The New Central Wastewater Treatment Plant is a wastewater treatment plant under construction in Songino Khairkhan District, Ulaanbaatar, Mongolia.
New Central Wastewater Treatment Plant | |
---|---|
General information | |
Type | wastewater treatment plant |
Location | Songino Khairkhan |
Town or city | Ulaanbaatar |
Country | Mongolia |
Coordinates | 47°54′09″N 106°45′45″E / 47.90250°N 106.76250°E |
Groundbreaking | 28 February 2019 |
Cost | US$262.7 million |
Grounds | 17.7 hectares |
History
editThe feasibility study to establish the plant was done in 2015. The construction of the plant was officiated on 2 February 2019 and constructed officially started on 28 February 2019 in a groundbreaking ceremony officiated by Prime Minister Ukhnaagiin Khürelsükh.[1] On 31 March 2022, concrete started to be poured into the inner walls of the plant three reaction tanks.[2]
Architecture
editThe plant is constructed in a 17.7 hectares of land. There are 35 buildings being constructed at the plant site.[1]
Technical specifications
editOnce completed, the plant will have a processing capacity of 250,000 m3 of wastewater per day.[2]
Finance
editThe plant costs US$262.7 million which was financed by a loan provided by the Government of China to the Government of Mongolia.[1]
See also
editReferences
edit- ^ a b c Munkhbat, Amarjargal (22 September 2023). "Construction of new sewage treatment plant is slow as usual". UB Post. Retrieved 12 September 2024.
- ^ a b Ma, Chengguang; Zhuang, Qiange (6 July 2022). "CREC4-built sewage plant in Ulaanbaatar reaches new milestone". China Daily. Archived from the original on 27 November 2023. Retrieved 27 November 2023.