Queens Chapel Road Line

The Queens Chapel Road Line, designated Route R4, is a daily bus route operated by the Washington Metropolitan Area Transit Authority between the Highview Apartment Complex in Hyattsville, Maryland and Brookland–CUA station of the Red Line of the Washington Metro. The line operates every 20–35 minutes during peak hours, 70 minutes during midday service and 65–70 minutes on the weekends. R4 trips are roughly 30 minutes.

R4
Queens Chapel Road Line
Route R4 at Hyattsville Crossing
Overview
SystemMetrobus
OperatorWashington Metropolitan Area Transit Authority
GarageBladensburg
LiveryLocal
StatusIn Service
Began service1978
Ended serviceR6, R7: December 11, 1993
PredecessorsG7, G9, R2, R6, R7
Route
LocalePrince George's County, Northeast
Communities servedBrookland, University Heights, Michigan Park, Avondale, Mount Rainier, Hyattsville
Landmarks servedHyattsville Crossing station, West Hyattsville station
StartHighview Apartments
ViaQueens Chapel Road, Michigan Avenue NE
EndBrookland–CUA station
Service
LevelDaily
FrequencyPeak Hour: 20-35 minutes
Midday: 70 minutes
Weekend frequency65 minutes
Operates5:00 AM – 10:56 PM
Ridership301,926 (FY 2023)[1]
TransfersSmarTrip only
TimetableQueens Chapel Road Line
← R2  {{{system_nav}}}  R12 →

Background

edit

Route R4 operates daily between Brookland–CUA station and Highview, via Bunker Hill Road NE (towards Highview), 10th Street NE (towards the Brookland-CUA station), Perry Street NE (towards the Brookland-CUA station, Michigan Avenue NE, Queens Chapel Road, Ager Road, the West Hyattsville station, Ager Road, Hamilton Street, Queens Chapel Road, Belcrest Road, the Hyattsville Crossing station, East - West Highway (towards Highview), Belcrest Road, Toledo Terrace, Northwest Drive, Dean Drive, and Highview Terrace.

During light or moderate snowfall detours, route R4 would terminate at Hyattsville Crossing station with no service operating to Highview.[2] The route would be suspended if heavy snowfall occurs.

Route R4 currently operates out of the Bladensburg Metrobus Division.

Route R4 stops

edit

History

edit

Early history

edit
 
The R4 running to Brookland-CUA Station in 2014

In 1962,[4] G7 was created as a brand new DC Transit Route to operate as part of the "Prince George's Express" Line between Highview and Potomac Park, via Highview Terrace, Dean Drive, Northwest Drive, Toledo Terrace, Prince George's Plaza Shopping Center, Belcrest Road, Queens Chapel Road, Michigan Avenue NE, 4th Street NE, Lincoln Road NE, Rhode Island Avenue NE/NW (U.S. Route 1), 6th Street NW, Constitution Avenue NW, Virginia Avenue NW, and C Street NW. During this same exact time,[4] G9 was created as a brand new DC Transit Route to operate between the Prince George's Plaza Shopping Center and Potomac Park, via G7's exact same routing. G5 was eventually created as a DC Transit bus route to operate as prt of the "Prince George's Express" Line alongside Route G7, between Highview and Potomac Park, following most of the exact same routing only with the exception of going by Bureau of Engraving before continuing on to its Potomac Park, shortly around 1973 when WMATA took over DC Transit and other bus companies operating across the DC Area and merged them all together to form its own Metrobus System.

The G5, G7, and G9 routes were eventually discontinued on February 19, 1978 and replaced by Metrobus Routes R2, R4, R6, and R7 until February 19, 1978, shortly after the Brookland-CUA station opened.[5]

In 1975, R2 was created as a brand new Metrobus Route to operate as part of the "Calverton - Kennedy Center Line" between the Kennedy Center and Great Oaks Center (Calverton), via F Street NW, New Hampshire Avenue NW, 19th Street NW (southbound), 18th Street NW (northbound), Connecticut Avenue NW, Columbia Road NW, Harvard Street NW (northbound), Mount Pleasant Street NW (northbound), Irving Street NW (eastbound), Park Place NW (southbound), Michigan Avenue NW/NE, Queens Chapel Road, Belcrest Road, the Prince George's Plaza Shopping Center, Toledo Road, Adelphi Road, Campus Drive, Baltimore Avenue, Rhode Island Avenue, Powder Mill Road, and Cherry Hill Road.

On February 19, 1978, Route R2 was truncated to only operate between the Brookland–CUA station and Great Oaks Center (Calverton). Route H6 would replace R2's former routing between the Brookland-CUA station and Kennedy Center, during the times Metrorail service was available. However; R2 would still continue to make trips to the Kennedy Center when Metrorail was closed.

Route R4 was rerouted to operate between Brookland–CUA station and Hyattsville, via the exact same routing as Route R2 between the Brookland-CUA station and intersection of Queens Chapel Road & Hamilton Street in Hyattsville, and then operate via G4's former loop in Hyattsville, via Hamilton Street, Gallatin Street, 42nd Avenue, Farrugut Street, Baltimore Avenue, Gallatin Street, 42nd Avenue, Jefferson Street, 38th Avenue, and Hamilton Street.

