 22 January 2012. Retrieved 27 August 2015.
  5. ^ Evora, Robert (17 October 2013). "Superbridge to be built in Oriental Mindoro". Manila Standard Today. Retrieved 27 August 2015.
  6. ^ "Malaysian investor na dumalaw kay Gob. Umali, interesado rin sa pagkuha ng bigas sa lalawiganf". Kapitolyo Para Sa Mamamayan. Communication and Public Relations Services Division/Office of the Governor. 3 March 2015. Retrieved 27 August 2015.
  7. ^ a b c Lozano, Ron (26 August 2015). "Proposed 'SuperBridge' to connect Batangas and Mindoro". CNN Philippines. Archived from the original on 11 September 2015. Retrieved 27 August 2015.