The Rędziński Bridge (Polish: Most Rędziński) is a cable-stayed bridge spanning the Oder river in Wrocław, Poland. As a section of the A8 motorway bypassing the center of Wroclaw, the bridge links both sections of the route across the Oder, providing connections to the A4 motorway to the south, and to the S5 and S8 expressways to the northeast. With its pylon reaching a height of 122 m (400 ft) and having a total length of 1.7 km (1.1 mi), the Rędziński Bridge is the tallest and longest bridge in Poland.[1]

Rędziński Bridge

Most Rędziński
Coordinates51°9′24″N 16°57′35″E / 51.15667°N 16.95972°E / 51.15667; 16.95972
Carries6 lanes of
CrossesOder
LocaleWrocław, Lower Silesia,
 Poland
Maintained byGDDKiA
Characteristics
DesignCable-stayed
MaterialReinforced concrete and steel
Total length1.7 km (1.1 mi) or 1,742 m (5,715.2 ft)
Width38.58 m (126.6 ft)
Height122 m (400.3 ft)
Longest span256 m (839.9 ft)
No. of spans4 (50+256+256+50 m)
Clearance below18 m (59.1 ft)
History
DesignerJan Biliszczuk
Construction start2008 (2008)
Construction end2011 (2011)
Opened31 August 2011; 13 years ago (31 August 2011)
Location
Map

History

edit

Designed by Jan Biliszczuk, a professor of engineering at the Wrocław University of Technology, the bridge's design exceeded the length of the Solidarity Bridge in Płock by 30 m, then the longest bridge in the country.[2] The contracts for the bridge's construction were awarded to the Warsaw-based Mostostal consortium and its parent Spanish firm, Acciona Infraestructuras on 20 May 2008, with construction commencing shortly afterwards.[3] Construction of the bridge (and its main A8 motorway) continued for the next three years. Building efforts were temporarily halted during the 2010 Central European floods, but later resumed after a short delay.[4]

The structure was unofficially named the Rędziński Bridge by its builders due to the bridge's spanning of Rędzińska Island in the Oder. In August 2011, the Wrocław bureau of GDDKiA, the branch of the Ministry of Infrastructure tasked to roads, organized a naming competition of the bridge. After over 15,000 ballots cast, "Rędziński" won 55 percent of all total votes.[5] The name defeated other popular choices such as "Śląski" by a wide margin.[6]

Construction was completed by the end of August 2011. Financial costs for the bridge are estimated at 576 million PLN.[7] Shortly before the bridge's opening to public traffic, coinciding with the opening of the last sections of the A8 motorway, Prime Minister Donald Tusk visited the sight and praised its engineering. "This, I think, is a very good place and a very good moment to say that Poland is really under construction in a breathtaking way, at least in some places," Tusk was quoted.[8]

The bridge opened to A8 traffic on 31 August 2011,[9] just over a year before start of the UEFA Euro 2012.

Main span has 512 m long and consists of two cable-stayed spans 256 m long each. The bridge is the longest cable-stayed bridge with one pylon in Poland.

Images

edit

See also

edit

References

edit
  1. ^ "Rędziński kolos - największy most w Polsce". Gazeta Wyborcza (in Polish). 2011-08-26. Retrieved 2011-09-12.
  2. ^ "Most musi cieszyć". Gazeta Wyborcza (in Polish). 2010-02-24. Retrieved 2011-09-12.
  3. ^ "Autostradowa Obwodnica Wrocławia - Priorytetowa inwestycja drogowa Dolnego Śląska" (in Polish). Nowoczesne Budownictwo Inzynieryjne. 2011-08-23. Retrieved 2011-09-20.
  4. ^ "Powódź zatrzymała budowę mostów wrocławskich obwodnic". Gazeta Wyborcza (in Polish). 2010-05-26. Retrieved 2011-09-12.
  5. ^ "Wrocław residents name their new bridge". Wroclove2012. 2011-08-28. Retrieved 2011-09-12.
  6. ^ "Wyniki ankiety wyboru nazwy mostu AOW" (in Polish). GDDKiA. 2011-08-23. Retrieved 2011-09-20.
  7. ^ "Rędziński Bridge". Wroclove2012. 2010-07-20. Retrieved 2011-09-20.
  8. ^ "Wrocław: new motorway, stadium and air terminal". Chancellery of the Prime Minister of Poland. 2011-08-27. Retrieved 2011-09-12.
  9. ^ "Wrocław: Most Rędziński już otwarty" (in Polish). Budbazar. 2011-08-31. Retrieved 2011-09-20.
edit