The Sanibel Causeway is a causeway in Southwest Florida that spans San Carlos Bay, connecting Sanibel Island with the Florida mainland in Punta Rassa. The causeway consists of three separate two-lane bridge spans, and two-man-made causeway islands between them. The entire causeway facility is owned by Lee County and operated by the Lee County Department of Transportation (DOT). The causeway is 3 miles (5 km) long with a $6 toll for island-bound vehicles only.
Sanibel Causeway | |
---|---|
Coordinates | 26°28′35″N 82°01′32″W / 26.47639°N 82.02556°W |
Carries | 2 lanes of Causeway Boulevard |
Crosses | San Carlos Bay |
Locale | Sanibel, Florida |
Official name | Sanibel Causeway |
Maintained by | Lee County Department of Transportation |
Characteristics | |
Design | 3 concrete girder bridges |
Total length | 3 miles (5 km) |
Width | 40 feet (12 m) |
Clearance below |
|
History | |
Opened |
|
Statistics | |
Toll | For vehicles entering Sanibel Island only (westbound): |
Location | |
Portions of the causeway were destroyed by Hurricane Ian on September 28, 2022[2] and reopened on October 19, 2022.[3]
History
editBackground
editAs early as 1912, automobile ferries serviced Sanibel Island from the mainland at Punta Rassa. The idea of building a bridge from the mainland to the island was highly controversial amongst the early residents of the island, as many thought a bridge would ruin the beauty and isolated feel of the island, although one of the largest proponents of building a bridge was island resident Hugo Lindgren, who saw the island's potential and tried to convince Lee County to build a bridge. Despite the opinions of the islanders, it was clear that the ferries were insufficient by the mid-1950s as demand increased leading to long lines of vehicles waiting to cross the bay. Wildfires on the island in 1955 further convinced the county to build a bridge as it would improve access to the island for firefighters.[4]
Planning and construction
editAn early proposal would have had a bridge running from Point Ybel (where Sanibel Lighthouse is currently located) to the mainland, since it was the shortest route. The current route was ultimately selected due to the bay being shallower and two causeway islands could be created by dredging. While Bailey Road was then selected as the terminus of the bridge on the island, Hugo Lindgren granted the county right-of-way through his property on the bay, which the county accepted.[4] Construction on the entire causeway and the three original bridges lasted 15 months and cost $2.73 million. It was the last major project designed by Hector F.J. Estrup, civil engineer and owner of Caribbean Engineers.
Opening and early years
editThe Sanibel Causeway was completed and opened for traffic on May 26, 1963. Due to the causeway, Sanibel Island experienced major growth in the early 1970s leading to Sanibel's incorporation into Lee County's third city, which took place on November 5, 1974. Former congressman and CIA director Porter Goss served as Sanibel's first mayor.
By the early 1990s, the original bridges began showing signs of rapid deterioration due to the bay's saltwater, prompting the county to make major repairs. As a result, Lee County briefly proposed the idea of replacing the bridges with a single four-lane high-span bridge. This idea was abandoned due to opposition from island residents. Further repairs were made in 1997 as rapid deterioration from overall lack of maintenance and saltwater corrosion continued. In 2001, the county made plans to replace Bridges B and C, and make major repairs to Bridge A (the drawbridge).[5]
During a routine inspection in early 2003, severe cracks were discovered underneath a 48-foot (15 m) deck section on Bridge B. After this discovery, all three of the bridges were very closely monitored, and the damaged section was braced with additional steel pilings. Bridge B's speed limit was temporarily lowered to 10 miles per hour (16 km/h), and the rest of the causeway's speed limit was lowered to 20 miles per hour (32 km/h). A temporary 10-ton weight limit was put in place. Lee County determined that the 48-foot (15 m) deck section needed to be completely replaced as soon as possible. After extensive preparations, the causeway was shut down all day on January 20, 2003. The deck section was replaced with a steel grate section. The replacement was completed quickly, and the causeway re-opened ahead of schedule. After this turn of events, Lee County reexamined its original plan for rehabilitating Bridge A (the drawbridge), and concluded that all three of the bridges needed to be replaced as soon as possible.[6]
Replacing the bridges
editOnce it was decided to replace the drawbridge, there was a debate on replacing it with another drawbridge versus a high-span bridge. The county wanted a high-span, while a number of Sanibel residents wanted another drawbridge. Shortly before construction was set to begin on the high-span bridge, the city filed a lawsuit against Lee County in an attempt to stop construction. Sanibel claimed that Lee County did not maintain the bridges properly and used the toll revenue for other road projects. Lee County then filed a counter-lawsuit, claiming Sanibel was interfering with construction. A second lawsuit against Lee County was filed by a group of Sanibel residents who created a non-profit organization called "Save Our Bay, Inc." All of the lawsuits delayed construction and were eventually dismissed.
