Nagdhunga tunnel (Nepali: नागढुंगा सुरुङ्ग) is a under-construction highway tunnel connecting Sisnekhola of Dhading district and Nagdhunga in Kathmandu. [1] The tunnel will be a part of Tribhuvan Highway. The tunnel has a height of 8.3m and have a lane of 9.5m wide. The length of the tunnel is 2688 m.

Nagdhunga Tunnel under construction (July 2021)

Geology

edit

The tunnel passes through bedrocks of Sopyang formation. There are six shear zones in the alignment. [2]

Nagdhunga Tunnel Construction Project

edit

The contractor of the project is Hazama Ando Corporation. The project was scheduled to be finished by April 2023.[3] The cost estimate of the project is about NPR 22 billion.[4]

Features

edit
  • Tunnel,  2.688 km, 2 lanes, total tunnel (carriageways) width 9.5 m, grade 3.5%
  • Approach road, 2.60 km, 2 lanes, carriageway width 7m, 2 m shoulder
  • Bridge, 3
  • Flyover, 1 at Balambu interchange
  • Toll facility, west side 3 booths, 3 lanes each and east side 2 booths, 2 lanes each
  • Tunnel management office, west side area 390 m2 and east side 300 m2
  • Disposal area development at the east portal;
  • Transmission line 4.14 km.

See also

edit

References

edit
  1. ^ "Oli inaugurates construction work of Nagdhunga tunnel". Archived from the original on 2019-10-22. Retrieved 2021-04-26.
  2. ^ SAPKOTA, AJIT (2016). "HYDROGEOLOGICAL STUDY OF NAGHDHUNGA TUNNEL SITE". {{cite journal}}: Cite journal requires |journal= (help)
  3. ^ Sen, Sandeep (2020-12-25). "Construction of Nagdhunga tunnel starts". The Himalayan Times. Archived from the original on 2021-01-17. Retrieved 2021-04-26.
  4. ^ "Nagdhunga tunnel work gains momentum". GorakhaPatra. Archived from the original on 2020-12-19. Retrieved 2021-04-26.