North Blyth Biomass Project

The North Blyth Biomass Project was a proposed biomass-fired power station planned to be located at North Blyth, Northumberland on the north bank of the River Blyth near its tidal estuary. When commissioned it would have had a generating capacity of 100 megawatts, enough electricity to provide for 170,000 homes.[1] Renewable Energy Systems, the station's developer, was granted government consent on 24 July 2013 to build the £250m project.

North Blyth Biomass Project
Promotional rendering of the planned station
Map
CountryEngland
LocationNorth Blyth, Northumberland
Coordinates55°8′17″N 1°30′55″W / 55.13806°N 1.51528°W / 55.13806; -1.51528
StatusCancelled
Thermal power station
Primary fuelBiomass
Power generation
Nameplate capacity100 MW planned
External links
Websitewww.northblythproject.co.uk

Although the Secretary of State granted a Development Consent Order as a nationally significant infrastructure project, the project was cancelled on 6 March 2014.[2][3]

Development

edit

In September 2008, the Port of Blyth authority announced that it was planning to build a biomass power station on the redundant Bates Colliery site to the north of Blyth.[4] In May 2009, Port of Blyth selected renewable energy company Renewable Energy Systems (RES) as the developer for the power station.[5]

In December 2009, RES and the Port of Blyth decided to relocate the proposed station site to the north bank of the estuary at North Blyth near the port's new bulk materials handling facility. The reason given for the move was that it would reduce the number of road movements supplying the station, and would give the station access to rail facilities.[6]

 
Proposed site of North Blyth Biomass power station

On 10 and 11 September 2010, RES released the first promotional images of what the station may look like, revealing them to the public in a series of public exhibitions at Blyth Community Enterprise Centre, the North Blyth Club and Cambois Welfare Institute.[1][7] Later that month, RES claimed that 75% of the local residents who had attended the exhibitions had been enthusiastic about the station being built. Only 5% had opposed the scheme and 20% had no opinion. The strong support for the station was attributed to the creation of local employment at the station, the regeneration of the area and the contribution to the renewable energy drive in the area. David Maunder of RES said the company were "delighted with the positive response".[8]

RES chose to build the station in Blyth because of the good workforce in the area and the town's good infrastructure. If built, the station would have contributed to Blyth becoming a centre for renewable energy, with the nearby NaREC.[9] Between 200 and 300 full-time jobs were expected to be created at the peak of the construction of the station, and 40 permanent jobs would have been created once it was operational. It was claimed 95% of these jobs would go to local people.[1][4][5] Planning permission for the station was expected to be submitted to the Infrastructure Planning Commission some time between January and March 2011, but that March the date was moved back to that summer.[9][10] The build time for the station was expected to be around 30 months..[5][11]

Proposed specification

edit

Once fully operational, the station would have generated 100 megawatts (MW) of electricity. This would equate to over 750 million kilowatt hours (kWh) of electricity a year, enough to power 170,000 average British homes.[9] through burning a mixture of biomass fuels. In a year the station would burn between 500,000 and 900,000 tonnes of woodchips, wood pellets, wood briquettes and recycled chipped wood.[5][11] This fuel would be delivered to the station via the nearby port. The electricity generated would have been enough to cut carbon dioxide emissions by over 300,000 tonnes per year.[5]

Cancellation

edit

The cancellation of the project was announced on 6 March 2014 and RES withdrew.[2]

References

edit
  1. ^ a b c "North Blyth biomass power station plans go on show". The Journal. 9 September 2010. Archived from the original on 4 April 2012. Retrieved 8 December 2010.
  2. ^ a b Scott, Sarah (7 March 2014). "Work ceases on £300million biomass power station in Blyth". The Journal. Archived from the original on 10 March 2014. Retrieved 10 March 2014.
  3. ^ "Port Blyth New Biomass Plant". PlanningInspectorate.gov.uk. National Infrastructure Planning. Retrieved 8 August 2021.
  4. ^ a b Black, Dave (25 September 2008). "Warming to plan for green power plant at Cambois". The Journal. Archived from the original on 12 August 2011. Retrieved 22 April 2009.
  5. ^ a b c d e "Firm chosen to develop Blyth biomass plant". The Journal. 8 May 2009. Archived from the original on 12 August 2011. Retrieved 6 August 2009.
  6. ^ Stanford, Anna (11 December 2009). "BIOMASS POWER PROJECT TO RELOCATE TO NORTH BLYTH" (PDF). RES. Archived from the original (PDF) on 20 January 2010. Retrieved 2 June 2010.
  7. ^ "First images released of North Blyth biomass power plant". The Journal. 10 September 2010. Archived from the original on 4 April 2012. Retrieved 8 December 2010.
  8. ^ Black, David (22 September 2010). "Eco-friendly power gets the green light in Blyth". The Journal. Archived from the original on 4 April 2012. Retrieved 20 January 2011.
  9. ^ a b c "North Blyth Biomass Power Station plans take shape". The Journal. 21 March 2011. Archived from the original on 4 October 2011. Retrieved 2 April 2011.
  10. ^ "Port Blyth New Biomass Plant". Infrastructure Planning Commission. 2010. Archived from the original on 19 September 2010. Retrieved 14 December 2010.
  11. ^ a b Black, David (4 December 2010). "Eco-friendly power plant study ready for launch". The Journal. Archived from the original on 9 December 2010. Retrieved 20 January 2011.
edit