Construction of the high-span bridges commenced in May 2004. On August 13, 2004, the area was struck by Hurricane Charley, a Category 4 hurricane. The causeway received minor damage and was inspected before Sanibel residents were permitted to return to the island. In November 2004, the $3 toll was increased to $6 to finance construction. Construction on the high spans lasted three years and cost $137 million. An official grand opening ceremony for the bridges was held on September 8, 2007. The original drawbridge was later demolished, and their remains sunk into the water to create artificial reefs in the San Carlos Bay and the Gulf of Mexico.
In March 2020, Lee County-owned toll bridges were temporarily transitioned to all-electronic tolling due to the COVID-19 pandemic. This change became permanent on June 23, 2021.[7] The $3 administrative fee for vehicles without transponders was suspended during the pandemic and was reinstated on October 1.[8] The motorcycle discount plans were removed as part of the plan for a permanent transition to all-electronic tolling.[9]
Hurricane Ian
editOn September 28, 2022, Hurricane Ian partially destroyed the causeway, and the mainland approach was heavily damaged. Both the islands of Sanibel and Captiva were cut off from the mainland United States by road.[10][11] No deaths or injuries were confirmed by the Lee County Sheriff's Office.[12] After undergoing emergency repairs, the causeway reopened to trucks on October 11, and reopened to all vehicular traffic on October 20.[13]
Permanent repairs to the causeway were completed in 2024. As part of this work, improvements were made to the causeway’s design to better withstand future storms without cutting off access to the mainland.
The bridges
editBridge A
editBridge A is the bridge closest to the mainland at Punta Rassa. Bridge A is 70 feet (21 m) tall and stands as the tallest bridge in Lee County. The bridge previously holding this record was the nearby Matanzas Pass Bridge, which is 65 feet (20 m) tall. The original Bridge A was a 26-foot (7.9 m) high drawbridge. The current Bridge A finally opened for traffic on June 28, 2007, along with the current toll plaza.
The Sanibel-Captiva Optimists Club had held a raffle for the opportunity to be the operator of the drawbridge's machinery for its final opening. A private ceremony was held the day after the current bridge opened to commemorate the drawbridge's final opening. Seasonal Sanibel residents Bob and Ana Finks won the raffle, and they also got to keep the operating lever from the drawbridge's control room as part of the prize.[14]
Bridge B
editBridge B is the middle bridge, and is also the shortest of the three bridges. The current Bridge B opened for traffic on April 11, 2007, making it the first of the current spans to open. The current Bridge B was built ten feet taller than the original Bridge B to help reduce corrosion from salt spray, which was one of the major factors in the deterioration of the old bridge. Unlike the other two bridges, Bridge B is a low-level bridge, and has no navigation channel passing underneath.
The first few sets of piling from the original bridge on the south shore remain today. While the county initially planned to demolish the entire structure, a grassroots campaign was launched by local fisherman to have part of the span left intact for a fishing pier similar to the former spans of the Sunshine Skyway Bridge and the Overseas Highway. Despite the campaign initially succeeding, plans to install new deck sections on top of the pilings for the pier were scrapped in early 2010 due to budget cuts.[15]
Bridge C
editBridge C is the closest bridge to Sanibel Island, and is also the longest of the three bridges. Bridge C's vertical clearance over its navigation channel is 26 feet (7.9 m). The current Bridge C opened for traffic on September 8, 2007, making it the last of the current spans to open. Similar to Bridge B, the current Bridge C was also constructed ten feet taller than the original bridge.
