Nanmendou station (Chinese: 南门兜站; pinyin: Nánméndōu zhàn; Fuzhounese: [naŋ˥˥ muoŋ˥˥ nau˥˥]) is a transfer station of Line 1 and Line 2, also the first transfer station of the Fuzhou Metro.
Chinese name | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 南門兜 | |||||||||||||||
Simplified Chinese | 南门兜 | |||||||||||||||
| ||||||||||||||||
General information | ||||||||||||||||
Location | Gulou, Fuzhou, Fujian China | |||||||||||||||
Coordinates | 26°04′46″N 119°17′50″E / 26.0793338°N 119.2973556°E | |||||||||||||||
Operated by | Fuzhou Metro Co. Ltd. Fuzhou CETC Rail Transit Co., Ltd.. | |||||||||||||||
Line(s) | Line 1 Line 2 | |||||||||||||||
Platforms | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
History | ||||||||||||||||
Opened | Line 1: 6 January 2017 Line 2: 26 April 2019 | |||||||||||||||
Services | ||||||||||||||||
|
Location
editIt is located near the junction of Wushan Road, Bayiqi Road and Gutian Road, Gulou, Fuzhou, Fujian, China. The section of Line 1 started operation on January 6, 2017,[1] while the section of Line 2 started operation on April 26, 2019.[2]
Station details
editServices
editThe station is served by Line 1 and Line 2 and is currently the only interchange on the Fuzhou Metro network. On Line 1, the station is located between Dongjiekou and Chating stations, with a headway of 5′45″ (towards Fuzhou South Railway Station) or 11′30″ (towards Sanjiangkou) during peak hours and 8′20″ during slack hours.[3] On the Line 2, the station is located between Xiyang and Shuibu stations with a headway of 6′30″ during peak hours and 8′20″ to 10′ during slack hours.[4]
Station design
editThe station has three basement levels and currently is the only transfer station on the network, serving two metro lines. The B1 floor is the concourse floor; the north side of B2 floor is the platform level of Line 1 with an island platform, the south side of the B2 floor is the transfer hall; B3 floor is the platform level of Line 2 with an island platform.
- A1: South of the intersection of Daoshan Road and Bayiqi Road
- A2: Connect to Underground Parking of Guanya Plaza
- B: West of Bayiqi Road
- C: Guanya Plaza B1
- D2: Southwest of the intersection of Gutian Road and Bayiqi Road
- D3: Southeast of the intersection of Gutian Road and Bayiqi Road
- E: East of Bayiqi Road
- H: Northeast of the intersection of Gutian Road and Bayiqi Road
- G1: Northwest of the intersection of Gutian Road and Xinquan Road
References
edit- ^ 原浩 (2017-01-04). "福州地铁1号线(一期)全线1月6日正式开通试运营". 福州新闻网. Archived from the original on 2017-01-05. Retrieved 2017-01-05.
- ^ "福州地铁2号线26日开门迎客 公交与地铁接驳方案出炉_福州新闻_新闻频道_福州新闻网". news.fznews.com.cn. Archived from the original on 2019-04-24. Retrieved 2019-04-24.
- ^ "本周日!1号线二期开通!". 2020-12-25.
- ^ "4月26日9:30二号线试运营,换乘全攻略请查收!(附视频指引)". 2019-04-24.
- ^ "南门兜站".