Route R6 was rerouted to operate between Brookland–CUA station & Lewisdale, via th same routing as Route R2 between the Brookland-CUA station and intersection of Queens Chapel Road & Ager Road in Hyattsville, and then divert off Queens Chapel Road onto the intersection of Ager Road, and then operate via the former Route E6's Ager Road-Rhode Island Avenue Line Lewisdale Loop, via 23rd Avenue, Lewisdale Drive, Fordham Street, and 23rd Avenue.

Route R7, was rerouted to operate between Brookland-CUA station and Highview. R7 would operate on the exact same routing as Route R2, between the Brookland–CUA station and Prince George's Plaza Shopping Center, and then operate via the former G5 and G7's routing via Belcrest Road, Northwest Drive, Dean Drive, and Highview Terrace.

All Routes would be eliminated in Virginia as a result.

As Metrorail service began to become more available all Route R2 service to Kennedy Center was eliminated and all service was cutback to Brookland–CUA station, while H6 would completely replace the segment of its routing between the Brookland-CUA station & Kennedy Center altogether.

Service Simplification

edit

On December 11, 1993, when West Hyattsville and |Prince George's Plaza (now Hyattsville Crossing) stations opened, Route R6 was discontinued and both the R2 and R7 Metrobus Route were rerouted/shifted to operate as part of the "Riggs Road Line" between the Fort Totten station and Calverton, alongside the reincarnated Route R1 and R5, in order to replace the former Routes R8 and R9 that were discontinued.[6]

As a result, Route R4 was rerouted to operate between the Brookland-CUA station and Highview, instead of operating up to Hyattsville. Route R4 would operate on its usual routing between the Brookland-CUA station and intersection of Queens Chapel Road & Ager Road, then divert off Queens Chapel Road, onto the intersection of Ager Road in order to serve the newly opened West Hyattsville station, before returning onto Queens Chapel Road, via Ager Road and Hamilton Street, and then operating via the exact same routing as Route R7, between the intersection of Queens Chapel Road & Hamilton Street and Highview, via Queens Chapel Road, Belcrest Road, the Prince George's Plaza Shopping Center, Belcrest Road, Toledo Terrace, Northwest Drive, Dean Drive, and Highview Terrace, via Prince George's Plaza (now Hyattsville Crossing) station in between, replacing the former segment of Routes R2, R6, & R7's routing between Brookland-CUA station and the intersection of Queens Chapel Road & Ager Road, Route R2 & R7's routing between the intersection of Queens Chapel Road & Hamilton Street and Prince George's Plaza Shopping Center, and Route R7's former routing between the Prince George's Plaza Shopping Center and Highview.[6] A New Route R3 replaced Route R6's segment in Lewisdale while Routes 86, C2, F6. and F8 replaced portions of the former R2 routing.

Also, Route R4's former routing in Hyattsville between the intersection of Hamilton Street & Queens Chapel Road and Jefferson Street & 42nd Avenue, via Hamilton Street, 38th Avenue, and Jefferson Street was completely taken over by Route F8 while the R4's former Hyattsville loop, via 42nd Avenue, Farrugut Street, Baltimore Avenue, and Gallatin Street, was eventually replaced by Prince George's County TheBus Route 13 im 1996.

Later years

edit

On May 15, 2003, the former Metrobus bus bays in front of the former G.C. Murphy store inside Prince George's Plaza, were demolished in order to build a new Target store. Route R4 stopped directing entering into and looping inside the Prince George's Plaza.[7]

When the site of where the new Mosaic Apartments next to Prince George's Plaza (now Hyattsville Crossing) station, were being built, route R4 was rerouted to operate along East West Highway and turning onto Belcrest Road going to Highview from Prince George's Plaza (now Hyattsville Crossing) station due to the construction. Southbound service to Brookland station was unaffected by the change.

During the COVID-19 pandemic, Route R4 was reduced to operate on its Saturday supplemental schedule beginning on March 16, 2020.[8] However, on March 18, 2020, the route was further reduced to operate on its Sunday schedule and weekend service later suspended on March 21, 2020.[9] A modified schedule and all weekend service resumed on August 23, 2020.[10]

References

edit
  1. ^ "Metrobus FY2023 Annual Line Performance Report" (PDF). wmata.com. April 27, 2024. Retrieved May 28, 2024.
  2. ^ "Moderate Snow Routes | WMATA". www.wmata.com. Retrieved 1 February 2021.
  3. ^ "CUA Shuttle Bus Schedule" (PDF). CUA Department of Public Safety. Retrieved March 28, 2018.
  4. ^ a b "Vintage WASHINGTON DC Transit System Map from 1962 | #1929807774". Worthpoint. Retrieved 2024-04-16.
  5. ^ "R4 – Queens Chapel Road Line". Retrieved 25 February 2020.
  6. ^ a b Pierre, Robert. "METRO SHUFFLING ITS BUS SCHEDULE". Retrieved 23 February 2020.
  7. ^ "Metrobus service suspended at Prince Georges Plaza". www.gazette.net. Archived from the original on March 29, 2019. Retrieved February 23, 2020.
  8. ^ "Metro announces additional COVID-19 changes, including reduced service beginning Monday | WMATA". www.wmata.com. Retrieved 31 January 2021.
  9. ^ "METRO SERVICE LEVELS & HOURS FURTHER REDUCED TO SUPPORT ESSENTIAL TRIPS ONLY, STARTING WEDNESDAY | WMATA". www.wmata.com. Retrieved 31 January 2021.
  10. ^ "Metrobus Service Changes beginning August 23 | WMATA". www.wmata.com. Retrieved 31 January 2021.