The Peshawar–Dera Ismail Khan motorway is a 360 km (220 mi) long proposed motorway connecting Peshawar with the southern parts of Khyber Pakhtunkhwa, Pakistan. Starting at the provincial capital Peshawar in the north, it will pass through Darra Adamkhel, Kohat, Hangu, Karak, Bannu(Domel), Ghoriwala, Lakki Marwat, and Darra Pezu, reaching Dera Ismail Khan at its southern end.[1][2]
Peshawar–Dera Ismail Khan motorway | |
---|---|
ایم موٹروے | |
Route information | |
Maintained by NHA | |
Length | 360 km (220 mi) |
Major junctions | |
North end | Peshawar (Pakistan) |
South end | Dera Ismail Khan (Pakistan) |
Location | |
Country | Pakistan |
Towns | Peshawar, Darra Adamkhel, Kohat, Hangu, Karak, Bannu(Domel), Ghoriwala, Lakki Marwat, Darra Pezu, Dera Ismail Khan |
Highway system | |
Passing through the three major Divisions of Khyber Pakhtunkhwa-Kohat, Bannu & D.I.Khan-by roads from the motorway will connect the cities of Kohat, Hangu, Karak, Bannu, Lakki Marwat, Tank and Dera Ismail Khan with the Kharlachi (D.I.Khan), Ghulam Khan (North Waziristan) and Angur Ada (South Waziristan) border crossings on the Durand Line-Afghanistan–Pakistan border to the west.
Details
editThe motorway will be around 360 km (220 mi) long and comprise 6 lanes, with 19 interchanges. The project has two tunnels of 7 km (4.3 mi) each. It is expected to be completed in a period of 4 years.[2]
List of Interchanges
- M1 Interchange
- Tarnab Interchange
- Ring Road Interchange
- Matni-Badaber Interchange
- Dara Adam Khel Interchange
- Kohat Interchange
- Sher Kot-Asterzai Interchange
- Raeesan-Jozara Interchange
- Hangu-Tall Interchange
- Karapa-Lachi Interchange
- Soor Dag Interchange
- Bannu-Domel Interchange
- Ghoriwala-Sarai Naurang Interchange
- Gazni Khel-Lakki Marwat Interchange
- Pezo-Tank Interchange
- Yark Hakla-Islamabad Interchange
- DI Khan Interchange
- Zhob Quetta Interchange
- Darya Khan-DI Khan Interchange
The PC-1 of the project was approved in August 2021. In September 2021, it was approved from Executive Committee of the National Council with an estimated cost of Rs300 billion.[3]
KP Government completed the feasibility study of the project in December 2022, and has entered into financing negotiations with Asian Development Bank (ADB) and the International Finance Cooperation (IFC) for loans covering 180 of the Rs. 300 billion required for the project. The remaining Rs. 120 billion are going to be contributed by the provincial government.[4]
See also
editReferences
edit- ^ "Peshawar-DI Khan Motorway PC-1 approved". www.thenews.com.pk. Retrieved 2021-09-12.
- ^ a b "KP govt approves Peshawar-DI Khan motorway project". Profit by Pakistan Today. 2020-12-21. Retrieved 2021-09-12.
- ^ "KP CM congratulates people on approval of Peshawar-D.I Khan, Dir Motorway". Dunya News. Retrieved 2021-09-12.
- ^ "KP completes feasibility study of Peshawar-DI Khan motorway". Pakistan Today. 2022-12-05. Retrieved 2022-12-09.