Causeway Islands Park
editThe causeway's islands were dredged from the San Carlos Bay when the original bridges were built. Since the completion of the current bridges, the islands have been operated as Causeway Islands Park by Lee County Parks and Recreation. The islands are referred to as Island A and Island B, and they serve as public beaches. Island B includes restroom facilities on each side of the road. The islands have always been a popular area among beachgoers for windsurfing and kitesurfing.
Media references
editIn Blue Collar Comedy Tour: One for the Road (2006), comedian Ron White makes a reference to the old Sanibel Causeway bridge when he said he was pulled over for driving 11 mph (18 km/h) in a 5-mile-per-hour zone on one of the bridges. The speed limit was indeed reduced to 10 mph (16 km/h) on one of the bridges after speculation that the bridges were severely damaged from corrosion.
See also
edit- Bonita Beach Causeway – a four-bridge causeway between Bonita Springs and Fort Myers Beach
- Matanzas Pass Bridge – connects Fort Myers Beach (on Estero Island) with the mainland
- Cape Coral Bridge – toll bridge that crosses the Caloosahatchee River
- Midpoint Memorial Bridge – another toll bridge that crosses the Caloosahatchee River
References
edit- ^ "Sanibel Island Causeway". Archived from the original on February 19, 2013. Retrieved February 25, 2013.
- ^ Silva, Daniella (September 29, 2022). "Ian destroys section of Sanibel Causeway, cutting access to the island community". NBC News. Archived from the original on September 30, 2022. Retrieved September 30, 2022.
- ^ Almasy, Steve (October 19, 2022). "The causeway linking Sanibel Island to the Florida mainland has reopened to residents". CNN. Retrieved October 23, 2022.
- ^ a b Magg, Jeri (2011). Historic Sanibel & Captiva Islands: Tales of Paradise. The History Press.
- ^ "Sanibel Causeway Chronology and History". Island Sun. August 31, 2007.
- ^ Davis, Norah (September–October 2003). "Rebuilding a Community Link". Turner-Fairbank Highway Research Center. Archived from the original on March 5, 2007. Retrieved April 19, 2007.
- ^ "All-electronic tolls approved for three Lee County bridges". Fort Myers Florida Weekly. June 23, 2021. Archived from the original on January 11, 2022. Retrieved January 11, 2022.
- ^ "Administrative fees to return as Lee County bridges transition to all-electronic tolling". WFTX. September 29, 2021. Archived from the original on January 11, 2022. Retrieved January 11, 2022.
- ^ "New toll fees go into effect Oct. 1 for Sanibel, Cape Coral bridges". fortmyersbeachtalk.com. Archived from the original on January 11, 2022. Retrieved January 11, 2022.
- ^ "Section of Sanibel Causeway wiped out by Hurricane Ian". Tampa Bay Times. Archived from the original on September 29, 2022. Retrieved September 29, 2022.
- ^ "Hurricane Ian devastates SW Florida: Sanibel Causeway will need to be rebuilt, governor says". FOX 13 News. September 29, 2022. Archived from the original on September 30, 2022. Retrieved September 29, 2022.
- ^ "Ian destroys part of Sanibel Causeway, cutting off access to barrier islands". CBS News. Archived from the original on September 30, 2022. Retrieved September 29, 2022.
- ^ "Less than 3 weeks after Ian, Sanibel Island causeway reopens". TODAY.com. Retrieved October 22, 2022.
- ^ Cribbs, Judd (June 29, 2007). "Sanibel Drawbridge Opens for Last Time". WINK News. Archived from the original on June 19, 2009.
- ^ Whitehead, Charlie (January 26, 2010). "Docked: Sanibel Causeway fishing pier put on hold, for now". Naples Daily News.
External links
edit- Webpage for the toll bridge on the Lee County government website
- Webpage for the causeway islands park on the Lee County government website