State Route 180 (SR 180) is a 29.55-mile (47.56 km) long east–west state highway in the southern portion of the U.S. state of Ohio. SR 180 has its western terminus at a Roundabout with SR 159 nearly 5 miles (8.0 km) northeast of Chillicothe. Its eastern terminus is at a diamond interchange with the U.S. Route 33 (US 33) expressway approximately 3.75 miles (6.04 km) northwest of Logan.
Route information | ||||
---|---|---|---|---|
Maintained by ODOT | ||||
Length | 29.55 mi[1][2][3] (47.56 km) | |||
Existed | 1927[4][5]–present | |||
Major junctions | ||||
West end | SR 159 near Chillicothe | |||
East end | US 33 / CR 33A near Logan | |||
Location | ||||
Country | United States | |||
State | Ohio | |||
Counties | Ross, Pickaway, Hocking | |||
Highway system | ||||
| ||||
|
Route description
editAlong its path, SR 180 travels through northeastern Ross County, the extreme southeastern corner of Pickaway County and the northwestern part of Hocking County. No portion of this highway is included within the National Highway System (NHS). The NHS is a network of routes determined to be most important for the economy, mobility and defense of the nation.[6]
This section needs expansion. You can help by adding to it. (June 2011) |
History
editThe SR 180 designation was applied in 1927. Prior to this time, the stretch of highway that SR 180 currently occupies through Ross, Pickaway and Hocking Counties was designated as SR 27. With the designation of the US 27 in that year, SR 27 was replaced by SR 180. The only change related to SR 180 since its inception has been the highway that it meets at its eastern terminus, which at the time was the predecessor to US 33, SR 31.[4][5]
Construction began in October 2019 on SR 180 western terminus with SR 159. The project redesigns the intersection with a roundabout. Originally, an extension of SR 207 was supposed to meet up, but due to the discovery of a wetland in the environmental study, SR 207 would not intersect with SR 180.[7] Construction was completed the following October.[8]
Major intersections
editCounty | Location | mi[1][2][3] | km | Destinations | Notes |
---|---|---|---|---|---|
Ross | Green Township | 0.00 | 0.00 | SR 159 – Chillicothe | Roundabout |
Adelphi | 11.79 | 18.97 | SR 327 south (Concord Street) / Main Street – Tar Hollow State Forest | Northern terminus of SR 327 | |
Pickaway | Salt Creek Township | 12.44 | 20.02 | SR 56 west – Circleville | Western end of SR 56 concurrency |
Hocking | Laurelville | 13.09 | 21.07 | SR 56 east (Pike Street) / Water Street | Eastern end of SR 56 concurrency |
Perry Township | 20.39 | 32.81 | SR 374 south | Western end of SR 374 concurrency | |
Laurel Township | 25.01 | 40.25 | SR 374 north | Eastern end of SR 374 concurrency | |
25.51 | 41.05 | SR 678 south – Gibisonville | Northern terminus of SR 678 | ||
Falls Township | 29.55 | 47.56 | US 33 / CR 33A – Athens, Columbus | Interchange | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
References
edit- ^ a b Ohio Department of Transportation. "Technical Services Straight Line Diagrams: SR 180, Ross County" (PDF). Archived from the original (PDF) on 2012-03-25. Retrieved 2011-06-02.
- ^ a b Ohio Department of Transportation. "Technical Services Straight Line Diagrams: SR 180, Pickaway County" (PDF). Archived from the original (PDF) on 2012-03-25. Retrieved 2011-06-02.
- ^ a b Ohio Department of Transportation. "Technical Services Straight Line Diagrams: SR 180, Hocking County" (PDF). Archived from the original (PDF) on 2012-03-25. Retrieved 2011-06-02.
- ^ a b Map of Ohio Showing State Routes (MrSID) (Map). Cartography by ODHPW. Ohio Department of Highways and Public Works. August 1926. Retrieved 2011-06-01.
- ^ a b Map of Ohio Showing State Highway System (MrSID) (Map). Cartography by ODHPW. Ohio Department of Highways and Public Works. June 1927. Retrieved 2011-06-01.
- ^ National Highway System: Ohio (PDF) (Map). Federal Highway Administration. December 2003. Archived from the original (PDF) on October 16, 2008. Retrieved 2011-06-01.
- ^ Barnhart, Toria (October 25, 2019). "Construction begins on Ross-207 extension, roundabout project". Chillicothe Gazette. Retrieved February 21, 2020.
- ^ "State Route 207 Connector opens in Ross County". Ohio Department of Transportation. October 8, 2020. Retrieved December 19, 2020.