This article needs additional citations for verification. (August 2021) |
The Sewell Valley Subdivision is a railroad line owned by CSX Transportation in the U.S. state of West Virginia. It was formerly part of the CSX Huntington East Division.[1] It became part of the CSX Florence Division on June 20, 2016.[2]
The line runs from Meadow Creek, West Virginia, to Nallen, West Virginia, for a total of 43.6 miles (70.2 km). At its south end the line wye's off of the New River Subdivision and at its north end the track comes to an end.[2] The line has junctions with the Rupert Subdivision and the G&E Subdivision.[1]
See also
editReferences
edit- ^ a b http://www.multimodalways.org/docs/railroads/companies/CSX/CSX%20ETTs/CSX%20Huntington%20Div%20East%20ETT%20%231%201-1-2005.pdf Huntington East Division Timetable
- ^ a b "SY-Sewell Valley Sub - The RadioReference Wiki". wiki.radioreference.com. Retrieved 2017-04-07.